Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC RASHANGGAR SHOPPING COMPLEX RADHANAGAR WARD NO 12 AGARTALA MUNICIPAL CORPORATION WEST TRIPURA TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | ₹22.6 L | L1 | Accepted-AOC Accepted L1 bidder |
| 2 | L2₹23.3 L+₹70,167 (3.10%)Rejected-Finance | ₹23.3 L+₹70,167 (3.10%) | L2 | Rejected-Finance L2 bidder |
Tender Value
₹23.3 L
EMD Value
₹46,623
Closing Date
15 May 2026, 3:00 pmClosed
EE, CCD, Kunjaban Extension
o/o the EE, CCD, Kunjaban Extension
Maintenance of Govt. residential building during the year 2026 27 S.H Repair maintenance of type I 63 nos and II 151 nos Qtrs. At KTS under Central -IV Sub-Division, Kunjaban, Agartala. Group-I.
2026_CEPWD_72630_1
15/DNIT/EE/CCD/PWD/2026-27
Open Tender
Civil Works
Percentage
180 days
Kunjaban
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹46,623
9 Jul 2026
7 May 2026
15 May 2026
8 May 2026
15 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 3.5 | cum | 231.6 | ₹810.6 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 2 | cum | 1,177.3 | ₹2,354.6 |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: | |||||
| 3.01 | 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 40 mm nominal size) | 1.5 | cum | 10,204.6 | ₹15,306.9 |
| 3.02 | 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 9 | cum | 8,980 | ₹80,820 |
| 4First class brick work in foundation and plinth including cost of all materials as required complete:- | |||||
| 4.01 | In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 5 | Cum. | 9,845.2 | ₹49,226 |
| 5First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- | |||||
| 5.01 | In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 2.5 | Cum. | 11,410.19 | ₹28,525.48 |
| 6Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:- | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73908.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_73908.xls
BOQ • 1.49 MB
fdnit.pdf
Tender Documents • 3.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .