Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | ₹5.2 L | L1 | Accepted-AOC LOWER THAN OTHER FIRM AS L1 |
| 2 | L2₹5.4 LRejected-AOC | ₹5.4 L | L2 | Rejected-AOC HIGHER THAN L1 |
| 3 | L3₹5.9 LRejected-AOC | ₹5.9 L | L3 | Rejected-AOC HIGHER THAN THE L1 |
Tender Value
Refer Docs
Closing Date
6 Jul 2021, 9:30 amClosed
DISTRICT COMMANDER
ICGS PORT BLAIR HADDO, PANIPATH ROAD 744102
Defect Rectification onboard ICGS Durgabai Deshmuk
2021_ICG_455369_1
D-14/DBD/MW/VIII/070/21-22
Limited
Miscellaneous Services
90 days
ICGS PORT BLAIR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
14 Jul 2021
28 Jun 2021
7 Jul 2021
28 Jun 2021
6 Jul 2021
28 Jun 2021
28 Jun 2021 - 6 Jul 2021
H-014: During visual IRS surveyor inspection the following stag horn were found to be deteriorated. Copy of surveyor report attached. (i) 03 on stbd side( position 1(S), 3(S) & 4(S) (ii) 02 on port side ( position 1(P) & 3(P) Stag horn to be renewed as per sample. In way job includes, removal and re-fitment of associated fittings, lagging, angle frame etc., post fitment, two coat primer and one coat paint to b completed on stag horn.
H-015: The following air vent pipeline (or) gooseneck found to be corroded or deteriorated:- (i) Dirty oil tank port (ii) Fresh water tank (iii) Dirty/waste oil tank Vent pipe to be renewed as per sample. Inway job includes, removal and re-fitment of associated fittings, lagging, renewal of flanges bolts & nuts, goose neck flap, butterfly nuts. Mat:MS, Length: 10 mtr (each pipeline), Dia: 120 mm, No. of flanges: 04 (each pipeline), PCD: 135 mm, Total no of pipeline: 03 nos.
Amsath Ship Repairer
Island Ship Repairers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_507644.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid