| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.1 LAccepted-AOC HENNA MANZIL MAVELI PANMANA P O KARUNAGAPPALLY KOLLAM | KARUNAGAPPALLY | KOLLAM | KERALA | ₹79.1 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹89.7 LRejected-Finance | ₹89.7 L | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | Venad Designers and Contractors Pvt. Ltd. L2 | NOUSHAD KUTTY L1 |
|---|---|---|---|---|---|
| 1.00Ground Development work | |||||
| 1.01 | 2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 4 | each | 529 ₹2,116 | 577.51 ₹2,310.06 |
| 1.02 | 2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 12 | each | 2,337 ₹28,044 | 2,573.35 ₹30,880.25 |
| 1.03 | 2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 10 | each | 10,838 ₹1.1 L | 11,943.98 ₹1.2 L |
| 1.04 | 2.33.4 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 2 | each | 21,720 ₹43,440 | 23,928.17 ₹47,856.35 |
| 1.05 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,780 | sqm | 10 ₹17,800 | 9.72 ₹17,300.88 |
| 1.06 | OD60000/2025-2026 : Filling with available excavated earth(excluding rock) conveyed from Neendakara harbour to the open areas of proposed site at Chavara Panmana SBVSGHSS ground in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, lead up to 50m and lift up to 1.5m as per the direction of site Engineer-in-charge including all cost of conveyance, hire charges of machinery, all labour charges etc complete. ( Based on DSR Item No. 50.2.26.1 and 2.2.1) | 1,780 | cum | 575 ₹10.2 L | 530.57 ₹9.4 L |
| 1.07 | OD40155/2025-2026 : Filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and topmost layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site Engineer- in-charge. (Based on DSR Item No. 50.2.26.1 and 2.2.1) | 913.4 | cum | 633 ₹5.8 L | 472.46 ₹4.3 L |
| 1.08 | OD39516/2025-2026 : Supply and installation of movable type 7's Football Goal Post (3.65 m x 1.8 m x 1.2 m) made of pipe 10 cm dia GI pipe with nylon net as per direction of Engineer in charge | 1 | pair | 1,150 ₹1,150 | 26,212.5 ₹26,212.50 |
| 1.09 | OD39515/2025-2026 : Supply and installation of heavy-duty badminton post in aluminum and steel uprights option with built in weights and floor protection pads. Base, uprights and back supports can be detached. Rate also includes wheels for easy movement, steel uprights (comes in a pair), badminton net etc. Approval shall be taken prior to supply of item. | 4 | pair | 1,150 ₹4,600 | 23,364.12 ₹93,456.50 |
Tender Value
₹77.3 L
EMD Value
₹50,000
Closing Date
22 Jan 2026, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground Development work, Construction of Drainage, Fencing and Renovation works
2026_SKF_827668_1
435/SKF/CE/2025-26
Open Tender
Civil Works - Others
180 days
Kollam
Please refer tender document
6 documents required · 6 mandatory
₹2,950
₹50,000
21 Feb 2026
14 Jan 2026
24 Jan 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
Ground Development work
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
2.33.4 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD60000/2025-2026 : Filling with available excavated earth(excluding rock) conveyed from Neendakara harbour to the open areas of proposed site at Chavara Panmana SBVSGHSS ground in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, lead up to 50m and lift up to 1.5m as per the direction of site Engineer-in-charge including all cost of conveyance, hire charges of machinery, all labour charges etc complete. ( Based on DSR Item No. 50.2.26.1 and 2.2.1)
OD40155/2025-2026 : Filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and topmost layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site Engineer- in-charge. (Based on DSR Item No. 50.2.26.1 and 2.2.1)
OD39516/2025-2026 : Supply and installation of movable type 7's Football Goal Post (3.65 m x 1.8 m x 1.2 m) made of pipe 10 cm dia GI pipe with nylon net as per direction of Engineer in charge
OD39515/2025-2026 : Supply and installation of heavy-duty badminton post in aluminum and steel uprights option with built in weights and floor protection pads. Base, uprights and back supports can be detached. Rate also includes wheels for easy movement, steel uprights (comes in a pair), badminton net etc. Approval shall be taken prior to supply of item.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1: Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
60.7.1: DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD72352/2025-2026 : Providing and laying of interlock concrete block pavements having thickness 60mm (M35) as per drawings and technical specification clause 1504 confirming to IS 15658 and laid in required colour and pattern over and including 50mm thick compacted bed of 6 mm metal including edge concreting for 300mm width and 150mm depth with CC M35( @ 0.045 m3/m)
Construction of Drainage
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD66369/2024-2025 : Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete. (Based on MoRTH 55.25)
Fencing
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD66370/2024-2025 : Steel work for fencing with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete(Rate based on CPWD 50.10.2)
OD66371/2024-2025 : Supply and Installation of approved quality 2mm thick UV Stabilized Nylon net of Mesh size not greater than 50mm in existing GI poles including all charges as per the direction of Engineer in charge.(rate based on DAR 26.81)
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Renovation works
15.28.2 : Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet
15.34.1 : Dismantling and stacking with in 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of :T or L iron or pipe
15.17.2 : Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats
15.12.1 : Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2: Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
13.48.1 : Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.91: Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1389062.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdoc.pdf
Tender Documents • 1.36 MB
BOQ_1389062.xls
BOQ • 0.30 MB
DWG.pdf
Other Document • 0.86 MB
Download all tender documents and submit your bid