| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹3.5 LAccepted-AOC | ₹3.5 L Quoted ₹3.6 L | 2 | Accepted-AOC Lowest rate and hence the work will be awarded to the Contractor |
| 2 | 1₹3.5 LRejected-AOC | ₹3.5 L | 1 | Rejected-AOC Higher rate.Hence Rejected |
| 3 | 3₹3.6 LRejected-Finance | ₹3.6 L | 3 | Rejected-Finance Higher rate and hence not admitted |
| 4 | 4₹4.2 LRejected-Finance | ₹4.2 L | 4 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | TONY SKARIA L4 | T.U RAJU L3 | GITHIN N G L2 | MURALI T S L1 |
|---|---|---|---|---|---|---|---|
| 1.00Canal Improvement Works | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 62.4 | sqm | 19.52 ₹1,218.05 | 17.28 ₹1,078.27 | 18 ₹1,123.20 | 16.91 ₹1,055.18 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 11.96 | cum | 297 ₹3,552.12 | 244.75 ₹2,927.21 | 244 ₹2,918.24 | 239.59 ₹2,865.50 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.96 | cum | 9,500 ₹1.1 L | 7,536.25 ₹90,133.55 | 7,536 ₹90,130.56 | 7,377.58 ₹88,235.86 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 21.84 | cum | 10,000 ₹2.2 L | 7,946.34 ₹1.7 L | 7,945 ₹1.7 L | 7,779.05 ₹1.7 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 128.7 | sqm | 350 ₹45,045 | 366.85 ₹47,213.60 | 366.69 ₹47,193 | 359.12 ₹46,218.74 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.72 | cum | 10,500 ₹18,007.50 | 8,774.17 ₹15,047.70 | 8,773 ₹15,045.70 | 8,589.45 ₹14,730.91 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 75.4 | sqm | 250 ₹18,850 | 326.6 ₹24,625.64 | 326.6 ₹24,625.64 | 319.72 ₹24,106.89 |
| 1.01 | OD37256/2025-2026:Hire charges of Hitachi/other hydraulic machineries | 5.5 | hour | 1,100 ₹6,050 | 1,394.66 ₹7,670.63 | 1,200 ₹6,600 | 1,365.29 ₹7,509.10 |
Tender Value
₹3.8 L
EMD Value
₹9,533
Closing Date
14 Jan 2026, 1:00 pmClosed
Assistant executive engineer
Assistant executive engineer, Head works sub division peechi
Improvement works to Pattikkad Branch Canal Ch.2/500km-General Civil Work
2025_Irrig_824244_2
IRR/IA/TR/2490/2025_5_16_15/1
Open Tender
Civil Works - Canal
180 days
Thanippadam
Please refer Tender documents.
8 documents required · 8 mandatory
₹845
Yes
₹9,533
Yes
6 Feb 2026
7 Jan 2026
15 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
Amount
Canal Improvement Works
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD37256/2025-2026:Hire charges of Hitachi/other hydraulic machineries
GITHIN N G (BID ID -2456214)
T.U RAJU (BID ID -2457592)
TONY SKARIA (BID ID -2458064)
Bidder Name
TONY SKARIA
GITHIN N G
T.U RAJU
MURALI T S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1386023.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1386023.xls
BOQ • 0.30 MB
PreliminaryAgreement.pdf
Tender Documents • 0.42 MB
FormofTenderandaffi.pdf
Tender Documents • 0.03 MB
Integritypact.pdf
Tender Documents • 0.01 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Epaymentform.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid