| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | ₹10.4 L | L1 | Accepted-Finance Loq |
| 2 | L2₹10.6 LRejected-Finance | ₹10.6 L | L2 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | N JOTHIMANI L2 | AYYASAMY MURUGESAN L1 |
|---|---|---|---|---|---|
| 1.00 | Improvements To The Kurumban (Main Bond ,Baby Pond,Retaining Wall,Bathing Ghat and Leading Channel Work)At Muthuvathur Panchayat PULLAMBADI PANCHAYAT UNION.Clearing the juliflora jungle without uprooting | 735 | sqm | 7 ₹5,145 | 6.2 ₹4,557 |
| 2.00 | Earth work in all soils except hard rock requiring blasting
and conveying for formation of bund with lead of 0 to 100
metre deploying earth moving machinery and tippers
including benching, formation of bunds, breaking clods,
sectioning etc., complete | 537.75 | CUM | 55 ₹29,576.25 | 51.45 ₹27,667.24 |
| 3.00 | BATHING GHAT:Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B | 109.89 | CUM | 220 ₹24,175.80 | 212.5 ₹23,351.63 |
| 4.00 | Filling in foundation & basement with good M sand including cost and conveyanceof all labour charges, sand slacking ramming etc., complete. | 10.13 | CUM | 1,700 ₹17,221 | 1,691.73 ₹17,137.22 |
| 5.00 | Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., | 8.62 | CUM | 5,000 ₹43,100 | 4,920.24 ₹42,412.47 |
| 6.00 | Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., | 45.11 | CUM | 5,300 ₹2.4 L | 5,250.26 ₹2.4 L |
| 7.00 | Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete | 124.6 | Sqm | 500 ₹62,300 | 454 ₹56,568.40 |
| 8.00 | R.C.C.1:1.5 :3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 5.55 | CUM | 8,400 ₹46,620 | 8,383.49 ₹46,528.37 |
| 9.00 | Supplying and fabrication of steel for all RCC items including all labour charges etc., complete. | 0.28 | MT | 87,400 ₹24,472 | 87,370.1 ₹24,463.63 |
| 10.00 | BABY POND AND LEADING CHANNEL :Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B | 39.72 | CUM | 250 ₹9,930 | 212.5 ₹8,440.50 |
Tender Value
₹10.5 L
EMD Value
₹11,000
Closing Date
2 Nov 2022, 3:00 pmClosed
Block Development Officer (VP)
Panchyat Union Office Pullambadi
Improvements To The Kurumban (Main Bond ,Baby Pond,Retaining Wall,Bathing Ghat and Leading Channel Work)At Muthuvathur Panchayat PULLAMBADI PANCHAYAT UNION.
2022_RDTN_258764_1
B3/0911/2022dt19.10.2022
Open Tender
Civil Works - Water Works
180 days
Pullambadi
Please refer the Tenter Documnets
5 documents required · 5 mandatory
₹0
₹11,000
Yes
15 Jun 2026
28 Oct 2022
2 Nov 2022
28 Oct 2022
2 Nov 2022
28 Oct 2022
Amount
Improvements To The Kurumban (Main Bond ,Baby Pond,Retaining Wall,Bathing Ghat and Leading Channel Work)At Muthuvathur Panchayat PULLAMBADI PANCHAYAT UNION.Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
BATHING GHAT:Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Filling in foundation & basement with good M sand including cost and conveyanceof all labour charges, sand slacking ramming etc., complete.
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc.,
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc.,
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
R.C.C.1:1.5 :3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete.
BABY POND AND LEADING CHANNEL :Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc.,
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc.,
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N JOTHIMANI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf