| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Joby Abraham L2 | Eldho Varghese L1 |
|---|---|---|---|---|---|
| 1.00Road work | |||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 42.2 | cum | 400 ₹16,881.6 Lowest | 410 ₹17,303.64 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 14.31 | cum | 8,700 ₹1,24,470.9 | 8,370 ₹1,19,749.59 Lowest |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 68.68 | cum | 8,400 ₹5,76,912 | 8,180 ₹5,61,802.4 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 6.42 | cum | 9,500 ₹61,009 | 9,194 ₹59,043.87 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.97 | tonne | 1,00,437 ₹97,122.58 | 93,406 ₹90,323.6 Lowest |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 108 | cum | 600 ₹64,800 Lowest | 604 ₹65,232 |
| 1.01 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 54 | cum | 650 ₹35,100 | 612 ₹33,048 Lowest |
| 1.01 | OD178198/2024-2025:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.
10.26.1 M.S. tube | 556.8 | kg | 200 ₹1,11,360 | 190 ₹1,05,792 Lowest |
| 1.01 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 72.63 | cum | 3,000 ₹2,17,890 Lowest | 3,103 ₹2,25,370.89 |
Tender Value
₹14.0 L
EMD Value
₹34,893
Closing Date
18 Jun 2026, 3:00 pmClosed
Executive Engineer
O/o the Executive Engineer, LSGD Division, Kakkanad, Ernakulam.
Refer Tender Document
2026_LSGD_855467_1
ET08/MLA-ADS/EE/LSGD/26-27
Open Tender
Civil Works - Roads
Item Rate
365 days
KAKKANAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹34,893
Yes
28 Jul 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road work | |||||
| 1.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
| 1.002 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | - | cum | - | - |
| 1.003 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | - | cum | - | - |
| 1.004 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 1 | cum | - | - |
| 1.005 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | tonne | - | - |
| 1.006 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | - | cum | - | - |
| 1.007 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | cum | - | - |
| 1.008 | OD178198/2024-2025:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.
10.26.1 M.S. tube | 1 | kg | - | - |
| 1.009 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1445786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1445786.xls
BOQ • 0.24 MB
viewsbd.pdf
Tender Documents • 1.96 MB
RequisitionforEpaymentdocument.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .