| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹7.4 LAccepted-AOC | ₹7.4 L | L 1 | Accepted-AOC LOWEST 1 |
| 2 | L 2₹7.5 LRejected-Finance | ₹7.5 L | L 2 | Rejected-Finance FINANCIAL BID OPEN |
Tender Value
₹7.4 L
EMD Value
₹15,000
Closing Date
2 May 2026, 1:00 pmClosed
Project Manager
PROJECT MANAGER, UNIT-6, U.P. PROJECTS CORPORATION LTD. Unit Office-14, CHANDRA SHEKHAR NAGAR COLONY,TULASHERPUR, BAREILLY
REPAIR AND RENOVATION WORK OF BIOFERTILIZER LABORATORIES AT D D OFFICE RESEARCH BAREILLY (U.P.)
2026_UPPRC_1142046_3
01/PCL/P.M./UNIT-6/BLY/2026-27
Open Tender
Civil Works
90 days
Bareilly
REPAIR AND RENOVATION WORK OF BIOFERTILIZER LABORATORIES AT D D OFFICE RESEARCH BAREILLY (U.P.)
2 documents required · 2 mandatory
₹3,540
₹15,000
27 Jun 2026
27 Apr 2026
2 May 2026
27 Apr 2026
2 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 280 | Sqm | 40.04 | ₹11,211.2 | 2 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 4.43 | Cum | 1,509.39 | ₹6,686.6 | 2 |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 35.6 | Cum | 193.38 | ₹6,884.33 | 2 |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 8 | Nos | 269.03 | ₹2,152.24 | 2 |
| 5 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineerin- charge. | 1.44 | Cum | 840.49 | ₹1,210.31 | 2 |
| 6 | Dismantling flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material, within 50 metres lead. | 17.86 | Cum | 195.21 | ₹3,486.45 | 2 |
| 7 | Providing & laying cement concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
D.S.R. Item No. 4.1.8 | 6.7 | Cum | 4,990.75 | ₹33,438.03 | 2 |
| 8 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
D.S.R. Item No. 4.1.3 | 0.37 | Cum | 5,772.11 | ₹2,135.68 | 2 |
| 9 | S&F Mild steel or iron in plain work such as reinforced concrete and reinf. b/work (when not included in overall rate) wrougt to required shape as necessary Including bending for proper completion of work and incl supply of all steel and wastage and overlapping and hook
D.S.R. Item No. 5.22.1 | 94.99 | kg | 78.47 | ₹7,453.87 | 2 |
| 10 | R.C.C. Work 1:1.5:3 Mix in Lintel Beam Including all Material and Labour. | 1.21 | Sqm | 539.52 | ₹652.82 | 2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.18 MB
BARCHART.pdf
Additional Documents • 0.17 MB
BOQ_2133014.xls
BOQ • 0.30 MB