Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
7 May 2026, 2:15 pmClosed
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
P2
3 conditions · 2 needing a document upload
Bulk Order:- (a) "Approved Vendors in RCF Vendor Directory for Set of Side Wall Assembly, Lavatory Side Wall and Roof for LHB Coaches and Under frame Complete for LHB coaches". (OR) (b) Bulk procurement will also be made from the firms who have supplied the tendered item OR similar item {Similar item means (Shell kit for any build) OR (Roof, Side Wall and Underframe for any build- all items individually meeting the quantity requirement stipulated below)} individually or as components of kits/assemblies, to ICF/RCF/MCF: 1.To the extent of 20% of the tendered quantity against a single regular purchase order during the last three previous financial years and the current financial year up to the date of opening of tender or minimum 50 coach sets in past, whichever is higher. (OR) 2. to the extent of 35% of the tendered quantity against multiple purchase orders (all types of orders) during the last three previous financial years and the current financial year up to the date of opening of tender or minimum 50 coach sets in past, whichever is higher. Document to be submitted for compliance of EC - Firm has to submit summary statement of past supply performance of same/ similar items { Similar means (Shell kit for any build) OR (Roof, Side Wall and Underframe for any build)} duly indicating PO details, item description, quantity supplied and date of supply duly enclosing the proof of supply to ICF/RCF/MCF in the form of PO copies along with inspection certificate/R.Notes. The responsibility to upload proof of supply rests solely and entirely with the tenderer. However, purchaser reserves the right to utilize the record of supplies made to ICF, if readily available
Developmental Order: - "Developmental Vendors in RCF Vendor Directory for Set of Side Wall Assembly, Lavatory Side Wall and Roof for LHB Coaches and Underframe Complete for LHB coaches". (OR) Other sources [Past suppliers of same/ similar items { Similar item means (Shell kit for any build) OR (Roof, Side Wall and Underframe for any build)} who are not eligible for Bulk order and new / untried sources] can be considered for placement developmental order for the quantity up to 20% of the NPQ. 1. Past suppliers who are not eligible for Bulk order can be considered for placement of developmental order provided they should submit along with their offer, PO copies along with receipt notes/ inspection certificate/ work completion certificate of same or similar item {Similar item means (Shell kit for any build) OR (Roof, Side Wall and Underframe for any build)} to ICF/RCF/MCF/Zonal Railways. The responsibility to upload proof of supply rests solely and entirely with the tenderer. However, purchaser reserves the right to utilize the record of supplies made to ICF, if readily available. 2. New /untried sources can be considered for Limited Quantity Developmental orders provided they should submit along with their offer details of available M&P along with clause wise compliance of STR No.ICF/MD/SPEC-147, Issue Status 01, Rev. No.02 dated 21.07.2006 with Amendment No.02 dated 02.08.2025, STR No.ICF/MD/SPEC-200, Issue Status 01, Revision No.04 dated 28.09.2017 with Amendment No.1 dated 05.05.2018, ICF/MD/SPEC- 315 Issue Status 01 Rev.00 dated 27.02.2017, Amendment No.01 dated 02.08.2025. Such tenderers are to note that non submission of such documents shall be taken as they are not having capacity/ capability of manufacturing tendered item, and their offer is liable to be rejected and no back reference in this regard will be made.
As per Public procurement (Preference to Make in India) order 2017, as amended, tendered item is to be procured from Class-I Local Suppliers only and the vendors who do not qualify to be Class-I Local Suppliers should not quote in the tender as their offers shall not be considered for any ordering.
57 conditions · 4 needing a document upload
In case of indigenous bidders, whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, have you indicated quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)?
Have you gone through the Eligibility Criteria and submitted all the documents mentioned therein?
Have you submitted the EMD or claimed exemption duly uploading documentary evidence in support of your claim along with Bid securing declaration as per clause 6.1 of section-I of Instructions to Tenderers of ICF Bid Document.
Have you confirmed for compliance of Public Procurement orders of Department of Expenditure regarding countries sharing land border with India?
Have you furnished the statement of Equipment & Quality Control?
Have you furnished tender specific letter of authority (if manufacturer has not quoted directly) to bid on behalf of manufacturer as per Annexure-II of ICF bid document.
Have you kept your offer valid for the validity period as mentioned in NIT header?
Have you submitted the details of location(s) at which local value addition is made/proposed?
Have you submitted self-declaration with respect to non-debarment under any provisions of DPIIT rules?
Have you submitted translated copy into English, for all documents in language other than English and all such documents should be signed by the authorised translator and notarized in India?
Have you submitted declaration for passing on the input tax credit as per para 2.8 and 2.9 of section-II of ICF Bid Document.
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers?
Unapproved/new firms, Have you attached clause wise compliance of STR?
Public Procurement (Preference to Make in India) policy is applicable as per Clause 16 of Section-I of ICF Bid Document. The procurement shall be done in accordance with the extant instruction of DPIIT (Department of Promotion of Industry and Internal Trade) for Make in India policy.
The bidders shall be required to provide a self- certificate for the local content at the time of tendering. However, at the time of execution of the contract, a certificate from the statutory auditor or cost auditor of the company (in the case of companies) or from a practising cost accountant or practising chartered accountant (in respect of suppliers other than companies) giving the percentage of local content shall be provided. Please refer clause 16.1.3 and 16.1.4 of section-I of Bid document for further details and Annexure VII of Bid document for the format of Certificate of local content.
Firms are advised to submit the offer from their IREPS ID which is listed in the vendor directory of RDSO/ICF/RCF and other vendor approving agencies for the tendered item.
EARNEST MONEY DEPOSIT (EMD): - (i) Regarding EMD, please refer to clause 6.1 of section I Instructions to tenderer of ICF Bid Document attached to the tender. Tenderers seeking exemption from payment of EMD must upload the requisite documentary evidence in support of their claim for exemption from payment of EMD along with the offer. ii) Traders/ Distributors/ Sole Agent/ Works Contract are not exempted from payment of EMD as they are excluded from the purview of the MSE Policy. iii) In reference to condition No.6.1 (vi) of section I of ICF Bid Document, the exemption of EMD is applicable only to the vendors having current and valid registration with PCMM of any Zonal Railways/ Production Units for any of these trade groups 0034, 0035, 0036, 3119, 3362, 3364, 3365, 3367, 3369. Firm should submit valid Registration Certificate for proof. (iv) Approved/ Developmental vendors of RCF for Set of side wall assembly, Lavatory side wall and roof for LHB Coaches and Underframe Complete for LHB coaches shall also be eligible for EMD/SD exemption for all categories of orders.
(i) In case of MSE firm willing to claim the benefits under Public Procurement Policy (Preference to MSE) order 2012, the firm should upload with their offer, the proof of their being MSE registered with the agency mentioned in clause 13.1 of section-I of ICF Bid document, failing which such offers will not be liable for consideration of benefits detailed in para 13.3 of section-I of ICF Bid document. (ii) As per Gazette notification no. S.O.4926(E) dated 18.10.2022 amending notification no.S.O.2119(E) dated 26.06.2020 circulated vide Railway Board letter no. 2020/RS(G)/363/1 dated 03.11.2022 regarding re-classification of enterprises and Udyam registration, "In case of an upward change in terms of plant and machinery or equipment or turnover or both, and consequent re-classification, an enterprise shall continue to avail of all non-tax benefits of the category it was in before the re-classification, for a period of three years from the date of such upward change." In such cases, the tenderer claiming such benefits shall submit necessary documentary evidence along with offer. (iii) Tenderers shall upload Udyam Registration detail showing that the enterprise is owned by Scheduled Castes (SC)/ Scheduled Tribes (ST)/ women entrepreneurs to claim the benefit under this sub- classification.
The bidders should quote the applicable HSN codes and it is the responsibility of the tenderer to quote the correct HSN code and upload the document.
Goods & Services Tax (GST): Will be applicable as per Clause 2.0 and all sub clauses of Section-II of ICF Bid Document.
Passing the benefits of ITC: I hereby confirm following: "We hereby declare that in quoting the above price, we have taken into account the full effect of Input Tax Credit available under GST. We, further agree to pass on any financial gain/ benefit as may become available in future in respect of all the input tax credit on the date of supply by way of reduction in price and advise the purchaser accordingly. We also undertake that we are aware of the provisions of section 171 of the CGST Act and consequences thereof if we fail to comply with the same."
It will be presumed that the firms who have submitted the e-bid have gone through and accepted all the terms and conditions of tender, until and unless firms specify the deviations from those conditions and so indicated specifically, under the headings - "Technical Deviation Statement" and "Commercial Deviation Statements". And if space available is not adequate, tenderers can upload a Statement of Deviations and a reference of uploaded deviation statement shall be given in "Technical or Commercial Deviation Statement". If there is any contradiction between any techno commercial terms and conditions quoted in e-offer and documents attached along with the e-offer, the terms & conditions quoted in e-offer will prevail over that of quoted in attached documents. Tenderers in their own interest are advised not to quote any techno commercial terms & conditions in attached documents.
Please submit the details of the location at which the local value addition is being made.
It is certified that the item offered meets the local content requirement for "Class-I local supplier".
The tenderers shall indicate the details of their Jurisdictional Assessing Officers (Designation, address & email id) for GST.
JIT Delivery Conditions: i) Being "As and When/JIT" required item(s), tentative delivery completion time for tendered/ PO quantity is given in Tender/ PO. The firm has to supply material as per monthly/ weekly allotment of quantity as per schedule, which will be advised minimum 45 Days in advance through meeting minutes/ letter. It may be noted that 45 days will be counted from the date of modification advice. This allotted quantity shall be required to be supplied as per the schedule advised through letter/ Modification advice. For the first allotment after placement of PO, minimum time of 60 days/ as per P.O will be allowed since firms may require additional time for procurement of raw materials/ bought out items. However, in subsequent allotments minimum time of 45 days only will be allowed. ii) Every allotment shall be considered a severable contract. Notwithstanding the facts that terminal delivery period for complete supplies is at a later date, performance of the contract by the vendor will be dependent on the successful supplies against weekly/ monthly requirements advised to the firm as severable contracts. If the firm fails to supply the allotted requirement as per schedule, ICF reserve the right to cancel the order of unsupplied allotted quantity by levying the damages including forfeiture of proportionate security deposit as applicable in the event of failure of the contract as per the terms and conditions. iii) In case of two continuous failures against allotments, ICF reserves the right to cancel the balance (unallotted) quantity of the contract also as per the terms and conditions applicable for cancellation duly noting poor performance irrespective of the final delivery date as per the original P.O. In case of continuous failures as above, the terminal delivery period shall not be the binding for cancellation of balance quantity of the contract. iv) In case of failure of supply by firm in the allotted week/ month as per Schedule and if ICF decides to accept the delayed supply, ICF reserve the right to levy LD on such delayed quantity, as applicable in the event of delayed supplies, as per the terms and conditions. v) Allotment will only be given "as and when" required by the ICF as per production requirement and ICF does not guarantee that quantity allotment will be given every week/ month. vi) Material should be offered for third party inspection as mentioned in PO for the quantity allotted through M.A. and within the DP given for the allotted quantity in the modification advice of contract. Terminal delivery period shall not be taken as granted for inspection purpose.
For the purpose of allotment being JIT Item, firm to inform their maximum monthly rate of supply while submitting offer, failing which firm has to supply quantity allotted by ICF.
For the purpose of allotment being JIT Item, firm to inform lead time required by them for supplying monthly rate of quantity, failing which firm has to supply as per lead time decided by the ICF.
The certificate for local content shall have valid UDIN and Purchaser reserves the right to verify the authenticity of CA certificate from the following links. a. For Chartered Accountants https://udin.icai.org/search-udin b. For Cost Accountants https://elcmal.in/udin/VerifyUDIN.aspx c. For Company Secretaries https://stimulate.icsi.edu/udin/Home/UDINVerification
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
2 conditions
Validity of Offer: No deviation from the offer validity period stipulated in the NIT header of this tender document is permitted. For additional conditions please refer Clause 12.0 of Section -I of ICF Bid Document.
Price Variation Clause: Applicable as per Tender document or annexure attached. Please refer Clause 1.3 of Section - II of ICF Bid Document. No deviation from the Price Variation Clause as stipulated in this Tender document or annexure to the tender document is permitted.
1 location across Tamil Nadu · 60 Set total
SHELL KIT ITEM (LSLRD WITHOUT DG SET)
02261304~ICF
02261304
Open - Indigenous
Goods
Chennai, Tamil Nadu
₹0
₹20 L
7 May 2026
13 Apr 2026
1 item · 60 Set total
SHELL KIT ITEM FOR LSLRD WITHOUT DG SET 1)UNDERFRAME COMPLETE TO DRG. NO. 74111001, AL T 'g' 1 No. THE MANUFACTURING FACILITY AS PER ICF/MD/SPECN.147, ISSUE STATUS-01, REV.02 WITH AMENDMENT NO.2. 2)ROOF ASSEMBLY TO DRG. NO. 74116001, ALT 'f' - 1 NO. To be supplied with welding pin as per Drg No 741 10053, Alt "Nil'- 1 No. (with latest sub drawing 49516008, Alt 'a') 3)END ROOF ASSEMBLY TO DRG. NO. 58116066, A LT 'h' - 2 Nos. 4)LOCATION OF 2 mm SIDE WALL ASSEMBLY TO DRG. NO. 74114001, ALT 'e' COL.I - 1 NO. LOCATION OF BACK PIECES TO DRG. NOS. 74114071, ALT 'c' AND 74114056, ALT 'NIL' SHALL BE ASSEMBLED ON SIDE WALLS. ITEMS MARKED AS LOOSE IN DRG. NOS. 74114071, ALT 'c' AND 74114056, ALT 'NIL' TO BE SUPPLIED AS LOOSE, AL ONG WITH SIDEWALL ASSEMBLIES. THE FIRM SHALL FULFILL THE REQUIREMENT AS PER ICF/MD/SPECN. 200, ISSUE STATUS-01, REV-04 WITH AMENDMENT NO.1 5)END WALL COMPLETE NPP END TO DRG. NO. 74115003, ALT 'c' -1 N O. 6)END WALL COMPLETE PP END TO DRG. NO. 74115001, ALT 'h' -1 NO THE FIRM SHALL FULFIL THE REQUIREMEN T AS PER ICF/MD/SPEC-315,ISSUE STATUS-01, REV.00. 7) BODY SHELL ITEMS AND PARTITION FRAMES TO DRG.NO. 74110001, ALT 'g' (EXCEPT ITEMS 1 to 6) - 1 NO. Firm has to supply Roof and Sidewall without applying ETCH primer . Special Condition : PACKING FOR ROOF AND SIDE WALL AS PER SCHEDULE A-(To be delivered to SHELL) COMPLET E ROOF AND SIDE WALL TO BE SUPPLIED WITH WELDING PINS WELDED TO ROOF ASSEMBLY AS PER DRAWING. SCH EDULE B-(To be delivered to FUR) CAP TO DRAWING NO 49516008002 Alt 'a' and SERRATED SPRING WASHER TO D RAWING NO 49516008003 Alt 'a' OF REQUIRED QUANTITY AS PER DRAWING ARE TO BE PACKED IN SUITABLE POLYT HENE BAGS OF 100 MICRONS THICKNESS WITH PRINTED LABEL WITH COMPLETE DETAILS KEPT INSIDE HTHE POLYTHENE BAGS. (Complte details: 1. Item Description 2.Qty in the packing 3. Date of packing 4.PO NO. 5. Type of coach 6. vendor's Name and address.) "POLYTHENE BAGS TO BE SEALED PROPERLY TO PREVENT MOISTURE AND W ATER ENTRY". A) i) PACKING AS PER ICF/J&T/MISC-2201, ALT 'e' SAFETY INSTRUCTION AS PER ICF/J&T/SK-1867, ALT. 'NIL' ii) Sl.no 16#b of Note to drawing 58216002,Alt 'k' to be strictly followed. PACKING FOR END WALL AS PER DRG. ICF/J&T/SK-1809, ALT 'a' PACKING CONDITION FOR UNDERFRAME AS PER ICF/J&T/MISC/2487, ALT 'b' PACKING DRA WING FOR BODY SHELL ITEMS AND PARTITION FRAMES. ICF/J&T/SK-1865, ALT 'a' THE UNDERFRAME SHOULD BE SU PPLIED AS NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. ALL THE THREADED HOLES SHALL BE PROVIDED WITH SUITABLE DUMMY BOLTS TO SAFEGUARD THE THREADS. [SAFETY ITEM] [ Warranty Period: 30 Months after the da te of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lac s ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| LHB DEPOT/ICF,Chennai, ICF | Tamil Nadu | 60.00 Set |
| Total | 60 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5739010.pdf
ATTACHMENT
5739423.pdf
ATTACHMENT
5739359.pdf
ATTACHMENT
5739370.pdf
ATTACHMENT
5739371.pdf
ATTACHMENT
5739373.pdf
ATTACHMENT
5739375.pdf
ATTACHMENT
5739378.pdf
ATTACHMENT
5739379.pdf
ATTACHMENT
5739383.pdf
ATTACHMENT
5739385.pdf
ATTACHMENT
5739388.pdf
ATTACHMENT
5739393.pdf
ATTACHMENT
5739396.pdf
ATTACHMENT
5739397.pdf
ATTACHMENT
5739399.pdf
ATTACHMENT
5739401.pdf
ATTACHMENT
5739406.pdf
ATTACHMENT
5739015.pdf
ATTACHMENT
5739018.pdf
ATTACHMENT
5739021.pdf
ATTACHMENT
5739023.pdf
ATTACHMENT
5739409.pdf
ATTACHMENT
5739411.pdf
ATTACHMENT
5739413.pdf
ATTACHMENT
5739416.pdf
ATTACHMENT
5739418.pdf
ATTACHMENT
5739420.pdf
ATTACHMENT
5739422.pdf
ATTACHMENT
5739013.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .