| Sl No | Description | Qty | Unit | SAJEESH P L2 | AJITHKUMAR S. L1 |
|---|---|---|---|---|---|
| 1.00Vazhakkad LIS | |||||
| 1.00 | OD52791/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump,
detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and
placing them conveniently on the platform. | 1 | each | 776.45 ₹776.45 | 739.34 ₹739.34 |
| 1.00 | OD52789/2025-2026:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump,
detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and
placing them conveniently on the platform. | 2 | each | 5,416.24 ₹10,832.48 | 5,157.35 ₹10,314.70 |
| 1.00 | OD52790/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 969.61 ₹969.61 | 923.27 ₹923.27 |
| 1.00 | OD52788/2025-2026:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,(
Accessories when necessary ) and erecting the motor on the base plate coupling with pump,
erecting the starter regulator TP switch etc in position giving connections checking correct
alignment and trial run on full load | 2 | each | 7,934.99 ₹15,869.98 | 7,555.7 ₹15,111.40 |
| 1.00 | OD52793/2025-2026:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint. | 1 | each | 6,258.09 ₹6,258.09 | 5,958.96 ₹5,958.96 |
| 1.01 | OD264504/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition. | 1 | each | 3,588.74 ₹3,588.74 | 3,417.2 ₹3,417.20 |
| 1.01 | OD52792/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed | 1 | job | 7,163.84 ₹7,163.84 | 6,821.41 ₹6,821.41 |
| 1.01 | OD52794/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 25,405.64 ₹25,405.64 | 24,191.24 ₹24,191.24 |
| 1.01 | OD260140/2025-2026: Replacing the high carbon sleeve of the existing motor pumpset shaft by dismantling the pump , cleaning and providing fresh gland packing,greasing the bearings, changing oil seals etc,painting with two coats of best enamel paint,including necessary industrial works and correcting alignment of the motor pumpset, transportation ,etc | 1 | each | 9,939.68 ₹9,939.68 | 9,464.56 ₹9,464.56 |
Tender Value
₹3.4 L
EMD Value
₹8,421
Closing Date
21 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Vazhakkad Thirunnavaya 2nd and Valiyora LIS Malappuram Dt Fully Comprehensive Annual Maintenance Contract General Electrical Work
2026_Irrig_826030_16
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹745
₹8,421
6 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
Vazhakkad LIS
OD52791/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD52789/2025-2026:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD52790/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD52788/2025-2026:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD52793/2025-2026:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint.
OD264504/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition.
OD52792/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD52794/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD260140/2025-2026: Replacing the high carbon sleeve of the existing motor pumpset shaft by dismantling the pump , cleaning and providing fresh gland packing,greasing the bearings, changing oil seals etc,painting with two coats of best enamel paint,including necessary industrial works and correcting alignment of the motor pumpset, transportation ,etc
Valiyora LIS
OD52782/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD52784/2025-2026:Lifting the 11-30 HP pump after disconnecting the base frame, decoupling the motor, using chain block, rope, chain etc. and placing them conveniently on the platform.
OD52775/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD52776/2025-2026:Lifting the 16HP to 60 HP star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place
OD52781/2025-2026:Lifting the MCCB above 250A to 630 A after disconnecting the wire connection, detaching from the Panel board and placing them conveniently to a safe place
OD52779/2025-2026:Lifting the 5HP to 15 HP DOL / star delta starters after disconnecting the wire connection, detaching from the Panel board or Metal Frame and placing them conveniently to a safe place.
OD52786/2025-2026:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD52780/2025-2026:Dismantling the 11-30 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD52778/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD52777/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD52783/2025-2026:Lowering down and erecting 11-30 HP pump and other accessories,( Accessories when necessary ) and erecting the pump on the pump base frame coupling with motor, in position checking correct alignment and trial run on full load
OD66019/2025-2026:Refitting the 5HP to 15 HP DOL / star delta starters ,attach to the Panel board or Metal Frame and giving connection, testing and trail run on full load.
OD75950/2025-2026:Refitting the 16 HP to 60HP star delta starters ,attach to the Panel board or Metal Frame and giving connection, testing and trail run on full load
OD66020/2025-2026:Refitting the MCCB above 250A to 630 A ,attach to the Panel board and giving connection,
OD52785/2025-2026: Fully Comprehensive Annual Maintenance contract of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD82618/2025-2026:Fully Comprehensive Annual Maintenance contract of 11-30 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required ( excluding motor rewinding , works arrived due to natural and man made disaster like flood, landslide etc and starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
OD52787/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
Thirunavaya 2nd LIS
OD52798/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, including scrapping, cleaning and painting with enamel paint.
OD52796/2025-2026:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD264509/2025-2026:Dismantling the 31-60 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition.
OD52795/2025-2026:Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD52799/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , starter pipes and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD52797/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Rewinding
OD65593/2025-2026:Conveyance charge of 20 - 120 HP motor / pump / panel board / starter board etc by Tata acefrom pump house to workshop and bring back to pump house
OD264512/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
Bearing
OD65600/2025-2026:Replacing old bearing and supply new bearing no 6316 SKF/FAG or equivalent
OD65601/2025-2026:Replacing old bearing and supply new bearing no 6310SKF/FAG or equivalent
OD65602/2025-2026:Replacing old bearing and supply new bearing no 6309SKF/FAG or equivalent
OD260288/2025-2026: Supply & renewal of bearing No. 7312 BECBP
OD267650/2025-2026:Replacing old bearing and supply new bearing bearing no NU310 SKF/FAG OR equivalent
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1386202.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.32 MB
Vazhakkad10244NITSBDmerged.pdf
Tender Documents • 1.66 MB
BOQ_1386202.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid