Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹3.6 LRejected-AOC KARAPPURACKAL HPC VANDIPERIYAR | DHARMAPURI | TAMIL NADU | 635106 | ₹3.6 L | L2 | Rejected-AOC Second Lowest Bidder |
| Sl No | Description | Qty | Unit | Manikandan K V L2 | Ziraj.P.Rahim L1 |
|---|---|---|---|---|---|
| 1.00DRAINAGE | |||||
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 67.5 | cum | 809.03 ₹54,609.53 | 801.5 ₹54,101.25 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 5.62 | cum | 7,732.25 ₹43,493.91 | 7,660.24 ₹43,088.85 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 23.62 | cum | 7,556.5 ₹1.8 L | 7,486.13 ₹1.8 L |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 2.25 | cum | 7,891.4 ₹17,755.65 | 7,817.91 ₹17,590.30 |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 0.6 | cum | 8,492.97 ₹5,095.78 | 8,413.87 ₹5,048.32 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.74 | tonne | 86,275.65 ₹64,275.36 | 85,472.15 ₹63,676.75 |
Tender Value
₹4.2 L
EMD Value
₹10,587
Closing Date
25 Aug 2025, 6:00 pmClosed
Assistant Engineer
O/o Assistant Engineer,LIDEW Section,Peermade
PEERMADE GP - CONSTRUCTION OF PUTHULAYAM CRIMITORIUM DRIANAGE WARD 4 (263/26)-DRINAGE
2025_LSGD_787207_14
1/AE/LIDEW/PMD/2025-26
Open Tender
Civil Works - Roads
LID EW SECTION PEERMADE
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,587
Yes
17 Feb 2026
18 Aug 2025
27 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1294923.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid