Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹1,425 (0.36%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.9 L+₹96,325 (24.3%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
2 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Varghese P.O
SM (P and P)-CD
Instrumentation Maintenance Work Assistance in FACT-CD, Willingdon Island Ammonia Handling site-A (AHSA) and Q10 area for 2023-24.
2023_FACT_740649_1
04028/2022-2023/E26825
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDN 105,CDN 106 and CDN 111)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
15 Mar 2023
15 Feb 2023
3 Mar 2023
15 Feb 2023
2 Mar 2023
15 Feb 2023
Instrumentation Maintenance Work Assistance in FACT-CD Willingdon Island Ammonia Handling site-A (AHSA) and Q10 area for 2023-24.
The work includes removal of pH sensor from line, cleaning of sensor as per standard procedure, calibration checking of pH sensor as per procedure using standard buffer solutions after connecting with transmitter. All materials for the job will be provided by FACT free of cost.
The work includes removal of Thermowell-element assemblies/Thermowell pockets (Flange size upto size 1.5 inch, length upto 1500mm) for inspection, refurbishing the fittings, leak checking, minor welding if required for leak proofing and fixing back with proper gaskets, nuts and bolts. Note: All materials required for the work will be provided by FACT free of cost.
The work includes isolating the pressure gauge by closing the isolation valve, removal of Pressure Gauge (dial size 250mm max and connection 1/2" NPT) and its manifold from line, and refixing it back. All materials for the job will be provided by FACT free of cost.
The work includes removal of old defective air filter regulators (end connection size ¼" or ½ ") of Control valves / I/P convertors from line & fixing new air filter regulators of same size. All materials required for the work will be supplied by FACT as free issue.
The Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe, length approx. 130cm) with base plate of size 225mm X225mm X 6mm and fixing the stanchion using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
The work includes fabrication of instrument supports (size 50 NB, SCH80 MS/SS pipe,"L"shape size 300X 200mm approx) and fixing the support using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
Installation of Junction Boxes:The work includes transportation of Junctions boxes of size 350x420x150mm (approx), Canopies/Enclosures and MS/Aluminum angles, necessary items (including free supply items from FACT) from W.Island Lab / Stores to site. The work also includes installation of the canopies/enclosures [Dimensions: 550X 450X 325mm (H X W X D)], installation & mounting of Junction boxes inside the canopies on newly fabricated AL/MS frame supports. The work shall also include fabrication of the MS/aluminum frame supports with necessary holes drilled for mounting the JBs and fixing it on to the available structures by welding/using fasteners (SS bolt,SS nut and SS washers of size M10X60 to be supplied by contractor) or grouting on to the structure including minor civil work required for fixing JBs. The supply of fasteners as detailed above is included in this item. Unused gland holes in the JBs shall be covered with proper blanking plugs. MS supports shall be painted with two coat epoxy paint over suitable primer. Note: The Junction Box, MS angles/flats and blanking plug shall be supplied by FACT free of cost.
The work includes fixing of FRP/ GRP diagonal enclosure of size 450X400X400 (W X D X H) approx for existing field instruments. The enclosure shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. All materials required for the work will be supplied by FACT as free issue
The work involves fixing of FRP/ GRP canopies of size 550X 450X 325mm (W X D X H) approx for existing junction boxes. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. All materials required for the work will be supplied by FACT as free issue
The work includes fixing of FRP/ GRP canopies of size 360 X 445 X 370mm (W X D X H) approx for existing field instruments. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles. All materials required for the work will be supplied by FACT as free issue
Laying of Signal/Power Cables - 1 Pair/1 Triad/2 Triad/3 Core: The work includes transportation of cables to site, Installation of signal/ power cables-1 pair/1 triad/2 Triad/3 Core with wires of size 0.5/1/1.3/2.5 SQMM by laying on new/existing cable tray/rack/clamping on the wall/structure/routing through GI pipe/trenches. The cables are to be laid from junction boxes to field instruments. Dressing of cables in racks shall be using Aluminum strips of size 20x5mm at intervals of min. 1 meter on horizontal runs and 30 cm on vertical runs. The scope of work includes fixing identification tags on both end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The aluminum flat strips shall be fixed using M6X40 SS Fasteners. The supply of fasteners and SS wire as detailed above is in the scope of contractor. Note: Cables and identification tags will be supplied by FACT free of cost.
The work includes glanding of the signal and power cables of size 12/20 pair / 12 Triad on junction boxes / field instruments using double compression / single compression glands of proper size. 1.25 inch and 1.5 inch. Standard stripping tools shall be used for peeling of cables so as to ensure quality in work. All the material required for the work will be supplied by FACT as free issue
The work includes glanding of the signal and power cables of size 1 pair / 1 Triad in junction boxes/field instruments using double compression / single compression glands of proper size. Standard stripping tools shall be used for peeling off cables so as to ensure quality in work. All the material required for the work will be supplied by FACT as free issue.
Work includes refurbishment of Termination wiring connections inside Instrument Junction Boxes. The Junction Boxes house upto 20no.s of single pair cables and 1no.s of 20pair Multicable (max 80 terminations). The work involves replacement of all damaged Terminal blocks, cleaning of wire ends, putting wiring Ferrules, crimping of wire ends with lugs and tight Terminations.All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge/Engineer-In-Charge.
Work includes de-coupling and removal of Actuator part from Control Valve Assembly. After related valve works have been completed, the Engineer-In-Charge shall direct the worker to fix back the actuator onto the Valve body. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge/Engineer-In-Charge.
Work includes fixing of specified size Flanges at inlet side of a Control Valve (Body Size less than or equal to 3inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Engineer-In-Charge. The work shall be carried out at Workshops at W.Island area. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge/Engineer-In-Charge.
Work includes gland packing of control valves of various sizes. The gland nut, follower and spacer shall be removed.The existing worn out gland packings shall be removed properly from the Valve prior to packing with new packing glands provided. The gland nut, follower and spacer shall be fixed back The work shall be deemed to be completed if the Gland leakage test is found to be OK All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge/Engineer-In-Charge.
Work includes removal of existing Positioner from Control Valves in line and replacement of these with a supplied calibrated new one. All the fitting connections has to be properly lined up without any leaks. The Positioner linkage shall be coupled to the valve correctly as per the specified Stroke length & Direction. Once installed, the Stroke of the valve shall be checked as per instruction from shift-In-Charge/Engineer-In-Charge. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge/Engineer-In-Charge.
The work includes laying of 6 mm/8mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. All materials required for the work will be supplied by FACT as free issue.
The work includes Laying of 14mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. Note:All materials required for the work will be supplied by FACT as free issue
The work includes calibration checking of NH3/SO2/LPG detectors & sensor cleaning. Note:All materials required for the work will be supplied by FACT as free issue
Supply of unskilled workers for attending instrumentation miscellaneous works such as cleaning of local panels, control valves etc and instrument installations in general, transportation of materials from plants to lab and from stores to plants etc. on 8 hour shift basis, as directed by Engineer in Charge.
BABY B
HASSAN MM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_778750.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .