Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 252 ANGAPPA NAICKEN STREET CHENNAI CHENNAI TAMIL NADU 600001 | CHENNAI | TAMIL NADU | 600001 | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | Rejected-Technical Not Qualified |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹12.5 L
EMD Value
₹24,980
Closing Date
21 Nov 2023, 12:00 pmClosed
CHIEF ENGINEER KSTPS, KOTA
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Supply of Rubber Expansion Joints for CW/ACW Pumps installed in Unit 6 and 7,KSTPS, Kota
2023_RRVUN_363672_1
TN-12199
Open Tender
Supply of Materials/Hiring of Goods
Item Wise
120 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹590
Yes
digitally as mentioned in tender documents
₹24,980
Yes
6 Mar 2024
12 Sept 2023
22 Nov 2023
12 Sept 2023
21 Nov 2023
12 Sept 2023
Rubber Expansion joint size:-ID 1500 NB, OD-1854 PCD 1759 No. of Holes 52, Hole dia 48 length 300, Design pr.5.0 Kg/cm² for U#7 (CW Pumps)
Rubber Expansion joint size:-ID 1600NB, OD-2035 PCD 1930 No. of Holes 52,Hole dia 48 length 350, Design pr.5.0 Kg/ cm² for U#6 (CW Pumps)
Rubber Expansion joint size:-ID 700NB, OD-930 PCD 863.6 No. of Holes 28,Hole dia 35 length 300, Design pr.9.0 Kg/ cm² for U# 6 &7 (ACW Pumps)
max flow systems
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .