Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.1 LRejected-AOC CHERKALA CHENGALA KASARGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | ₹6.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BM ABDHULLA L2 | majeed bendichal L1 |
|---|---|---|---|---|---|
| 1.00ROAD IMPROVEMENT | |||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements<br> Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 <br> (II) By Mechanical Means<br> (A) Bituminous Courses | 13.8 | cum | 578.6 ₹7,984.68 | 541.2 ₹7,468.56 |
| 1.00 | 3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 43.2 | cum | 59.8 ₹2,583.36 | 55.92 ₹2,415.74 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 94.95 | cum | 3,139.1 ₹3.0 L | 2,936.01 ₹2.8 L |
| 1.00 | 5.1.1a:Prime Coat :- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 978 | sqm | 66.5 ₹65,037 | 62.24 ₹60,870.72 |
| 1.00 | 5.2.3a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 978 | sqm | 13.5 ₹13,203 | 12.63 ₹12,352.14 |
| 1.01 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 978 | sqm | 228.6 ₹2.2 L | 211.97 ₹2.1 L |
Tender Value
₹6.3 L
EMD Value
₹15,842
Closing Date
4 Mar 2025, 1:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER,CHEMNAD GRAMA PANCHAYATH
Annual Plan-RENOVATION OF N H MOOLA ROAD -CHEMNAD GP-PR NO.82/24-25-General Civil Work
2025_LSGD_742306_1
06/2024-25/AE/LSGD/CHMD
Open Tender
Civil Works - Roads
180 days
CHEMNAD GRAMA PANCHAYATH
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,400
Yes
₹15,842
Yes
31 Mar 2026
24 Feb 2025
5 Mar 2025
24 Feb 2025
4 Mar 2025
24 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1195411.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.71 MB
BOQ_1195411.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid