Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance CIGNUS 14TH 15TH FLOOR PLOT NO 71A KAILASH NAGAR MAYUR NAGAR PASSPOLI POWAI MUMBAI MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400087 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
3 Feb 2021, 2:00 pmClosed
AS PER NIT
AS PER NIT
EPCC-6 PROPYLENE RECOVERY UNIT FOR PETROCHEMICAL AND LUBE INTEGRATION LuPech J18 PROJECT AT IOCL GUJARAT REFINERY VADODARA GUJARAT INDIA
2020_REFHQ_126104_1
077154C/T/J18/LSTK-6
Global Tenders
Lump Sum TurnKey
960 days
GUJARAT
AS PER TENDER
5 documents required · 5 mandatory
₹1.8 Cr
Yes
ONLINE
22 Apr 2021
27 Oct 2020
4 Feb 2021
27 Oct 2020
3 Feb 2021
4 Jan 2021
28 Oct 2020 - 23 Nov 2020
24 Nov 2020
Amount
Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Site development and enabling jobs, Topography Survey, Soil Investigation and underground scanning mentioned in the bid and co-ordination for the same with Owner/PMC, Total Procurement (including chemicals, catalysts, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of Propylene Recovery Unit, Common Control Room and Common Substation for the Units as detailed in Bid Document and interconnection systems as per bid documents, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Catalysts (other than free issue) ,Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder/Indian Member of Consortium/JV, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYSERS (including GCs & AMDAS) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS,ESD, Gas Detection System (GDS) PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Machine monitoring system and Condition monitoring system as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFDs as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CCTV System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANTI-SURGE CONTROLLER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for SPEED GOVERNOR as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VENDOR PROPREITORY PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PAGING SYSTEM as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Electrical Process Heater Control Panel as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Pressurization system/ HVAC system as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR EPCC-6 PACKAGE AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR EPCC-6 PACKAGE
GUARANTEED HP STEAM CONSUMPTION FOR EPCC -6 PACKAGE
GUARANTEED COOLING WATER CONSUMPTION FOR EPCC-6 PACKAGE
GUARANTEED LP STEAM NET CONSUMPTION FOR EPCC-6 PACKAGE
Toyo Engineering India Private Limited
Chemie Tech DMCC
Tata Projects Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Chemie Tech DMCC
Tata Projects Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Chemie Tech DMCC
Tata Projects Limited
Petrofac International (UAE) LLC
Megha engineering and Infrastructures Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Tata Projects Limited
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Tata Projects Limited
Megha engineering and Infrastructures Limited
Chemie Tech DMCC
Toyo Engineering India Private Limited
Petrofac International (UAE) LLC
Tata Projects Limited
Tata Projects Limited
Petrofac International (UAE) LLC
Toyo Engineering India Private Limited
Megha engineering and Infrastructures Limited
US Dollar
European Euro
Japanese yen
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
European Euro
US Dollar
US Dollar
European Euro
US Dollar
European Euro
US Dollar
US Dollar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid