Industry Unit; Creating the melter from the Satvik Sulfur Furnace with a new 8 10 mm plate and giving it a satisfactory trial by installing the steam coil; Buyer
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out coils in the melters of the Satvik Sulfur Furnace replacing them with new ones and conducting hydraulic testing and giving a sat..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the worn out plates of the vacuum filter condensers replacing them with new ones and giving a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the damaged weak steam coils in the film tine sulfur melters replacing them with new ones and conducting hydraulic testing and giving a sati..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Renovate and install a new SO2 chamber inside the coolers of the Satvik Sulfur Furnace and conduct a trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the old corroded SO2 gas line at the sulfur furnace station and install the new seamless MS line with flanges tightening the joints and bolts;..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the grooved plate of the mud mixture on the vacuum filter and repair it with the new plate provided; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the grooved plate of the filtrate tank located below the vacuum filter install the plate provided and perform a trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Repairing the weak parts of juice and mud with dry box of clarifier and making all the connections; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Patch the weak shell of the burning chamber of the film type sulfur furnace with the plate provided for a length of approximately 5 feet from the bottom a..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Patch the weak and rotten platforms of both vacuum filters with a new burner from the provided plate; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the SO2 chamber inside the last cooler of the film type sulfur furnace and installing a new one using the provided 10 mm MS plate and making all ..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Repairing the damaged clear juice bottles near the clear juice pumps and making all the connections and giving satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cut out and remove all rotten mud scrapers inside the door clarifier and install the provided plates and belts according to size and give a satisfacto..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Coat and remove the weak mud boot plates in each compartment of the clarifier and install the provided new plates; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repairing the weak parts of the agitator fitted on the vacuum filter and giving satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting out all the worn out weak cooling pipes and flanges of the coolers of the Satvik Sulphur Furnace and installing new flanges and cooling pipes usi..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting out the worn out weak flanges of the coolers of the Sulphur Furnace and installing new flanges using the provided plate and giving it a satisfact..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak corroded cross in the gas pipeline at the Sulphur Furnace Station and install the cross by making a new flange from the provided ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak corroded header of the Sulphur Furnace and install it from the provided plate and pipeline and connect the nipples and give a sat..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repairing the bagasse line leading to the mill installed above the vacuum filter station in the boiling house and conducting a satisfactory trial; Buy..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the brass SS tubes from the quad and store them; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Install the new brass SS tubes provided by the mill committee in the calandria expand them and conduct hydraulic testing of the calandria at a pressu..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer