Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹3.5 L (29.9%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹65.8 L+₹54.1 L (462.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
22 Dec 2021, 5:00 pmClosed
Chief Officer
Bhor Municipal Council
Repairing and Maintainance of Pump set and Motors for Bhor Municipal Council
2021_DMA_744732_1
BMC/6/2021-22
Open Tender
Miscellaneous Services
Item Rate
365 days
Bhor Municipal Council
as per tender form
3 documents required · 3 mandatory
₹2,000
₹10,000
3 Jun 2025
8 Dec 2021
24 Dec 2021
8 Dec 2021
22 Dec 2021
8 Dec 2021
Amount
Rewinding of following H.P. V.T. Motor -/ Monoblock Motar capacity with “F” class copper wire insulation including Air drying ,varnishing with dr. bake warnish , backtoling , including all cost of skilled labour, dismentling motor, transportation , loading, unloading, erection, and giving trial and testing and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote)
Supply of Bearing No. 6318
Supply of Bearing No.7322
Supply of Bearing No. 6316
Supply of Bearing No.7320.13
Supply of Fan
Repairing of 90 HP V.T. Pumps -Dismantling and repairing and erection of following capacity v.t. pumps with bowl assembly , column pipe ,shaft, bearing ,bushing as par sapplied including all cost of skilled labour, Transportation, Loading unloading and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote)
Repairing of 60 HP V.T. Pumps -Dismantling and repairing and erection of following capacity v.t. pumps with bowl assembly , column pipe ,shaft, bearing ,bushing as par sapplied including all cost of skilled labour, Transportation, Loading unloading and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote)
Repairing of 50 HP V.T. Pumps -Dismantling and repairing and erection of following capacity v.t. pumps with bowl assembly , column pipe ,shaft, bearing ,bushing as par sapplied including all cost of skilled labour, Transportation, Loading unloading and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote)
Supply Of Various Parts For 90 H.P Pump Stuffing box bronze bushing.
Supply Of Various Parts For 90 H.P Pump Gland sleeve S/S material.
Supply Of Various Parts For 90 H.P Pump Top bowl repair with providing and welding of M.S. Flange heavy duty with required sundry etc.
Supply Of Various Parts For 90 H.P Pump Column pipe repair with welding if ribs M.S. flange with machining etc.
Supply Of Various Parts For 90 H.P Pump Rubber Bush
Supply Of Various Parts For 90 H.P Pump Shaft Sleeve S/S material
Supply Of Various Parts For 90 H.P Pump Providing and fixing special strengthening heavy duty nut bolts.
Supply Of Various Parts For 90 H.P Pump Rubber packing (Chanmpion)
Supply Of Various Parts For 90 H.P Pump Neck ring brass.
Supply Of Various Parts For 90 H.P Pump Bowl bush rubber.
Supply Of Various Parts For 90 H.P Pump bowl bush brass.
Supply Of Various Parts For 90 H.P Pump Bowl turning and surface counter top and bottom.
Supply Of Various Parts For 90 H.P Pump Impeller.
Supply Of Various Parts For 90 H.P Pump Impeller qualate.
Supply Of Various Parts For 90 H.P Pump Impeller qualate check nut.
Supply Of Various Parts For 90 H.P Pump Impeller Turning
Supply Of Various Parts For 90 H.P Pump Spider bushing
Supply Of Various Parts For 90 H.P Pump Bowl assembly fitting
Supply Of Various Parts For 60 H.P Pump Stuffing box bronze bushing.
Supply Of Various Parts For 60 H.P Pump Gland sleeve S/S material.
Supply Of Various Parts For 60 H.P Pump Top bowl repair with providing and welding of M.S. Flange heavy duty with required sundry etc.
Supply Of Various Parts For 60 H.P Pump Column pipe repair with welding if ribs M.S. flange with machining etc.
Supply Of Various Parts For 60 H.P Pump Rubber Bush
Supply Of Various Parts For 60 H.P Pump Shaft Sleeve S/S material
Supply Of Various Parts For 60 H.P Pump Providing and fixing special strengthening heavy duty nut bolts.
Supply Of Various Parts For 60 H.P Pump Rubber packing (Chanmpion)
Supply Of Various Parts For 60 H.P Pump Neck ring brass.
Supply Of Various Parts For 60 H.P Pump Bowl bush rubber.
Supply Of Various Parts For 60 H.P Pump bowl bush brass.
Supply Of Various Parts For 60 H.P Pump Bowl turning and surface counter top and bottom.
Supply Of Various Parts For 60 H.P Pump Impeller.
Supply Of Various Parts For 60 H.P Pump Impeller qualate.
Supply Of Various Parts For 60 H.P Pump Impeller qualate check nut.
Supply Of Various Parts For 60 H.P Pump Impeller Turning
Supply Of Various Parts For 60 H.P Pump Spider bushing
Supply Of Various Parts For 60 H.P Pump Bowl assembly fitting
Supply Of Various Parts For 50 H.P Pump Stuffing box bronze bushing.
Supply Of Various Parts For 50 H.P Pump Gland sleeve S/S material.
Supply Of Various Parts For 50 H.P Pump Top bowl repair with providing and welding of M.S. Flange heavy duty with required sundry etc.
Supply Of Various Parts For 50 H.P Pump Column pipe repair with welding if ribs M.S. flange with machining etc.
Supply Of Various Parts For 50 H.P Pump Rubber Bush
Supply Of Various Parts For 50 H.P Pump Shaft Sleeve S/S material
Supply Of Various Parts For 50 H.P Pump Providing and fixing special strengthening heavy duty nut bolts.
Supply Of Various Parts For 50 H.P Pump Rubber packing (Chanmpion)
Supply Of Various Parts For 50 H.P Pump Neck ring brass.
Supply Of Various Parts For 50 H.P Pump Bowl bush rubber.
Supply Of Various Parts For 50 H.P Pump bowl bush brass.
Supply Of Various Parts For 50 H.P Pump Bowl turning and surface counter top and bottom.
Supply Of Various Parts For 50 H.P Pump Impeller.
Supply Of Various Parts For 50 H.P Pump Impeller qualate.
Supply Of Various Parts For 50 H.P Pump Impeller qualate check nut.
Supply Of Various Parts For 50 H.P Pump Impeller Turning
Supply Of Various Parts For 50 H.P Pump Spider bushing
Supply Of Various Parts For 50 H.P Pump Bowl assembly fitting
Repairing Of Starter
Rewinding of 90 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 60 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 50 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 25 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 12.5 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 10 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 7.5 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 5 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 3 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Rewinding of 2 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.)
Transformer Oil – Replacement of hevy duty of standard Transformer Oil including all cost of Trasformer Oil, transportation , erection, and all applicable Taxes. (old Transformer Oil should tekan by contractor and cost of scrap should deduct and final offer should quote.)
4 POLE FIDER PILLER
90 HP कॉलम शॉफ्ट 40 X 1500 M.H
50 HP कॉलम शॉफ्ट 40 X 1500 M.H
Fitter
Lebour
4 core armoured Cable (Copper) 16 sq mm
4 core armoured Cable (Copper) 25 sq mm
4 core armoured Cable (Copper) 30 sq mm
4 core armoured Cable (Copper) 35 sq mm
4 core armoured Cable (Aluminium) 16 sq mm
4 core armoured Cable (Aluminium) 25 sq mm
4 core armoured Cable (Aluminium) 30 sq mm
4 core armoured Cable (Aluminium) 35 sq mm
Bus Bar 100 A
Bus Bar 200 A
MANSI RAJENDRA JARAD
ATHARV ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .