Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L Quoted ₹2.8 L | L1 | Accepted-AOC awarded |
| 2 | L2₹2.8 LRejected-AOC | ₹2.8 L | L2 | Rejected-AOC 0 |
| 3 | L3₹2.8 LRejected-AOC | ₹2.8 L | L3 | Rejected-AOC 0 |
| 4 | Not Admitted-Fee/PreQual/Technical VIDYUT BHAWAN HPSEBL SHIMLA 171004 HP | SHIMLA | HIMACHAL PRADESH | 171004 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Kumar Singh L3 | Dina Nath L2 | Dhale Ram L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. up to all depths and in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling / wedging out of soft/hard rock , where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly , returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 12.8 | Cum | 550 ₹7,040 | 520 ₹6,656 | 500 ₹6,400 |
| 2.00 | Providing and laying cement concrete 1:6:12 (1cement :6 sand :12 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth.as per direction and to the entire satisfaction of Engineer in charge | 2.46 | Cum | 9,100 ₹22,386 | 9,050 ₹22,263 | 9,000 ₹22,140 |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling in all heights and removal of the same for insitu -reinforced concrete and plain concrete work in : | ||||||
| 3.01 | Vertical surfaces such as wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. | 60.25 | Sqm | 660 ₹39,765 | 655 ₹39,463.75 | 650 ₹39,162.50 |
| 4.00 | Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts | 22.98 | Cum | 8,600 ₹2.0 L | 8,585 ₹2.0 L | 8,500 ₹2.0 L |
| 5.00 | Boulder filling behind breast wall with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 2.32 | Cum | 3,550 ₹8,236 | 3,535 ₹8,201.20 | 3,500 ₹8,120 |
| 6.00 | Providing and fixing 100 mm dia PVC pipearrangements in weep holes including pvc mesh with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 12 | Rmt | 650 ₹7,800 | 610 ₹7,320 | 600 ₹7,200 |
Tender Value
₹2.1 L
EMD Value
₹4,178
Closing Date
27 Feb 2026, 5:00 pmClosed
Executive Engineer Jal Shakti Division Larji
Executive Engineer Jal Shakti Division Larji
(SH- C/O PCC Breast Wall to protect the existing Pump house at Stage 1st)
2026_HPIPH_128905_7
NIT No. 12985-13084 Dated - 18/02/2026
Open Tender
Civil Works
60 days
Banjar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer Jal Shakti Division Larji
₹4,178
30 Mar 2026
18 Feb 2026
28 Feb 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
Excavation in foundation and trenches etc. up to all depths and in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling / wedging out of soft/hard rock , where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly , returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts complete in all respects within all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement concrete 1:6:12 (1cement :6 sand :12 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth.as per direction and to the entire satisfaction of Engineer in charge
Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling in all heights and removal of the same for insitu -reinforced concrete and plain concrete work in :
Vertical surfaces such as wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc.
Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts
Boulder filling behind breast wall with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge.
Providing and fixing 100 mm dia PVC pipearrangements in weep holes including pvc mesh with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_190601.xls
BOQ • 0.34 MB
Form6.pdf
Tender Documents • 0.63 MB
Form8.pdf
Tender Documents • 1.43 MB
Terms.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid