| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder | |
| 2 | L2₹13.1 L+₹1.2 L (9.70%)Rejected-AOC | L2 | Rejected-AOC Competent committee rejected the file due to higher rates | |
| 3 | L3₹14.2 L+₹2.3 L (18.9%)Rejected-AOC 1020 PAWAR PAWAR POST OFFICE SARASWATI SALES FIRST FLOOR KHASRA NNO 1020 SHARMA NIWAS PAWAR SHIMLA HIMACHAL PRADESH 171219 | SHIMLA | HIMACHAL PRADESH | 171219 | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
Tender Value
₹13.1 L
EMD Value
₹13,150
Closing Date
12 Oct 2021, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For the work of replacement of damaged/rusted condutor, Increasing capacity of Distribution Transformer etc at various places fed from various 33/11 KV S/s under EDD-II, Bareilly (Buisness Plan 2021-22)
2021_MVVNL_616013_2
17/EDCB/2021-22
Open Tender
Electrical Works
Item Rate
60 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE,EDC
₹13,150
26 Apr 2022
25 Sept 2021
13 Oct 2021
25 Sept 2021
12 Oct 2021
25 Sept 2021
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-II, Bareilly. Approx. distance upto 80 Km. Including safe loading and unloading.
PCC Pole 8.5 meter long.
STP 11 Mtr Long
Line material i.e., cross arm/ conductor/ pin insulater/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc
11/0.4 KV 3 Phase 63 KVA T/F
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
ST Pole 11 Mtr Long Single Pole.
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Dismentaling of Old and damaged conducor complete in all respect
Dismentaling of Existing Distribution Transformer for inceasing capacity complete in all respect
11/0.4 KV 3 Phase 25 KVA T/F
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
ACSR Rabbit Conductor
ACSR DOG Conductor
Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides.
11 KV XLPE Cable Size 3x300 sqmm
Filling of Cable Jointing Kits as per norms complete in all respect
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Mounting of Following Capacity Transformers as per norms complete in all respect -
63 KVA T/F
Guarding at road crossing complete in all respect
Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 80 Km including loading & unloading.
Scrap (Line material)
11/0.4 KV 3 Phase 25 KVA T/F
M/S R.S. ENGINEERING TRADERS
M/S SARASWATI SALES CORPORATION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .