Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹7.6 L+₹1,555.27 (0.20%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | L3₹7.8 L+₹19,362.06 (2.54%)Rejected-AOC CHEMBAKERIL H CHALAKKA KUTHIYATHODE PO ALUVA | ERNAKULAM | KERALA | 683594 | L3 | Rejected-AOC third lowest | |
| 4 | L4₹7.9 L+₹24,434.55 (3.21%)Rejected-AOC | L4 | Rejected-AOC fourth lowest | |
| 5 | L5₹8.1 L+₹48,837.02 (6.41%)Rejected-AOC | L5 | Rejected-AOC fifth lowest |
| Sl No | Description | Qty | Unit | V O Jose L1 | ABOOBACKER K H L2 | HARSHAN.V. L5 | C.E.JAFFER L3 | KKM CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Kothakulam maintenance Ward 1 | ||||||||
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 20.8 | sqm | 347.25 ₹7,221.41 Lowest | 347.9 ₹7,234.93 | 369.48 ₹7,683.71 | 356.04 ₹7,404.21 | 358 ₹7,444.97 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 2.6 | cum | 9,438.5 ₹24,530.66 Lowest | 9,450 ₹24,560.55 | 10,035.66 ₹26,082.68 | 9,670.65 ₹25,134.02 | 9,733.57 ₹25,297.55 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 226.11 | kilogram | 101 ₹22,837.41 Lowest | 101.29 ₹22,902.99 | 107.57 ₹24,322.98 | 103.66 ₹23,438.87 | 104.33 ₹23,590.37 |
| 1.00 | 10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) | 693 | kg | 691 ₹4,78,863 Lowest | 691.76 ₹4,79,389.68 | 734.61 ₹5,09,084.73 | 707.89 ₹4,90,567.77 | 712.5 ₹4,93,762.5 |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 17.98 | cum | 817 ₹14,685.58 Lowest | 819.52 ₹14,730.87 | 870.28 ₹15,643.28 | 838.62 ₹15,074.19 | 844 ₹15,170.9 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 11.98 | cum | 7,138 ₹85,534.65 Lowest | 7,147.53 ₹85,648.85 | 7,590.19 ₹90,953.25 | 7,314.12 ₹87,645.1 | 7,362 ₹88,218.85 |
| 1.01 | 11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment | 119.83 | sqm | 1,040 ₹1,24,623.2 Lowest | 1,049 ₹1,25,701.67 | 1,114.07 ₹1,33,499.01 | 1,073.55 ₹1,28,643.5 | 1,080.5 ₹1,29,476.32 |
| 1.01 | OD110860/2025-2026:Engaging coolie | 3 | Day | 1,081 ₹3,243 | 974.88 ₹2,924.64 Lowest | 1,035.43 ₹3,106.29 | 997.77 ₹2,993.31 | 1,004 ₹3,012 |
Tender Value
₹8.5 L
EMD Value
₹21,174
Closing Date
16 Aug 2025, 4:00 pmClosed
AE
O/o The Assistant engineer, LIDEW Section, Kottuvally GP
Annual Plan-KTVLY GP 2025 -26 -Maintenance of Kothakulam pond ward 1-PROJECT NO. 28/26
2025_LSGD_782931_7
7/2025-26/AE/LIDEW/KTVLY
Open Tender
Civil Works - Others
Item Rate
180 days
KOTTUVALLY
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,870
Yes
₹21,174
Yes
27 Oct 2025
6 Aug 2025
18 Aug 2025
6 Aug 2025
16 Aug 2025
6 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1284988.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .