Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.4 L
EMD Value
₹2,850
Closing Date
13 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE JSV Mandi
Supply and installation of Submersible pumping machinery with allied accessories
2025_HPIPH_119590_1
11862-961
Open Tender
Pumps/Motors
Item Rate
90 days
Sadyana
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹2,850
6 Nov 2025
4 Nov 2025
14 Nov 2025
4 Nov 2025
13 Nov 2025
4 Nov 2025
Submersible Pump: Providing and fixing of submersible monoblock pumping set confirming to ISO 9906 of KSB/Calama/ johnsion/Grundfos /JSV approved make comprising to latest relevant IS Code 8034:2002(latest edition). The pump should be fitted with bronze impller of suitable alloys. suitable for having greased packed bearing and shaft with wound stator on motor side and with soft protection sleeve on pump side ensuring better life for shaft coupled to a submersible squirrel cage electric induction motor IE 2 or above(water proof type) of required HP RPM 2900 of Kirloskar /NGEF/Crompton /JSV approved make conforming to BIS 9283-2013 latest with upto date amendmednts totally dust and water proof for submersible duty isolated from the pump by intermediate casing with double mechanical seal in oil chamber and grease packed lubricated bearings and provided with stainless steel thrust bearing plate to with stand non vertical loads with minimum wear and tear.It should also be fitted with a device to take up expansion of water with the heating of motor. The pump set should include water level guard errection clamps cable clip & depth gauge etc. & suitable for operation on data given below :-Discharge (0)-0.42 LPS for each pump.,Total Dynamic head:-132.64 meters,(e) Discharge head-125.00 Meters,Static head-125 meters
Providing and fixing of control panel consisting of Ampere meter, voltmeter DOL Starter, MCB starting and running capacitor complete with internal wiring for operating above set from original manufacture of ISI/BS make complete in all respects.
Providing and Fixing of M.S. angle iron frames complete with steel sheet fabricated enclosures for housing of energy meter as well as control pannel for operating complete having door on front with locking arrangement from front side complete in all respects in all leads and lifts.
Providing and Fixing Three Core flat water proof Copper Cable of Havells/KSB/Finolex makes. having following sizes suitable for running of motors of following capacity in all leads and lifts.S ize 1 x 3 x 2.50 sq mm.
Providing and Fixing Holding Wire (Heavy Duty) complete in all respect in all leads and lifts.
Providing laying, jointing and testing of PPR Pipe Poly proplyene random Co-polymer pipe type-3(pn-16/SDR 74.4/53.2) (HSN code :39172200) Three layers-Mono layer conformming to IS 15801-2008 & fitting to DIN 16962 heaving working pressur 25kg/cm2 with pipe fitting complete in all leads and lifts. 32mm dia
Providing and fixing C.I. adopter set complete in all leads and lifts.
Providing and fixing Gun Metal Wheel valve, M.S. Plate steel Rope and GI clump, band, Reducer, water proof packing and tape roll complete in all respect and in all leads and
Providing and fixing G.I. fittings to the plumbing work of different size to make connection for water tapsin all respect in all leads and lifts
Providing ,Laying, jointing and testing in trenches galvanised mild steel tubes (Light Class) screwed and socketed, ISI marked, conformining to IS:1239 & latest with upto date ammendments including tube fitting such as bends,tees, air valves, unions and collars etc. as per direction and to the entire satisfaction of the Engineer-in-charge (Earth work in trenches to be measured and paid for separately) in all leads and lifts. 32mm dia (LC)
The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge.
GI pipe shall be supplied by the department free of cost from the JS Divisional store Raghunath ka Padahar on proper indent.
The Contractor will be fully responsible for watch and ward of material at site of work.
Nothing shall be paid for rejected/sub-standard material at site of works.
The work should be completed in the stipulated period.
No deviation will be allowed without the prior permission of the Engineer-in-charge.
1% labour cess will be deducted from the bill of the contractor.
JS Division Mandi
The firm shall forward a copy of supply order/indent placed by it for the supply of pumps and motors on the manufactures/authorized dealers of the pump and motors to the consignee within 30 days after issue of the letter of intent/award by the Engineer-in-Charge.
The firm shall arrange dispatch of offered pumps and motors to the consignee direct from the manufacturers /their authorized dealers of the pumping machinery for which the supply order/indent has been placed by the firm. The packing slip should indicate the details of materials in the package and material of construction of pumps and motors.
The shop test for the pumps and motors shall be carried out at manufacturers works in the presence of representative of the department as per IS-325-1978.The test performance certificate of the pumping machinery shall be arranged by the firm from the manufacturers and get it approved from the Engineer-in-charge before actual dispatch of the pumping machinery
The firm shall supply the recommended list of spares and quantities required for normal working of pumping machinery(2 years) from the manufacturers of the aforesaid equipment at the time of quoting rates and shall quote items rates for the same also.
The firm shall supply the manufacturer’s manual for the operation and maintenance of the pumping equipments.
The firm shall arrange operation and maintenance training to the operating staff for the pumping machinery (without extra cost) for a period of 7 days i.e. during the testing period.
The characteristic curves of the pumping equipment shall be supplied with the offer, other wise the tender shall be rejected.
The firm shall supply layout drawing in respect of various components ,such as suction pipes, valves, cable trenches, control panel etc. from the foot valve location to the common header, which shall extend upto 5 meter from the outer walls of the pump house towards rising main. The details of foundations required for various components shall also be supplied by the firm within 30 days of the letter of indent /award.
The installation of pumping machinery above 100 HP shall be inspected by the technical representative of the manufacturers, of rank not less than that of a services Engineer, at the work site and inspection certificate shall be supplied to the Engineer-in-charge .This inspection shall be in addition to the test report and nothing extra shall be paid on this account.
The wiring and installation of electric equipment shall be as per HPSEB rules and regulations and subjected to the approval of the Chief Electrical Inspector and or his authorized officer. Any defect pointed out shall be rectified by the firm without any extra cost. The wiring and installation of all electrical equipment shall be done by a licensed contractor of approved class of HPSEB authorities on their approved format (form D)for release of power connection by the firm without extra cost.
The temporary electric connection, if required during installation shall be arranged by the firm at its own cost and energy charges shall also be paid directly by the firm to the HPSEB.
Prices of all items shall be F.O.R. site of work inclusive of all leads and lifts and shall be inclusive of all charges of transportation, insurance, packing, taxes and duties such as sale tax, excise duty, local taxes etc.
The rates shall be quoted only on the format of schedule of quantities, which is attached with the tender document giving all specified data so desired therein.
The rates offered for the specified makes in the schedule of quantities only shall be considered .Rates quoted for part or non specified makes shall lead to rejection of the tender.
The location of site can be ascertained from the concerned Assistant Engineer, and the rates quoted by the firm shall be inclusive of all mechanical and manual transport within all leads and lifts to the site of work.
The contractor is requested to inspect the site before quoting his rate.
All the equipment/ material shall conform to the relevant BIS specifications, wherever applicable and in its absence to any accepted National/International standards.
The general specifications of work shall conform to Punjab PWD/HPPWD specifications as per direction of the Engineer-in-charge.
The validity of the tender shall not be less than 120 days otherwise the tender shall be summarily rejected.
All the equipments shall be guaranteed against any manufacturing defect including metallurgy and its performance for a period of 12 (twelve)months from the date of commissioning. Any defect, if noticed within the stipulated period shall be rectified by the firm at its own cost within 15 days of bringing the same to its notice. The guarantee clause shall be substantiated by a guarantee bond of a Nationalized Bank for an amount equal to the cost of pumping and electrical equipment (accessories included)pledged in the name of the Executive Engineer-in-Charge at the time of applying for refund of security deposits. The guarantee bond shall be released after the expiry of the guarantee period.
The installed pumping machinery and other allied accessories shall be tested daily for stipulated pumping hours in the NIT (20 Hours) for a period of seven days without extra cost. However the cost of electricity and water shall be borne by the department.
During the guarantee period efficiency of the pumping and the electric equipment should not vary beyond the range(+/-)2.5%. If during guarantee period, the efficiency falls beyond 2.5% to a maximum of 5%,1% cost of the pump set for 1% fall of the efficiency shall be deducted. In case of fall of efficiency beyond 5% the pump set shall be rejected and cost of the effected pump set recovered from the pledged Bank guarantee and or from the security deposit as the case may be.
90% (Ninety percent) payment of the cost of pumping machinery and equipment less 10% security and other statutory recovery shall be made after receipt of complete pumping machinery i.e. pump and motors along with accessories received together at site of work in good condition. The balance 10% cost after deduction of the security and other recoveries shall be released after successful and satisfactory installation ,testing of entire equipment. Ten percent security deposits shall be released as stipulated in the agreement.
90% (Ninety percent) installation charges shall be released after satisfactory installation of all the pumping and electrical equipment. Remaining 10% of installation charges shall be released after testing of the entire equipment .
Executive Engineer
JS Division Mandi
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.57 MB
Form8.pdf
Tender Documents • 1.05 MB
BOQ_175093.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .