Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹38 (<0.01%)Admitted-Finance | ₹3.8 Cr+₹38 (<0.01%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹40.0 L (10.5%)Admitted-Finance | ₹4.2 Cr+₹40.0 L (10.5%) | L3 | Admitted-Finance |
| 4 | L4₹4.6 Cr+₹80.0 L (21.1%)Admitted-Finance | ₹4.6 Cr+₹80.0 L (21.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical AT PO NUAPADA PS K NUAGAN DIST GANJAM ODISHA PIN 761011 | GANJAM | ODISHA | 761011 | - | - | Rejected-Technical Non furnish of document |
| Sl No | Description | Qty | Unit | Akash Dalai L2 | Surya Narayan Patnaik L3 | SURYA NARAYAN SAHU L1 | KESHAB PRADHAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 100 KL capacity RCC ESR with 12Mtr. Staging, 150 KL capacity RCC ESR with 12Mtr. Staging,Providing 100% functional house tape connections etc With 5 years operation & maintenance .in connection with to PWS to village Lathi under Kukudakhandi Block. | |||||||
| 1.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 1,93,88,242 ₹1,93,88,242 Lowest | 2,14,29,110 ₹2,14,29,110 | 1,93,88,243 ₹1,93,88,243 | 2,34,69,978 ₹2,34,69,978 |
| 1.02 | Construction of 100 ,000 LTR OHR WITH 12M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 100,000 ltrs capacity with necessary staging height of 12 mtr consisting of minimum 6 nos RCC columns and cylinderical container with circular dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 100 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/Paralamaharaja Engineering College,Berhampur at his own cost) | 1 | Nos | 23,31,851 ₹23,31,851 Lowest | 25,77,309 ₹25,77,309 | 23,31,851 ₹23,31,851 Lowest | 28,22,767 ₹28,22,767 |
| 1.03 | ELEVATED STORAGE RESERVOIR (150 KL capacity R C C elevated storage reservoir 12 m Staging )
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 150 KL capacity with necessary staging height of 12 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /PMEC,Berhampur at his own cost). | 1 | Nos | 32,12,846 ₹32,12,846 Lowest | 35,51,041 ₹35,51,041 | 32,12,847 ₹32,12,847 | 38,89,236 ₹38,89,236 |
| 1.04 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned. | 1 | Nos | 12,46,647 ₹12,46,647 Lowest | 13,77,873 ₹13,77,873 | 12,46,647 ₹12,46,647 Lowest | 15,09,099 ₹15,09,099 |
| 2.00Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 20 KL capacity RCC ESR with 10Mtr. Staging,Providing 100% functional house tape connections etc. With 5 years operation & maintenance in connection with to PWS to village of K.Nuapada under Kukudakhandi Block. | |||||||
| 2.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 22,21,073 ₹22,21,073 Lowest | 24,54,871 ₹24,54,871 | 22,21,073 ₹22,21,073 Lowest | 26,88,668 ₹26,88,668 |
| 2.02 | Construction of 20000 LTR OHR WITH 10M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrs capacity with necessary staging height of 10 mtr consisting of minimum 4 nos RCC columns and square dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 65mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 8,84,631 ₹8,84,631 | 9,77,751 ₹9,77,751 | 8,84,630 ₹8,84,630 Lowest | 10,70,870 ₹10,70,870 |
| 2.03 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned . | 1 | Nos | 1,55,285 ₹1,55,285 Lowest | 1,71,631 ₹1,71,631 | 1,55,285 ₹1,55,285 Lowest | 1,87,977 ₹1,87,977 |
| 3.00Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 20 KL capacity RCC ESR with 10Mtr. Staging,Providing 100% functional house tape connections etc. With 5 years operation & maintenance in connection with to PWS to village of Kumbhajhari under Kukudakhandi Block. | |||||||
Tender Value
₹4.0 Cr
Closing Date
17 Jan 2022, 5:00 pmClosed
Superintending Engineer, RWSS
Near Jarada Bunglow,Berhampur-760004
PWS to (1) Lathi (2) K. Nuapada (3) Kumbhajhari (4)Birakrushnachandrapur under Kukudakhandi Block
2021_RWSS_75006_12
EERWSSBAM- 29 (A) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
360 days
PWS to (1) Lathi (2) K. Nuapada (3) Kumbhajhari
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
15 Mar 2022
28 Dec 2021
18 Jan 2022
28 Dec 2021
17 Jan 2022
28 Dec 2021
28 Dec 2021 - 12 Jan 2022
Amount
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 100 KL capacity RCC ESR with 12Mtr. Staging, 150 KL capacity RCC ESR with 12Mtr. Staging,Providing 100% functional house tape connections etc With 5 years operation & maintenance .in connection with to PWS to village Lathi under Kukudakhandi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 100 ,000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 100,000 ltrs capacity with necessary staging height of 12 mtr consisting of minimum 6 nos RCC columns and cylinderical container with circular dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 100 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/Paralamaharaja Engineering College,Berhampur at his own cost)
ELEVATED STORAGE RESERVOIR (150 KL capacity R C C elevated storage reservoir 12 m Staging ) Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 150 KL capacity with necessary staging height of 12 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /PMEC,Berhampur at his own cost).
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 20 KL capacity RCC ESR with 10Mtr. Staging,Providing 100% functional house tape connections etc. With 5 years operation & maintenance in connection with to PWS to village of K.Nuapada under Kukudakhandi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 20000 LTR OHR WITH 10M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrs capacity with necessary staging height of 10 mtr consisting of minimum 4 nos RCC columns and square dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 65mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned .
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 20 KL capacity RCC ESR with 10Mtr. Staging,Providing 100% functional house tape connections etc. With 5 years operation & maintenance in connection with to PWS to village of Kumbhajhari under Kukudakhandi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 20000 LTR OHR WITH 10M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrs capacity with necessary staging height of 10 mtr consisting of minimum 4 nos RCC columns and square dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 65mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned .
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, Stand post,Recharge pit,bore well platform,pump house,Compound wall, Pummping unit instalation, 20 KL capacity RCC ESR with 10Mtr. Staging,Providing 100% functional house tape connections etc. With 5 years operation & maintenance in connection with to PWS to village of Birakrushnachandrapur under Kukudakhandi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,individual house hold connection, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 20000 LTR OHR WITH 10M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrs capacity with necessary staging height of 10 mtr consisting of minimum 4 nos RCC columns and square dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 65mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Akash Dalai
Surya Narayan Patnaik
KESHAB PRADHAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
BOQ_388930.xls
BOQ • 0.29 MB
12.pdf
Tender Documents • 2.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .