| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.3 CrAdmitted-Finance | ₹5.3 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Netconnect Technology L2 | ARAD VENTURES PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Covered Conductor -11kV 99 Sq.mm AAAC | 85,605 | m | 29,27,691 ₹1.6 Cr | 26,61,733.39 ₹1.5 Cr |
| 2.00 | Pole A Type GI 13 M | 567 | E | 39,44,619 ₹2.2 Cr | 38,20,864.11 ₹2.1 Cr |
| 3.00 | Pin Insulator 11kV Composite Polymeric | 756 | E | 27,760.32 ₹1.5 L | 25,154.39 ₹1.4 L |
| 4.00 | V CROSS ARM GI SET(WITH CLAMP BOLT&NUT) | 584 | Set | 1,63,251.36 ₹9.1 L | 1,54,453.87 ₹8.6 L |
| 5.00 | Disc Insulator 11 kV Composite Polymeric | 1,262 | E | 39,298.68 ₹2.2 L | 30,407.64 ₹1.7 L |
| 6.00 | Hardware fittings for 11kV covered Conductor 99 sq mm | 513 | E | 57,343.14 ₹3.2 L | 48,026.96 ₹2.7 L |
| 7.00 | Single core outdoor termination kit for covered conductor | 287 | Set | 78,419.88 ₹4.4 L | 2,30,606.62 ₹12.8 L |
| 8.00 | IPC Connector -Bare to Covered Conductor | 133 | E | 13,358.52 ₹74,214 | 3,735.6 ₹20,753.32 |
| 9.00 | Tension/Anchoring clamp assembly with tracking protection IPC for covered conductor | 1,934 | E | 2,90,332.08 ₹16.1 L | 92,794.87 ₹5.2 L |
| 10.00 | Helically formed Cable tie for covered conductor | 2,856 | E | 1,83,526.56 ₹10.2 L | 63,504.3 ₹3.5 L |
Tender Value
₹4.7 Cr
EMD Value
₹1 L
Closing Date
22 Jan 2026, 4:00 pmClosed
The Deputy Chief Engineer,EC,Manjeri
Office of the Deputy Chief Engineer, Electrical Circle, Vydyuthi Bhavanam, Manjeri (P.O), Malappuram, Kerala - 676121
Malappuram Package No.6 - Supply and Construction of 11 kV Lines using Covered conductor Raccoon for the Development of Distribution Infrastructure on a Turnkey Basis under the Dyuthi Special Scheme at Various Locations under the EC,Manjeri(Retender)
2025_KSEB_818198_2
EC/Manjeri/Dyuthi Special/e-Tender/2025-26/06 dated 01.11.2025
Open Tender
Electrical Works
180 days
Various locations under Electrical Circle, Manjeri
Please refer the tender documents.
9 documents required · 9 mandatory
₹8,850
₹1 L
Online Platform
10 Apr 2026
1 Jan 2026
28 Jan 2026
7 Jan 2026
22 Jan 2026
7 Jan 2026
7 Jan 2026 - 15 Jan 2026
16 Jan 2026
Covered Conductor -11kV 99 Sq.mm AAAC
Pole A Type GI 13 M
Pin Insulator 11kV Composite Polymeric
V CROSS ARM GI SET(WITH CLAMP BOLT&NUT)
Disc Insulator 11 kV Composite Polymeric
Hardware fittings for 11kV covered Conductor 99 sq mm
Single core outdoor termination kit for covered conductor
IPC Connector -Bare to Covered Conductor
Tension/Anchoring clamp assembly with tracking protection IPC for covered conductor
Helically formed Cable tie for covered conductor
Lightning Arrester 9 kV,10 KA (Distribution class) Composite Polymer Housing
Channel cross arm -75x40x6mm 1.8M
CROSS ARM GI CHANNEL 4 LINE (4 Line Channel Cross Arm) with Clamp, Bolt & Nut for PSC Pole 8M/200kg
GI Wire 8 SWG
Bolt&Nut GI with washers of various sizes
Earthing Coil GI 115 Turns 50 mm internal Dia dia
Ferrules 5 Sq.mm(GI)
Stainless Steel Buckle Slot width 10.5 mm x 1.5 mm,Thickness 1.2 mm.
Pipe GI 40 mm dia -2.5 m Length( Earth Pipe)
Earth Chamber (PVC) With RCC Covering Slab
Crimping Socket Palm Type 50 Sq.mm -Al(Cable Lug)
Stay Insulator Porcelain 11k V
Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI))
Turn Buckle ,Eye bolt with 2 Nuts 20 mm dia -GI(Stay tightner HT)
Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire)
Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod)
Helically formed Guy-Grip HT
Thimble GI 75 mm x 22 mm x 40 mm ,1.5 mm Thickness (For HT and LT)
Clamp GI For HT Stay/Strut
Crimping Socket Palm Type 120 Sq.mm -Al (Cable Lug)
Pole A Type GI 11 M
Pole PSC 9 M
Pole A Type GI 12 M
Pole Top Bracket -F Type GI -11 kV
Mid span joint for 99 sq.mm Covered conductor
IPC Connector -Covered to Covered Conductor
Channel cross arm GI 100 x 50 x 6 mm - 3 mt
CROSS ARM GI CHANNEL 2 LINE (2 Line Channel Cross Arm) with Clamp, Bolt & Nut for PSC Pole 8M/200kg
SHACKLE INSULATOR 415V SET(WITH STRAP BOLT&NUT)
Composite polymeric pin insulator with pin 1.1 kV
Channel cross arm GI 100 x 50 x 6 mm 2.4 mt
MVT Kit for HT ABC (3 Nos)
Clamp GI for HT Cross arm
Disc insulator 11 kV composite polymeric - covered conductor
Insulator Tie for Covered Conductor
Anchor Clamp For Covered Conductor
Suspension Clamp Assembly for Covered Conductor Up to 95 Sq.mm
Dead End Clamp Assembly ( Anchoring Assembly) for Covered Conductor Up to 95 Sq.mm
Stainless Steel Strap 20 mm x 0.7 mm
Stainless Steel Buckle Slot width 20.5 mm x 1.5 mm,Thickness 1.2 mm.
Stainless steel locking clamp with bolt and nut including stainless steel strip 40mm X 50mm (suitable for covered rabbit)
Air Break Switch (AB Switch) 11kV 400 A , Composite Polymer Housing
Cleat GI for 11kV Disc insulator
Insulation Piercing connector Bare to covered conductor
Non-metalic alignment tie (Pin insulator) for covered conductor
Drop Out Fuse 11kV 200A (Polymeric)
IPC Connector - Covered Conductor Earthing
Cable End Termination Kit - For 70 Sq.mm HT Covered Conductor-Heat Shrinkable ( Out Door)
Item Wise BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Fitting and providing one Strut using A type pole incl. digging & back filling pit.
Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.
Drilling hole of various sizes on existing Channel/Cross Arm.
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Additional rate for excavation of Pit for A type pole in Laterite.
Additional rate for excavation of Pit for A type pole in Hard Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.
Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified.
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
Additional rate for excavation of Pit for A type pole in Soft Rock.
Additional rate for excavation of Pit for A type pole in Rock.
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
Fitting and providing one Strut using HT PSC pole using proper size of strut clamp ( GI) including digging and back filling pit in all classes of soil. The Cost includes cost of Strut clamp also.
Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable
Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.
Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc.
Cutting Channel/Cross Arm/Angle Iron into two pieces.
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting one set AB switch and giving connection
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.
Erection of Anchor clamp / dead end clamp of 11 KV ABC suitable for 70 to 120 sqmm bare/insulated Messenger
Erection of suspension clamp of 11KV ABC suitable for 70 to 120 sq mm bare/insulated messenger
Additional rate for providing one disc set on any type of HT pole for making cut point.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work.
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
Erection of Stainless Steel Strap and Buckles
Fitting one additional HT pin with insulator
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.
Dismantling one LT 2 line cross arm from existing pole.
Dismantling one LT 4 line cross arm from existing pole.
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
Straightening one slanted 11kV pole after unbinding the line and rebinding the line after work.
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
Fitting and providing one HT Fly stay for 11kV pole using A type pole incl. digging & back filling pits.
Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
11 KV AB Cable Termination instalation for 3 Core
Dismantling one damaged AB switch from existing structure.
Dismantling one HT pin insulator with pin and bring back to section store.
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.
Dismantling transformer station in DP structure excluding the rate of dismantling earthing
Dismanling transformer station with transformer erected in plinth excluding the rate of dismantling transformer
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged HT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.
Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling (without damage) one LT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.
Reshackling one span LT OH Addl conductor, replacing insulators, tightening stay, cutting tree branches incl. conveyance.
Renewing one 1.8m Channel cross arm on the 11kV Pole incl. dismantling and conveyance.
Erecting one 100kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
TOTAL BOQ1 (Materials( Total Ex-work price of Materials + Total Transportation cost ) excluding GST.)
TOTAL BOQ2 (Installation / Erection Charges (Excluding GST)
TOTAL AMOUNT [1+2] (Excluding GST)
Discount offerred by Bidder(If any)
BOQ 3: TOTAL excluding GST [3 - 4]
Grand Total including GST (5+ GST Amount of BOQ1+GST Amount of BOQ2 )
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_1382393.pdf
techsummary_1382393.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BOQ_1382393.xls
BOQ • 0.46 MB
Vol2AEmployersRequirement.pdf
Tender Documents • 2.13 MB
RetenderMPMPackage06BidDocumentVol1.pdf
Tender Documents • 2.06 MB
Vol2BTECHNICALSPECDYUTHISPECIAL.pdf
Tender Documents • 2.55 MB
RetenderMPMPackage06BidDocumentVol3.pdf
Tender Documents • 2.48 MB
GTPDYUTHISPECIAL.pdf
Tender Documents • 2.29 MB
MPMPackage06WorkLocation.pdf
Tender Documents • 0.06 MB
ApprovedVendorList.pdf
Tender Documents • 0.23 MB
MPMPKG6PreQualificationQuestionnaire.pdf
Other Document • 0.09 MB
RetenderNITEngMPMPackage06.pdf
Tender Documents • 0.39 MB
RetenderNITMalMPMPackage06.pdf
Tender Documents • 0.18 MB
DrawingsALL.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid