Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
16 Oct 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Construction of new 33 KV, 11 KV, 11/0.4 KV S/s in EDSD, SIDCUL under EDD-I, Rudrapur
2026_UPCL3_100854_1
EDC(USN)53/2026-27
Open Tender
Electrical Works
Item Rate
365 days
SIDCUL Rudrapur
Pl. refer tender documents
4 documents required · 4 mandatory
₹1,180
EE ETD Rudrapur
₹75,000
1 Oct 2026
1 Oct 2026
17 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annexure-A (LABOUR CHARGES) | |||||
| 1.01 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrod with the help of G.I. wire as per construction manual. | 1 | No. | - | - |
| 1.02 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. | 1 | Kg. | - | - |
| 1.03 | Construction of Metering room for Metering Cubical at S/s end Including cost of building / material and it also include the cost of gate etc. of 10 feet height | 1 | PFS | - | - |
| 1.04 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work | 1 | CBM | - | - |
| 1.05 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per construction manual in 11 KV Line | 1 | No. | - | - |
| 1.06 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. | 1 | CBM | - | - |
| 1.07 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 1 | CBM | - | - |
| 1.08 | Erection of SP-55 single support pole after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual. | 1 | No. | - | - |
| 1.09 | Erection of SP-72 single support pole after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual. | 1 | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
TN532627TenderdocumentDepositSIDCUL.pdf
Tender Documents • 1.47 MB
FormAandB.pdf
Other Document • 0.67 MB
GeneralInstruction532627.pdf
Other Document • 0.76 MB
BOQ_118865.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .