Loading…
Loading…
Tender Value
₹5.7 Cr
EMD Value
₹11.5 L
Closing Date
28 Jul 2026, 11:00 am
Cutting and widening of high banks in the approaches of major and minor bridges, Improvement of cess, Trolley Refuge and Other Protection work under the jurisdiction of Assistant Divisional Engineeer Shahdol of Bilaspur Division.
DRM-ENGG-BSP-T-135-26-27
DRM-ENGG-BSP-T-135-26-27
Open
12 Months
Bilaspur, Himachal Pradesh
₹0
₹11.5 L
4 Jul 2026
4 Jul 2026
14 Jul 2026
Item Breakup - A-USSOR-2021
cum Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
38000.00 breaker etc. where blasting is not permitted due to special circumstances and if specifically ordered in writing including drilling and all incidental works thereto.
43000.00 beyond original lead of 2 km over item nos. 012011 to 012014 BILASPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
3800.00 minimum 50mm dia. spaced equally
20000.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
4500.00 making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge. BILASPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY
4750.00 cuttings in hard soils which require picks or crow bars for hacking including soils containing stones or boulders of size under 0.03 cum without infringing the nearby track, as directed by engineer-in-charge at site including cutting of earth, loading, leading by contractor's vehicles, unloading at site, dumping on spoil bank by head loads and utilising same excavated earth for widening of existing formation in embankment as per standards, duly rolling manually at 2:1 slope and levelling bank to the required profile including watering and compaction with contractor's labour or mechanically operated rollers with all contractor's labour, clearing of jungle, benching etc., tools, plants, vehicles etc. complete with lead up to 1000m and all lifts including crossing of track, wherever necessary. Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous m a t e r i a l except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.
70.00 3909.79 x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in- charge. Note: Earth-work will to be paid separately under relevant item. Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
1025.00 minimum 1.10 cum bucket capacity
700.00 1066.22 of 12T capacity for misc. works of handling of material Total 57392583.05
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Formation_compressed.pdf
ATTACHMENT
Annexure H
ATTACHMENT
AnnexureLBGFORMAT.pdf
ATTACHMENT
AnnexureM.pdf
ATTACHMENT
CE16revised.pdf
ATTACHMENT
CE16revised_1.pdf
ATTACHMENT
AnnexureAEngg.Org..pdf
ATTACHMENT
AnnexureBPlantMachinery.pdf
ATTACHMENT
AnnexureCWorkinHand.pdf
ATTACHMENT
AnnexureE-EFTdetail.pdf
ATTACHMENT
AnnexureJNew.pdf
ATTACHMENT
Specialconditionofcontract135_1.pdf Special condition of contract
ATTACHMENT
Annexure-WExperiance.pdf
ATTACHMENT
Annexure-YC.A.certificate.pdf
ATTACHMENT
Annexure-HBidsecurityformatnew.pdf
ATTACHMENT
Specialconditionofcontract135_1.pdf
ATTACHMENT
Download all tender documents and submit your bid