| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC Being L1 and reasonable |
| 2 | L2₹2.6 Cr+₹3.7 L (1.44%)Rejected-Finance | ₹2.6 Cr+₹3.7 L (1.44%) | L2 | Rejected-Finance Being other than L1 |
| 3 | L3₹2.8 Cr+₹30.8 L (12.1%)Rejected-Finance | ₹2.8 Cr+₹30.8 L (12.1%) | L3 | Rejected-Finance Being other than L1 |
| 4 | L4₹3.2 Cr+₹62.2 L (24.5%)Rejected-Finance 20 SC BOSE COLONY GALL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹3.2 Cr+₹62.2 L (24.5%) | L4 | Rejected-Finance Being other than L1 |
| 5 | L5₹3.2 Cr+₹70.9 L (27.9%)Rejected-Finance | ₹3.2 Cr+₹70.9 L (27.9%) | L5 | Rejected-Finance Being other than L1 |
Tender Value
₹2.6 Cr
EMD Value
₹3.4 L
Closing Date
13 Jan 2021, 6:00 pmClosed
Chief Engineer Bareilly Zone
Headquarters Chief Engineer Bareilly Zone Military Engineer Services Sarvatra Bhawan Station Road Bareilly Cantt Bareilly 243 001
PROVISION OF 0.5 MW ROOF TOP BASED SOLAR POWER SYSTEM AT BAREILLY
2020_MES_402112_1
CEBZ/BLY/T-11 OF 2020-21
Open Tender
Power/Energy Projects/Products
Item Rate
180 days
Bareilly
As per NIT
8 documents required · 8 mandatory
₹2,000
GE (P) Bareilly
₹3.4 L
Yes
25 Feb 2021
10 Dec 2020
18 Jan 2021
10 Dec 2020
13 Jan 2021
31 Dec 2020
11 Dec 2020 - 30 Dec 2020
Amount
SCHEDULE 'A' PART-I (SOLAR POWER PLANT)
SCOPE OF WORK INCLUDES ALL BELOW MENTIONED ITEMS AS WELL AS OTHER ITEMS REQUIRED FOR SUCCESSFUL COMMISSIONING TESTING AND SMOOTH OPERATION OF SOLAR PV PLANT CAPACITY 0.5 MW AT BAREILLY. Supply, installing, testing and commissioning of grid connected Solar PV plant of 500 KW AC side with 600 KWp DC side capacity including ballasted type module mounting structure, solar grade DC copper cable upto inverter, array junction boxes, MC connectors, AC combination boxes, AC distribution board , junction / combiner boxes (including the module junction box, string junction box and main junction box equipped with appropriate functioning safety including fuses,SPD , grounding etc.) pump/motor with necessary piping system, valves, foundation/staging work, as conditions for Solar Panel comprising of following sub components/sub systems and installation accessories complete including having following features complete all as specified and as directed in the technical specification of tender document and meeting the specifications as given subsequently in Particular Specification & as directed in scope of work and technical specification. Note- Items from 2.001 to 2.134 shall be considered as one item of Solar PV plant and cost of these items are deemed to be included in Item No.- 2.000.
Solar PV Module
Solar modules not less than 330 watts each as per detail technical specification mention in Particular specification of tender document.
Modules should have efficiency of not less than 16% and the fill factor should be above 75% with cell and module both manufactured in INDIA. Make : Waaree / Vikram/Jackson/Emvee/Adani Solar/ Tata Power Solars Ltd/ Neosol/ Satvik Green / Rhaine Solar (DCR Modules)
Voltage at Pmax - 37.25 V minimum for 72 Cells
Current at Pmax - minimum 8.86A for 72 cells
Open circuit voltage - 45.94 V minimum for 72 Cells
Short circuit current - minimum 9.41 Amps
Maximum system voltage (Volts) - 1000 V DC
Type of solar PV cell - Multi crystalline sillicon
Suitability - For grid connected system
Module output - MC electronics plug (Male and female)
Certification - The PV modules must conform to the latest edition of any of the following IEC/equivalent BIS Standards for PV module design qualification and type, approved as per IEC61215/BIS14286
In addition, the modules must conform to IEC 61730 Part 1(A1+A2+A11)-requirements for construction & Part 2(+A1)-requirements for testing, for safety qualification
The modules must conform to IEC 61701 , IEC 62716 ,62804 PID resistant
Latest STC report should be provided from any MNRE authorized test lab , report should not be 3 months old from the date of tender
Application Class - A
Safety Class - A
Fire rating Class - C
All above electrical parameter measured - Standard test condition of irradiance of 1000 W/m², AM 1.5 and cell temperature of 25° C
Supply and installation of modules and installation is to be done as per the approved design. PV Modules of different models, capacity, make, batch shall not be used in the work.
Solar module shall be inspected and tested at a factory in India in the presence of an officer detailed by the Accepting Officer before despatch to the execution site.
Material Warranty:(i) The contractor should warrant the Solar Module(s) to be free from the defects and / or failures specified below for a period not less than 10 (ten) years from the date of completion of work. He will obtain similar warranty from the original manufacturer and will submit the same to the GE (projects) Bareilly. However contractor will be responsible for the enforcement of warranty which shall include (a) Defects and / or failures due to manufacturing (b) Defects and / or failures due to quality of materials (c) Non conformity to specifications due to faulty manufacturing and / or inspection processes.
Performance Warranty: PV modules must be warranted by the contractor for output peak wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. He will obtain similar warranty from the original manufacturer and will submit the same to the department. However contractor will be responsible for the enforcement of warranty. If Module(s) fail(s) to exhibit such power output in prescribed time span, the contractor / manufacturer will be bound to either deliver additional PV Module(s) to replace the missing power output with no change in area of site used or replace the PV Module(s) without any extra cost at the sole discretion of GE (project) Bareilly. An amount as detailed in Sch 'A' Notes here-in-before shall be held against as security deposit..
Module Mounting Structure
Supply and Installation and comissioning of Ballast type solar module mounting structure as per designed and detail specified in the particular specification for the Different Roof Top . Make : Jackson/Ganges International
Material : Mild steel structure, Hot Dip Galvanised of 80 micron thick, corrosion resistant and electrolytically compatible with material used in modular frame. Galvanization shall conform to IS-2629, 4759 & 4736 as applicable.The fasteners shall be stainless steel to fix with the modules and with pre fabricated PCC Bricks. The contractor shall submit the design, length, section, detailed layout etc. of the structure.
Minimum Module ground clearance should be 300 mm.
The structure should be capable of withstanding a wind load of 180 km/hr after installation of pre fabricated PCC blocks size of 400 X 150 X 150 mm
PCC blocks should comply with IS 2185-1 (2005)
The tilt angle is kept at 12 degree , module orientation is landscape type. IS 875: Part 3 - 2015 for the design loads for Buildings and structures- Wind Loads
The array structure shall be grounded properly using maintenance free earthing kit
All fasteners are to be used of SS304. Roof protection rubber pad are used that made of 100% STYRENE BUTADIENE (SBR) Rubber crub of specific gravity of 1.047, thickness of 1/2''density of 0.04 lb/cum as per standard with testing standards as per tensile testing- ASTM D412-92, Accelerator Weathering test- ASTM D-4587, UV Exposure and Tensile Porperties- ASTM D624-91 and ISO 2322:2014(EN), it is made up of recycled material with self ignite temp of>440 degree Celsius, melting point>200 degree celsius.
The mounting structures of solar PV modules, electrical works and overall workmanship of the grid solar power plant up to inverter must be warranted for a period minimum 05 (Five) years as detailed in Particular Specifications. If any of the item fails to conform to this warranty, the contractor/ manufacturer will repair or replace the items at their own expenses. Design structural drawings of module mounting structure alongwith design calculations shall be submited by the contractor duly vetted from NIT / IIT / Govt Research Institute. The cost of same shall be deemed to be included in this item.
Power Conditioning Unit (On grid Inverters)
Supply and Installation and comissioning of Solar Grid Connected inverter of capacity 500 KW, 3 phase, 440 Volt, AC operated, 50 Hz, outdoor type with following features complete all as per technical specifications given in Particular Specification and directed. Make : Delta/ABB/SMA/Polycab/Huawei/Solis/ Sungrow.
The Power Grid should have the following salient features:-
The PCU / inverters should be tested from the MNRE approved test centres / NABL / BIS / IEC accredited testing-calibration laboratories. Test certificates for PCU / Inverters shall be submitted to the Engineer-in-Charge.
The charge controller (if any) / MPPT units environmental testing should qualify IEC 60068-2 (1, 2, 14, 30) / Equivalent BIS standard. The junction boxes / enclosures should be IP 65 (for out door) / IP 54 (indoor) and as per IEC 529 specifications.
Built-in meter and data logger to monitor plant performance through external computer shall be provided.
The power conditioning units / inverters should comply with applicable IEC / equivalent BIS standard for efficiency measurements and environmental tests as per standard codes IEC 61683 / IS 61683 and IEC 60068-2 (1,2,14,30) / Equivalent BIS Standard
Economical requirements:-
(i) Maximum efficiency >98%.
(ii) Opti trace MPP tracking for best MPP tracking efficiency.
(iii) Active temperature management with Opti cool.
(iv) Bluetooth communication.
Simple requirements:-
(i) Three Phase Grid feed-in.
(ii) Cable connection without tools.
(iii) DC plug-in system.
30 KW INVERTER (1 No.):-
(1) Input (DC)
(i) Maximum input DC power - 39 KWp
(ii) Maximum Input voltage - 1100V
(iii) Operating voltage range - 200 V - 1000 V
(v) Max. input current - 28 A/28 A / 28 A
(vi) Connection type -6 Pairs MC4
(vii)Start up Voltage - 180 Volts
(2) Output (AC)
(i) Max. Output power - 33 KW
(ii) Nominal power -30 kW
(iii) Nominal output Current - 50.2 A
(iv) Nominal output Voltage - 400V
(v) Operating voltage range - ± 20%
(vi) Power factor (Adjustable) - 0.8 ind - 0.8 Cap
(vii) Output frequency- 50 HZ ± 5 HZ
(viii) Harmonic distortion, current < 3 %
40 KW INVERTER (08 Nos.):-
(1) Input (DC)
(i) Maximum input DC power - 52 KWp
(ii) Maximum Input voltage - 1100V
(iii) Operating voltage range - 200 V - 1000 V
(v) Max. input current - 26 A/26 A / 26 A/26 A
(vi) Connection type -8 Pairs MC4
(vii)Start up Voltage - 180 Volts
(2) Output (AC)
(i) Max. Output power - 40 KW
(ii) Nominal power -44 kW
(iii) Nominal output Current - 48.1 A
(iv) Nominal output Voltage - 400V
(v) Operating voltage range - ± 20%
(vi) Power factor (Adjustable) - 0.8 ind - 0.8 Cap
(vii) Output frequency- 50 HZ ± 5 HZ
(viii) Harmonic distortion, current < 3 %
50 KW INVERTER (3 Nos.):-
(1) Input (DC)
(i) Maximum input DC power - 65 KWp
(ii) Maximum Input voltage - 1100V
(iii) Operating voltage range - 200 V - 1000 V
(v) Max. input current - 26 A/26 A / 26 A/26 A
(vi) Connection type -8 Pairs MC4
(vii)Start up Voltage - 180 Volts
(2) Output (AC)
(i) Max. Output power - 55 KW
(ii) Nominal power -50 kW
(iii) Nominal output Current - 60.1 A
(iv) Nominal output Voltage - 400V
(v) Operating voltage range - ± 20%
(vi) Power factor (Adjustable) - 0.8 ind - 0.8 Cap
(vii) Output frequency- 50 HZ ± 5 HZ
(viii) Harmonic distortion, current < 3 %
(3) Efficiency:-
(i) Peak Efficiency - 98.50%,
(ii) Euro Efficiency - 98.40 %,
(4) Environmental limits
(i) Degree of protection - IP65
(ii) Operating temperature - -20⁰ C to +50⁰ C
(iii) Maximum altitude (above sea level) - < 4000m
(iv) User interface and communications- LCD Display
(v) Communication Port: RS 485
(vi) DC switch - DC relays
(5) Protection & Monitoring:-
(i) Ground fault monitoring
(ii) Anti islanding
(iii) Grid monitoring
(iv) DC reverse polarity
(v) AC and DC short circuit and over current
(vi) Over current/ over voltage and over temperature
SOLAR DC CABLES
Supply laying and testing Solar DC copper cables multi stranded conductor, XLPE or XLPO insulted, IR/UV protected conforming to TUV 2 PfG 1169/08.2007 as per the technical specification mentioned in Particular Specifications of size not less than 4 sqmm and maximum voltage drop shall be limited to 2%. The solar cable shall be laid for interconnecttion of PV modules, PV modules to DC DB and DC DB to inverter. Make : Polycab/ KEI/ Apar Cables/ Seichem/ Leoni Cables
Shall meet IEC 60227/IS 694, IEC60502/IS 1554 standard Temp range: -10˚C to +80˚C Voltage rating 660/1000V
Solar cable shall be as per specification TUV 2 PfG 1169/08.2007
Cable installation shall be as per IS 1255
All cables and conduit pipes shall be clamped to the rooftop, walls and ceilings with thermoplastic clamps at intervals not exceeding 50 cm. The DC cable size shall be minimum of 4.0 sqmm copper,Solar cable shall be aesthetically tied to Module Mounting Stucture using UV resistant cable ties suitable for out door application.
DC DISTRIBUTION BOARD
Supply and installation of DCDBs for 600 KWp plant as per the specification mention in particular specifications.
The DC distribution box shall be of the thermos-Plastic with UL 94 for fire safety and SS fasteners IP65 DIN-rail mounting type.
DC surge protection devise (SPD), class 2 as per IEC 60364-5-53
The fuses IEC/ equivalent BIS standard should comply with applicable IEC/ equivalent BIS standard for general safety requirements for connectors, switches, circuit breakers, low-voltage switch gear as per standard codes IS/IEC 60947 (Part 1, 2 & 3), EN 50521 .
Number of DC SPD with specification : 1000 VDC , Up :1.9kv , Imax :40 KA , Ucpv : 585 V DC , Iscpv : 2000 A in DCDB should be EQUIVALENT TO No. of MPPTs in Inverter, number of I/P and O/P in DCDB should be equal to number of string inputs in the inverter
Each string should have DC fuse with specification , I - 15 Amp , 1000 Vdc with DC fuse Holder as per specification 1000 V , 30 A ,100 KA SCCR as per IEC 60269-2-1,60947-3 , IP 20 on its positive side
DCDB with 12 IN 12 OUT - 3 Nos.
DCDB with 08 IN 08 OUT - 8 Nos.
DCDB with 06 IN 06 OUT - 1 No. Note : The number of inputs and outputs in DC DB should be equal to No. of string inputs in Inverter.
Supply and installation and testing of ACDBs for 500 KW roof top solar power plant as per the specification mention in particular specifications including following components:: (i) AC circuit breaker, 4-pole AC surge protection devise (SPD), class2 as per IEC 60364-5-53 ,AC SPD with specification for 3 phase and 1 neutral ,Uc :335V Ac , Up : 1.5 KV , In : 20 KA , Imax : 40 KA (ii) Each ACDB should be having MFM with Accuracy class 0.5 , panel meter compatible with RS 485 port communication compatible with remote monitoring system . (iii) The panel shall be duly wired with suitable size of 1.1kV, PVC insulated cable and terminals shall be brought out for cable connections. 10% spare terminals subjected to minimum one of each rating shall be provided on each distribution switchgear. (iv) 240 V, 15 A, 3 pin industrial socket-outlet with ON/OFF switch shall be provided in each panel (v)The fuses (AC/DC) should comply with applicable IEC/ equivalent BIS standard for general safety requirements for connectors, switches, circuit breakers, low-voltage switch gear as per standard codes IS/IEC 60947(Part 1, 2 & 3), EN 50521 ,IEC 61439-1 IEC 61439 -2 (vi) IEC 62052-11 for Electricity metering equipment (A.C.) - General requirements, tests and test conditions - Part 11: Metering equipment.
ACDB 1 IN with 1 Out with SPD, MFM , Indiactors,Circuit Breaker ,15 Amp socket ,IP65 ( suitable for 50 KW AC output) MCCB 4 Pole 125 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 1 No.
ACDB 1 IN with 1 OUT with SPD, MFM , Indiactors,Circuit Breaker ,15 Amp socket ,IP65 ( suitable for 40 KW AC output) MCCB 4 Pole 100 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 1 No.
ACDB 1 IN with 1 OUT with SPD, MFM , Indiactors,Circuit Breaker ,15 Amp socket ,IP65 ( suitable for 30 KW AC output ) MCCB 4 Pole 80 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 1 No.
ACDB 2 IN with 1 OUT with SPD, MFM , Indiactors,Circuit Breaker ,15 Amp socket ,IP65 ( 80 KW AC output ) MCCB 4 Pole 100 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 2 Nos. (1 No. each for individual inverter) MCCB 4 Pole 250 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 1 No.
ACDB 3 IN with 1 Out with SPD, MFM , Indiactors,Circuit Breaker ,15 Amp socket ,IP65 ( 120 KW AC output ) MCCB 4 Pole 100 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 3 Nos. (1 No. each for individual inverter) MCCB 4 Pole 300 Amp, 415 V, Breaking capacity -36 kA with extended rotary handle - 1 No.
Supply , installation of ESE type Lightning aresstor to protect the all the roof installed with solar modules with counter, mounting structure and Accessories. 5 mtr Height (As per NFC 17 102) suitable for 150 m protection radius as per details given in particular specifications all as specified and directed. Make: True Power/ Erico/ JMV/ Remedies.
Supply , installation of ESE type Lightning arrestor to protect the all the roof installed with solar modules with counter, mounting structure and Accessories. 5 mtr Height (As per NFC 17 102) suitable for 45 m protection radius as per details given in particular specifications all as specified and directed. Make: True Power/ Erico/ JMV/ Remedies.
Note : (i) Lightning protection should be provided as per IEC 6205 /IS 2309 standard. (ii) To reduce the over voltage to a safe level before it reaches the PV or other sub-system components as per NFC 17 - 102 (iii) Protection radius at level 3 - 45 meter (Qty-2 Nos.), Protection radius at level 3 - 150 meter (Qty-1 No.)
Supply and installation of maintenace free chemical earthing using electrode of size 50mm bore x 3 m long copper bonded and connected with 25 X 4 mm GI strip complete with excavation, earth work, cast iron cover with back fill compound (Chemical/ Back fill compound gel for earthing enhancement -50Kg) complete as specified in particular specifications and directed. (Mounting structure + DCDB : 8 Nos., Inverters : 8 Nos. and ACDB - 8 Nos.) Make : Erico/ Remedies Earthing System / True Power or equivalent Note: (i) IR Value should be less than 1. (ii)GI Strip of 25 x 4 mm upto 7.5m is deemed to be included in the unit rate quoted. (iii) The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious faults as guided by IEC 60364. (iv) On Grid Inverter , ACDB, DCDB , Structure, Lightning arrestor should be earth separately with size of 25 mm x 4 mm GI strip. (v) The earthing system shall be designed, in accordance with IS: 3043-1987 and IEEE 80, Indian Electricity Rules, Codes of practice and regulations
M&L for earth continuity conductor or main GI earthing strip 25x4 mm fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required galvanised complete all as specified and directed.
Supply and installation of bi-directional MFM meter with Remote monitoring through RS 485 port to be installed at 11 KV incoming line with appropriate CT , high accuracy: Class 0.5s and standard specifications as per IS13779, IS14697, IEC62052-11, IEC62053-( 21,22,23 ) and I P 54 protection complete all as specified and directed. Make: Secure/ L&T/Genus/ HPL.
Supply and Installation of data monitoring system capable of communicating with all string invertors with string level monitoring, ACDB , LT & HT 11KV line energy meters, inverter alarm , weather station with server which should be a PCU with latest chip set technology (Telemetering unit interface scope) via GPRS / GSM /Suitable MODEM etc and provide information data logs of the entire solar PV grid connect power plants for the local monitoring at plant control room at site as well as remote monitoring via internet with suitable protection as per IEC standards.The string level monitoring compatible and shall have features of remote access (Control through WEB/ Apps based control through mobile/ PC) to the real time data and combination of wired / wireless technology as per design by the OEM and also supply and fixing of monitoring system with local as well as web operating provisions for monitoring the generation and plant running parameters remotely complete all as specified and as directed in particular specifications.
Supply, Installation, Testing and Commissioning of Wireless Weather Station for highly accurate and reliable communication over GPS battery charging from Solar Panel, offline Data storage in Micro SD card, Real time data access on web and mobile with world class sensors to measure wind speed, wind direction, Solar radiation, Air Temperature, Humidity, Atmospheric pressure, global horizontal and back ground irradiance including surface mounted thermistor to measure solar panel temperature complete all as specified and directed comprising of following. Note : The equipment can be powered from an AC source 100 to 240 Volts AC, 50 Hz or solar panel. Make : Webdyn India Pvt. Ltd. /Trackso /Advance Tech India Pvt. Ltd./ MB control System Pvt Ltd.
(a) K&Z CMP - 3 Pyronometers with 15Ft cable and prewired connectors - 2 Set.
(b) 034B wind speed and wind direction sensor with a 15Ft cable and prewired connectore - 01 Set.
(c) 083E -1-85 Relative Humidity and Ambient Air Temperature Probe with a 15Ft cable and prewired connector - 01 Set.
(d) 5980 Naturally Aspirated Radiation Sheild - 01 Set.
(e) Surface mounted thermistor to measure Solar Panel Temperature - 01 Set.
(f) Met-One Data logger or 131P Signal Translator in NEMA 4X with 12V DC supply - 01 Set.
(g) 905 Tripod (Expandable from 6ft to 10ft) Supplied with Lighting Rod and Guy Wires - 01 Set.
(h) 191 - 6 crossarm (36IN) with Mounting Accessories for Wind Sensor and Pyronometers - 01 Set.
(j) 092 Barometer (600 to 1100hPa) with 5 Ft cable - 01 Set.
(k) 370 Rain Gauge (8-IN Diameter, 0.01IN Calibration - 01 Set.
(l) MX - 136 Battery Backup 36 AH battery - 01 Set.
(m) MX 120/140 Remote Solar Power System 20/40 Watt Solar Panel - 01 Set.
(n) 500038 Ethernet Interface & Compact Flash Module for 455B Datalogger - 01 Set.
(o) MX 991 Spread Spectrum Radio Kit 900 MHz - 01 Set.
(p) MX 991 Cellulor Digital Modem Kit for GPRS - 01 Set.
(q) Air Plus Datalogger support software - 01 Job
(r) 550117 Logger Net Datalogger support software - 01 Job
(s) 550311 Visual Weather Station Software - 01 Job
Supply, laying and testing XLPE insulated, PVC sheathed single or multi-core flexible copper conductor cables with UV-stabilized outer sheath , 650/100 volts conforming to IS 7098 part - 1/1988 of following sizes :
4 core 16 sqmm (Inverter to ACDB for 30 KW inveter)
4 core 25 sq mm (Inverter to ACDB for 40 KW inveter)
4 core 35 sq mm (Inverter to ACDB for 50 KW inveter)
Notes : (i) All cable / wires are to be routed in a GI cable tray and suitably tagged and marked with proper manner by good quality ferule or by other means so that the cable easily identified. Solar cables shall be aesthetically tied to Module Mounting Structure using UV resistant cable-ties suitable for outdoor application. (ii) The total voltage drops on the cable segments from the solar grid inverter to the building distribution board shall not exceed 3.0%
Supply, laying and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 3.5 core 50 sq. mm (from 30 KW ACDB to LT panel) fixing with suitable clamps on floors/ walls/ roof top all as specified and directed.
Supply, laying and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 3.5 core 70 sq. mm (from 40 KW ACDB to LT panel) fixing with suitable clamps on floors/ walls/ roof top all as specified and directed.
Supply, laying and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 3.5 core 95 sq. mm (from 50 KW ACDB to LT panel) fixing with suitable clamps on floors/ walls/ roof top all as specified and directed.
Supply, laying and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 3.5 core 120 sq. mm (from 80 KW ACDB to LT panel) fixing with suitable clamps on floors/ walls/ roof top all as specified and directed.
Supply, laying and testing XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 3.5 core 185 sq. mm (from 120 KW ACDB to LT panel) fixing with suitable clamps on floors/ walls/ roof top all as specified and directed.
Supply and Installation of CPVC pipe as per IS 15778 ,ASTM D1784 , ASTM D2846 specification and standards with water outlet at every 5 meter of Solar module cleaning system , CPVC pipe with 50 mm dia water piping laid through out the solar module array installation with 40 mm outlet fitted with long handle ball valve, one UNION at every 20 running meter to be fitted for easy service and installation complete all as specified and directed. Note : Cleaning of solar panels is required twice a week.
Supply and installation of GI 'U' shaped trench 100 x 100 mm made out of GI sheet 1.2 mm thick below the module array to collect the waste water after the cleaning that will run through out modules complete all as specified and directed.
Supply and Installation of Computer system with 24 inches LCD monitor 16GB RAM Minimum 4TB HDD with I7 processor Intel dual quad core key board laser printer and mouse, 1 KVA UPS complete with licensed software (Server configuration) of Make: HCL/DELL/Acer complete all as specified and as directed.
Supply and Installation of ABC STORED PRESSURE TYPE FIRE EXTINGUISHERS each of capacity 4 kg as per IS 15683 , Range of jet 4 mtrs maximum period for which jet maintended 16 sec , working pressure -15 kgf/cm² , hydro pressure - 35 kgf/cm² , Bursting pressure -55 kgf/cm² , Fire Rating - 2A,34B , full weight - 6.75 kg.
SCHEDULE 'A' PART-II (Maintenance and Operation)
Operation and Maintenance for FIRST year of roof top SPV Plant of capacity 500 KW on turnkey basis by deplyoing one ITI Qualified supervisor and providing all services inclusive of washing & cleaning of solar Panels / other eqpts and other maintenance schedules as per OEM of daily, monthly, half-yearly and yearly basis including Sunday and holidays for which scope is as under.
(i) Repair/replacement of solar modules, mechanical structure of solar module, electrical work and overall workmanship of grid solar power plant upto inverter is already covered under material and performance warranty of Phase-I. (ii) The thermal imaging of PV Panels should be taken once a year for checking its health including hot spots. (iii)The shut down duration of Inverter should be monitored and recorded and analyzed.
(iv) Maintaining the visit and event logbook. A note of any event that has occurred due to which the Solar system has underperformed or had stopped shall be made in the log book. The corrective action taken and equipment or parts replaced as authorised by MES shall also be noted in the event book.
(v) Solar Panel Maintenance The Solar array (a number of solar panels connected together) is often thought to be maintenance free. However, occasional maintenance i.e once in fortnight and inspection of the solar array must be performed to ensure the optimal use of the solar panels. This can be done by keeping the surface (glass) area of the module clean from any excess dirt. Each panel shall be washed, cleaned with water and sponge properly fortnightly. If the module has thick dirt or grime and bird droppings, which are harder to remove with plain water and sponge then washing soap / other chemical as per OEM guidelines shall be used. However cost of sponge / clothes , Detergents / Soap / Chemical is deemed to be included in the quoted rate for this item.
(vi) Notes 1. Metal brush will not be used to clean solar panel surface. 2. A visual inspection of the modules will also be done during cleaning to check for defects in the modules such as cracks, chips, de-lamination, fogged glazing, water leaks and discoloration. If any obvious defects are found, the location shall be noted in the system logbook, so that they can be monitored in the future in case further deterioration affects the modules' output. 3. The condition of the array mounting frame will also be checked by supervisor cum tradesman. Items to observe shall include the array mounting bolts (e.g.bolt rusting) and ensure that the frame and modules are firmly secured. The junction boxes shall also be checked to ensure that the wires are not chewed by rodents or insects.
(vii) Wiring and connections Wiring installations shall be checked for any cracks, breaks or deterioration in the insulation/conduits. Inspect panel boxes to ensure that they have not become a home for rodents and insects. Also inspect connections for any corrosion and/or burning. Switches should not spark when turned on or off. The following sections of conduit and wiring should be checked for any signs of damage:- Solar panels to the DCDB, DCDB to the Inverter, Inverter to the ACDB, If any damage is found, the same shall be repaired/replaced . All ground wires shall be checked to ensure that they are not broken.
All as per BOQ serial item No 21.000 to 21.050 as mentioned here in before but for SECOND YEAR.
All as per BOQ serial item No 21.000 to 21.050 as mentioned here in before but for Operation and comprehensive Maintenance forTHIRD YEAR.
All as per BOQ serial item No 21.000 to 21.050 as mentioned here in before but for Operation and comprehensive Maintenance for FOURTH YEAR.
All as per BOQ serial item No 21.000 to 21.050 as mentioned here in before but for Operation and comprehensive Maintenance for FIFTH YEAR.
RSG INFRASTRUCTURE
SVC PROJECTS PVT. LTD
M K ENGINEERS CO.
TRIVENI CONSTRUCTIONS
M/s godara infratech and power industries
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .