Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance 431 9 INDIRA UDHYAN MARG VIKASNAGAR DEHRADUN | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹2.2 L (0.84%)Admitted-Finance | ₹2.6 Cr+₹2.2 L (0.84%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical N K TOWER NEAR KARGICHOWK DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder did not submitted required documents. |
| 4 | Not Admitted-Fee/PreQual/Technical 5 A WEST REST CAMP DEHRADUN | - | - | Not Admitted-Fee/PreQual/Technical Others-Bidder did not submitted required documents. |
| Sl No | Description | Qty | Unit | Shri Ram Construction L2 | AA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | |||||
| 1.01 | Kalsi Block | 109.04 | Cum. | 2,330 ₹2,54,063.2 | 2,311.95 ₹2,52,095.03 Lowest |
| 1.02 | Chakrata Block | 181.42 | Cum. | 2,330 ₹4,22,708.6 | 2,313.33 ₹4,19,684.33 Lowest |
| 2.00Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | |||||
| 2.01 | Kalsi Block | 42,450 | sqm | 14 ₹5,94,300 | 13.96 ₹5,92,602 Lowest |
| 2.02 | Chakrata Block | 35,557.5 | sqm | 14.2 ₹5,04,916.5 | 14.16 ₹5,03,494.2 Lowest |
| 3.00Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10 | |||||
| 3.01 | Kalsi Block | 91.89 | Cum | 8,425 ₹7,74,173.25 | 8,340.95 ₹7,66,449.9 Lowest |
| 3.02 | Chakrata Block | 83.87 | Cum | 9,900 ₹8,30,313 | 9,808.52 ₹8,22,640.57 Lowest |
| 4.00Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix) | |||||
Tender Value
₹3.1 Cr
EMD Value
₹6.6 L
Closing Date
2 Mar 2024, 3:00 pmClosed
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Dehradun
Under annual repair for the year 2024-25, Renewal work through SDBC on Km 12, 13, 14, 15, 35, 36, 38, 43, 44, 45, 47, 49, 53, 59, 60, 62, 64 of Haripur-Ichchadi-Kwanu-Meenas Motor Road (S.H.- 21) in Chakrata Constituency in Distt. Dehradun.
2024_pwd_69629_1
935/1C-9/2024, Dated 12.02.2024
Open Tender
Civil Works - Roads
Item Rate
270 days
Chakrata constituency
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer, Temp. Div., PWD, Sahiya
₹6.6 L
Superintending Engineer, 9th Circle, PWD, Dehradun
14 Mar 2024
15 Feb 2024
2 Mar 2024
15 Feb 2024
2 Mar 2024
22 Feb 2024
21 Feb 2024
Amount
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Kalsi Block
Chakrata Block
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Kalsi Block
Chakrata Block
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10
Kalsi Block
Chakrata Block
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix)
Kalsi Block
Chakrata Block
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Kalsi Block
Chakrata Block
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Kalsi Block
Chakrata Block
Cleaning of fully choked scupper and catchpit complete as directed by the Engineer in-charge.
Kalsi Block
Chakrata Block
Maintenance of Earthen Shoulder
Kalsi Block
Chakrata Block
Shri Ram Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.68 MB
SBD.pdf
Tender Documents • 0.98 MB
BOQ_83673.xls
BOQ • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .