Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC | ₹9.3 L | 1 | Accepted-AOC 1 |
| 2 | 2₹9.5 LRejected-AOC | ₹9.5 L | 2 | Rejected-AOC 2 |
| Sl No | Description | Qty | Unit | A.M.ABDUL SALAM L1 | T.K.SUNEESH MOHAMMED L2 |
|---|---|---|---|---|---|
| 1.00Retarring | |||||
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 212.4 | sqm | 459.74 ₹97,648.78 | 470 ₹99,828 |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,200 | sqm | 17.35 ₹38,170 | 18 ₹39,600 |
| 1.00 | 75.5.9.1.2pb:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65) | 2,200 | sqm | 254.42 ₹5.6 L | 260 ₹5.7 L |
| 1.00 | 75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65) | 2,200 | sqm | 107.13 ₹2.4 L | 110 ₹2.4 L |
Tender Value
₹8.5 L
EMD Value
₹21,184
Closing Date
26 Aug 2025, 3:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer , Kalamassery Municipality
GENERAL-SO 90/26-Retarring of Alambimoola road in ward 18-General Civil Work
2025_LSGD_788144_9
LIDEW/AEE/ET/13/2026
Open Tender
Civil Works - Roads
180 days
Kalamassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,860
Yes
₹21,184
Yes
2 May 2026
19 Aug 2025
27 Aug 2025
19 Aug 2025
26 Aug 2025
19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1297359.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
sbd9.pdf
Tender Documents • 1.79 MB
BOQ_1297359.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid