EXECUTIVE ENGINEER
UNIVERSITY BUILDINGS DIVISION, OSMANIA UNIVERSITY
Providing roof and AC Sheets repairs to New B 11 Quarters, on the OU Campus.
723169
598/EE/UBD/2026, Dt: 24.07.2026
OPEN
Civil Works
HYDERABAD, TELANGANA
11 documents required · 11 mandatory
₹48
₹1,333
1 Aug 2026
1 Aug 2026
3 Aug 2026
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work Internal and external walls Ground floor
Dismantling of Old loosed cement plaster from walls/ceiling roof of terrace & racking out joints 20mm deep or from terraced roof & racking out joints from 50mm to 100mm deep & disposal of unserviceable materials with 100m lead as directed by Engineer-In-Charges including all labur charges etc., complete for finished item of works.
Providing and laying of 3mm thick app modified bitumen membrane treatment to the terrace duly [1]removing of existing tar felt. [2]cleaning of the surface from dirt, dust and other contaminations. [3]application of one coat of Bitumen primer [4]providing and laying of 3mm thick APP Modified Bitumen Membrane with 100 mm overlap fixing with butane torch.
Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete Brick masonry
Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Screened Sand) using Second Class Clay Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work. First Floor
Removing the 6 mm thick Corrugated Asbestos Cement Sheets, including with G.I ‘J’ bolts & nuts 8 mm dia G.I plain washers complete etc., complete for finished item of work, but including the cost of purlins, rafters, trusses & including cost of conveyance of all materials and labour charges etc., complete for finished item of work– upto 600 pitch
Roofing with 6 mm thick Corrugated Asbestos Cement Sheets, fixing with G.I ‘J’ bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & including cost of conveyance of all materials and labour charges etc., complete for finished item of work– upto 600 pitch
Flooring with Rough Shahabad Stone Slabs of 25mm thick 0.60m x 0.60m or any other size as specified, set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar (1:3) duly filling joints nearly, joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, labour charges for dressing of flooring stones etc., complete for finished item of work, etc., complete for finished item of work. (Departmental Supply)
Supply and fixing 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings complete for finished item of work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
New B11 Quarters - .xlsx
TENDER_DOCUMENT • 0.01 MB
New B-11 BD.doc
TENDER_DOCUMENT • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .