| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Work Awarded |
| 2 | L2₹16.1 L+₹1.9 L (13.3%)Rejected-AOC | ₹16.1 L+₹1.9 L (13.3%) | L2 | Rejected-AOC Work not Awarded |
| 3 | L3₹17.0 L+₹2.8 L (19.6%)Rejected-Finance | ₹17.0 L+₹2.8 L (19.6%) | L3 | Rejected-Finance 3rd |
| Sl No | Description | Qty | Unit | kottackal timbers L2 | SAM GEORGE L3 | SEBIN XAVIER L1 |
|---|---|---|---|---|---|---|
| 1.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.All kinds of soil | 8.1 | cum | 331 ₹2,681.1 | 336 ₹2,721.6 | 296 ₹2,397.6 Lowest |
| 2.00 | 4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size) | 7.2 | cum | 8,220 ₹59,184 | 8,224 ₹59,212.8 | 6,500 ₹46,800 Lowest |
| 3.00 | 5.1.3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of
centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size) | 5.76 | cum | 9,580 ₹55,199.96 | 9,583 ₹55,217.25 | 7,500 ₹43,215 Lowest |
| 4.00 | 5.22A.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and
binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 86.4 | kg | 110 ₹9,504.22 | 114 ₹9,849.83 | 95 ₹8,208.19 Lowest |
| 5.00 | od58924/2023_2024
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50<br>mm including
strengthening with 2 mm dia wire or nuts or welded , bolts and washers as required complete as per
the<br>direction of Engineer-in- charge. Made of G.I. wire of dia 2 mm | 900 | sqm | 580 ₹5,22,000 | 585 ₹5,26,500 | 550 ₹4,95,000 Lowest |
| 6.00 | 13.52.1
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 225 | sqm | 249 ₹56,025 | 254 ₹57,150 | 223 ₹50,175 Lowest |
| 7.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50 m.All kinds of soil | 15 | cum | 331 ₹4,965.33 | 336 ₹5,040.34 | 220 ₹3,300.22 Lowest |
| 8.00 | 4.1.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size) | 15 | cum | 8,220 ₹1,23,308.22 | 8,227 ₹1,23,413.23 | 6,500 ₹97,506.5 Lowest |
| 9.00 | 10.1
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting,
fixing in position and applying a priming coat of approved steel primer all complete. | 4,050 | kg | 115 ₹4,65,750 | 120 ₹4,86,000 | 105 ₹4,25,250 Lowest |
| 10.00 | 16.18.1
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every
15th post, last but one end post and corner post shall be strutted on both sides and end post on one side
only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | 12,500 | mtr | 25 ₹3,12,500 | 30 ₹3,75,000 | 20 ₹2,50,000 Lowest |
Tender Value
₹14.7 L
EMD Value
₹36,850
Closing Date
11 Nov 2024, 5:00 pmClosed
DFO, Punalur
O/o DFO,Punalur
Estimate for the cost of construction of chain link and barbed fencing around Karavallor Nagaravanam Project area at Kelankavu in Karavalloor Section of Anchal Range during 2023-24.
2024_FD_679896_2
06/2024-25
Open Tender
Civil Works - Others
Item Rate
90 days
Kelankavu
Details attached separately
3 documents required · 3 mandatory
₹3,480
₹36,850
Yes
5 Jan 2026
23 Oct 2024
13 Nov 2024
23 Oct 2024
11 Nov 2024
23 Oct 2024
Amount
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
od58924/2023_2024 Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50<br>mm including strengthening with 2 mm dia wire or nuts or welded , bolts and washers as required complete as per the<br>direction of Engineer-in- charge. Made of G.I. wire of dia 2 mm
13.52.1 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
10.1 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
16.18.1 Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
kottackal timbers (BID ID -1962851)
SAM GEORGE (BID ID -1971584)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1091147.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .