| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹34.2 L+₹1.8 L (5.40%)Rejected-Finance | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹35.7 L+₹3.2 L (9.92%)Rejected-Finance | L3 | Rejected-Finance Not being lowest bidder | |
| 4 | L4₹36.6 L+₹4.1 L (12.8%)Rejected-Finance DOOR NO 10 89 BC COLONY PAPAYYARAJUPALEM SUJATHANAGAR VISAKHAPATNAM 530 051 | VISAKHAPATANAM | ANDHRA PRADESH | 530051 | L4 | Rejected-Finance Not being lowest bidder | |
| 5 | L5₹36.7 L+₹4.2 L (13.1%)Rejected-Finance 66 6 410 1 MULAGANDA HOUSING COLONY GAJUWAKA DEPOT VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L5 | Rejected-Finance Not being lowest bidder |
| Sl No | Description | Qty | Unit | GVR ENGINEERING WORKS L7 | M/s UMAMANI CONSTRUCTIONS L15 | MSN ENGINEERING WORKS L11 | PRIYA CONSTRUCTIONS L3 | M/S SRI VENKATA BHAVANI CONSTRUCTIONS L6 | REAL ENGINEERING WORKS L8 | M/S CHANDRA ENGINEERS AND CONTRACTORS L13 | DHEERU BUILDERS L12 | venkata sai constructions L9 | SRI SIDDHI VINAYAKA ENTERPRISES L1 | M/s KAMADHENU ENGINEERING CONSTRUCTIONS L4 | SAMPATH ENTERPRISES L14 | S R CONSTRUCTIONS L2 | jyothi constructions L10 | GVR CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for earthing complete with galvanized iron earth plate electrode 600mm x 600mm x 6 mm thick buried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters below normal ground level connecting to GI strip 32x6 mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanized iron or steel and earth strip protected by 50mm dia GI pipe medium grade and connected to pole structure/ panel board/earthing test point all as shown in electrical plate No. 3 of SSR Part-I(2009) and testing on completion Including taking out old unserviceble GI earth plate & strip of any description, complete all as specified and directed.
Note :- The unit rate quoted shall also include for excavation, earth work in any type of soil, plain cement concrete 1:3:6 mix, Type C1 pit, 40mm thick RCC 1:2:4 mix type B1 cover reinforced with 8mm dia TMT bras @ 150mm C/C both ways, GI funnel with watering pipe, wire mesh, protection pipe, earth strip up to 7.50m long complete in addition to item No. 1(a) to (e) of preamble (Notes) under sub heading earthing, specified in SSR Part II | 425 | Each Job | 6,960 ₹29,58,000 | 9,800 ₹41,65,000 | 7,600 ₹32,30,000 | 6,375 ₹27,09,375 | 6,500 ₹27,62,500 | 6,500 ₹27,62,500 | 8,000 ₹34,00,000 | 8,075 ₹34,31,875 | 6,976 ₹29,64,800 | 5,400 ₹22,95,000 Lowest | 6,650 ₹28,26,250 | 8,000 ₹34,00,000 | 5,540 ₹23,54,500 | 7,800 ₹33,15,000 | 6,310 ₹26,81,750 |
| 2.00 | Material and labour for Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required with 32 X 6 mm GI strip complete including taking down of existing earth strip of any description, complete all as specified and as directed by Engineer-in-Charge. | 3,000 | RM | 170 ₹5,10,000 | 75 ₹2,25,000 Lowest | 218 ₹6,54,000 | 161 ₹4,83,000 | 230 ₹6,90,000 | 340 ₹10,20,000 | 180 ₹5,40,000 | 160 ₹4,80,000 | 236 ₹7,08,000 | 180 ₹5,40,000 | 195 ₹5,85,000 | 300 ₹9,00,000 | 190 ₹5,70,000 | 180 ₹5,40,000 | 225 ₹6,75,000 |
| 3.00 | Material and labour for 80 mm dia, light grade galvanized iron (GI) pipes with necessary fittings, laid in trenches / fixed to walls and ceilings or laid in floors for passing of Earth strip, complete all as specified and as directed by Engineer-in-Charge.
Note:- The quoted rate shall deemed to be inclusive of cutting and making good of PCC, Plinth protection/PCC flooring/PCC hard standing etc as per site requirement. | 400 | RM | 1,260 ₹5,04,000 | 700 ₹2,80,000 | 790 ₹3,16,000 | 750 ₹3,00,000 | 800 ₹3,20,000 | 700 ₹2,80,000 | 900 ₹3,60,000 | 950 ₹3,80,000 | 979 ₹3,91,600 | 810 ₹3,24,000 | 485 ₹1,94,000 Lowest | 650 ₹2,60,000 | 900 ₹3,60,000 | 550 ₹2,20,000 | 614 ₹2,45,600 |
| 4.00 | Material and labour for 50 mm dia, light grade galvanized iron (GI) pipes with necessary fittings, laid in trenches / fixed to walls and ceilings or laid in floors for passing of Earth strip, complete all as specified and as directed by Engineer-in-Charge.
Note:- The quoted rate shall deemed to be inclusive of cutting and making good of PCC, Plinth protection/PCC flooring/PCC hard standing etc as per site requirement. | 200 | RM | 795 ₹1,59,000 | 475 ₹95,000 | 460 ₹92,000 | 395 ₹79,000 | 450 ₹90,000 | 350 ₹70,000 | 700 ₹1,40,000 | 290 ₹58,000 Lowest | 496 ₹99,200 | 450 ₹90,000 | 290 ₹58,000 Lowest | 400 ₹80,000 | 700 ₹1,40,000 | 450 ₹90,000 | 356 ₹71,200 |
| 5.00SCHEDULE OF CREDIT Note :- Amount of Rs. 1,73,250.00 indicated in Tender Documents as Schedule of Credit shall be deducted from the total quoted amount of BOQ. | ||||||||||||||||||
Tender Value
₹49.9 L
EMD Value
₹99,800
Closing Date
11 Jun 2026, 6:00 pmClosed
Garrison Engineer Utility-II Visakhapatnam
Garrison Engineer Utility-II 104 Area Industrial Estate Post Visakhapatnam -530 007
SPECIAL REPAIR FOR REPLACEMENT OF EARTHING OF PUMP SETS, AC PLANTS AND DG SETS ALONGWITH CONNECTED ITEMS, AREA UNDER AGE (E/M)-I OF GE (U-II) VISAKHAPATNAM
2026_MES_766589_1
8150(A)
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garrison Engineer Utility-II Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Garrison Engineer Utility-II
₹99,800
Yes
4 Aug 2026
20 May 2026
12 Jun 2026
20 May 2026
11 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for earthing complete with galvanized iron earth plate electrode 600mm x 600mm x 6 mm thick buried directly in ground (earth pit not less than 2.25 meters deep below ground level) with top edge of the plate not less than 1.5 meters below normal ground level connecting to GI strip 32x6 mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanized iron or steel and earth strip protected by 50mm dia GI pipe medium grade and connected to pole structure/ panel board/earthing test point all as shown in electrical plate No. 3 of SSR Part-I(2009) and testing on completion Including taking out old unserviceble GI earth plate & strip of any description, complete all as specified and directed.
Note :- The unit rate quoted shall also include for excavation, earth work in any type of soil, plain cement concrete 1:3:6 mix, Type C1 pit, 40mm thick RCC 1:2:4 mix type B1 cover reinforced with 8mm dia TMT bras @ 150mm C/C both ways, GI funnel with watering pipe, wire mesh, protection pipe, earth strip up to 7.50m long complete in addition to item No. 1(a) to (e) of preamble (Notes) under sub heading earthing, specified in SSR Part II | 425 | Each Job | 1.25 | ₹531.25 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
8150_Tender.pdf
Tender Documents • 0.64 MB
BOQ_858527.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .