Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 LAdmitted-Fee/PreQual/Technical/Finance | -32.51% | ₹13.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹13.2 LAdmitted-Fee/PreQual/Technical/Finance CHANDIPARA WARD NO 06 AMARPUR GOMATI DISTRICT TRIPURA | GOMATI | TRIPURA | 799013 | -32.51% | ₹13.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹13.2 L+₹2,153.33 (0.16%)Admitted-Fee/PreQual/Technical/Finance KUMARGAHAT UNAKOTI TRIPURA | KUMARGAHAT | UNAKOTI | TRIPURA | -32.40% | ₹13.2 L+₹2,153.33 (0.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹13.6 L+₹36,019.25 (2.73%)Admitted-Fee/PreQual/Technical/Finance JOYSHREE KANCHANPUR NORTH TRIPURA PIN 799270 | KANCHANPUR | NORTH TRIPURA | TRIPURA | 799270 | -30.67% | ₹13.6 L+₹36,019.25 (2.73%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹15.4 L+₹2.1 L (16.2%)Admitted-Fee/PreQual/Technical/Finance KANCHANPUR NORTH TRIPURA | NORTH TRIPURA | TRIPURA | 799250 | -21.55% | ₹15.4 L+₹2.1 L (16.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.6 L
EMD Value
₹39,151
Closing Date
17 Aug 2026, 3:00 pmClosed
The Executive Engineer,
DWS Division Kanchanpur
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc under DWS Sub Division Kanchanpur NH 44 to Jamarai para Dist North Tripura Package NO TR0307 P4 during the year 2026 27 GR I
2026_CEDWS_75568_1
22/EE/DWS/DIVN/KCP/2026-27
Open Tender
Civil Works - Water Works
Percentage
Kanchanpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹39,151
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing & fitting fixing of G.I. flange ( 10 mm wall thickness ) by welding with G.I. / MS pipe and placing position as per specification and the direction of the Engineer-in-charge. | |||||
| 1.01 | i) 100 mm dia | 26 | Nos | 495.3 | ₹12,877.8 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 139.36 | cum | 231.6 | ₹32,275.78 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
All kinds of soil | 112.5 | cum | 161.3 | ₹18,146.25 |
| 4 | Supplying and filling in plinth, under floor, foundations etc. With sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 14.15 | Cum | 1,177.3 | ₹16,658.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering –
All work upto plinth level:
i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size) | 14.15 | Cum | 9,938.6 | ₹1,40,631.19 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
All work upto plinth level:
i)1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 21.23 | Cum | 11,693.5 | ₹2,48,253.01 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
i)1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 19.66 | Cum | 12,925.6 | ₹2,54,117.3 |
| 8Centering shuttering including struttings, propping etc. and removal of form work for: | |||||
| 8.01 | i) Foundations, footings, bases for columns etc. for mass concrete with timber plank | 47.16 | Sqm | 333.9 | ₹15,746.72 |
stage.html
html • 0.03 MB
finance_76930.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.60 MB
DNIT22.pdf
Tender Documents • 3.81 MB
BOQ_76930.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .