| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.7 LAccepted-Finance | ₹82.7 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹89.0 L+₹6.2 L (7.54%)Rejected-Finance | ₹89.0 L+₹6.2 L (7.54%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹95.8 L+₹13.1 L (15.8%)Rejected-Finance | ₹95.8 L+₹13.1 L (15.8%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹1.0 Cr+₹19.5 L (23.5%)Rejected-Finance | ₹1.0 Cr+₹19.5 L (23.5%) | L4 | Rejected-Finance Being L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not found in order as per Summary of Technical Evaluation. |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
22 Jun 2026, 4:00 pmClosed
Executive Engineer
O/o The Inspector General Ftr Hqr SSB Tezpur
Construction of Residential Quarter Type IV 02 at SSB campus Barikachubri FTR HQR Tezpur Assam
2026_SSB_911990_1
NIT No.08/FTR-TZP/2026-27
Open Tender
Civil Works
Works
540 days
Barikachuburi Tezpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.4 L
Ftr Hqr SSB Tezpur
1 Jul 2026
10 Jun 2026
23 Jun 2026
10 Jun 2026
22 Jun 2026
13 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 225.2 | cum | 260.3 | ₹58,619.56 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 97.49 | cum | 700.5 | ₹68,291.75 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 10 | cum | 6,518.6 | ₹65,186 |
| 4 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) | 25.7 | sqm | 410.85 | ₹10,558.85 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 123.77 | sqm | 392.15 | ₹48,536.41 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 17.81 | sqm | 842.5 | ₹15,004.93 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 310.5 | sqm | 927.25 | ₹2,87,911.13 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Shelves (Cast in situ) | 5.09 | sqm | 927.25 | ₹4,719.7 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 631.51 | sqm | 736.4 | ₹4,65,043.96 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 165.89 | sqm | 961.3 | ₹1,59,470.06 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.38 MB
BOQ_958468.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .