| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC NEAR GOVT POLYTECHNIC COLLEGE DEOD KHERI ROAD BY PASS KAITHAL | ₹14.1 L | L1 | Accepted-AOC LOA |
| Sl No | Description | Qty | Unit | M/s Mahadev Electrical works L1 |
|---|---|---|---|---|
| 1.00 | `SITC of T/F Plate Farm set without J Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` | 2 | Each | 6,850 ₹13,700 |
| 2.00 | `SITC of Pcc Pole 11 Meter Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` | 26 | Each | 9,500 ₹2.5 L |
| 3.00 | `SITC of ACSR 50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` | 1,200 | Kg. | 225 ₹2.7 L |
| 4.00 | `SITC of Stay Set 8`Long with Elow and Nuts with X plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` | 13 | Each | 1,190 ₹15,470 |
| 5.00 | `SITC of Stay Wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 130 | Kg. | 89 ₹11,570 |
| 6.00 | `SITC of GSL No 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 180 | Kg. | 89 ₹16,020 |
| 7.00 | `SITC of 11 KV Pin insulator with Pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 21 | Each | 145 ₹3,045 |
| 8.00 | `SITC of 11 KV Disc insulator with Fitting required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 21 | Each | 115 ₹2,415 |
| 9.00 | `SITC of V-Shape X-Arm 75X40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 3 | Each | 1,015 ₹3,045 |
| 10.00 | `SITC of Top Hamper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work
( As per UHBVN Specification ).
` ` | 3 | Each | 290 ₹870 |
Tender Value
₹12.1 L
EMD Value
₹24,160
Closing Date
10 Nov 2025, 5:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Construction of 4 Lane road from Urnai Sainsa road to Urnai Temple (ID 7871) including decorative lights in Distt. Kurukshetra (CM Announcement Code no. 26037 dated 06.04.2022) (Recall)
2025_HRY_481118_1
2025336A3CA2 515B 4CBC 89EB CD649FD91D08663BAR
Open Tender
Civil Works
160 days
Ambala
Construction of 4 Lane road from Urnai Sainsa road to Urnai Temple (ID 7871) including decorative lights in Distt. Kurukshetra (CM Announcement Code no. 26037 dated 06.04.2022) (Recall)
2 documents required · 2 mandatory
₹1,000
₹24,160
Yes
27 Jan 2026
3 Nov 2025
11 Nov 2025
4 Nov 2025
10 Nov 2025
4 Nov 2025
Amount
`SITC of T/F Plate Farm set without J Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
`SITC of Pcc Pole 11 Meter Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
`SITC of ACSR 50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
`SITC of Stay Set 8`Long with Elow and Nuts with X plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). `
`SITC of Stay Wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of GSL No 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of 11 KV Pin insulator with Pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of 11 KV Disc insulator with Fitting required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of V-Shape X-Arm 75X40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Top Hamper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of G.I. Channel 75X40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of MS Channel 100X50x6mm 3350mm (for H-Pole) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of G.I. Angel Iron 50X50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of MS Angel Iron 50X50x6mm 2400, (for earth Angle) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of MS Flat 50X6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of MS Nuts and Volts All Sizes required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Number Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Earthing with earth rod required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of 11 KV G.O. Switch Comp. 11mtr. Pole required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Lighting Arrestor required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Barbed Wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of PG Clamp for 50 / 80mm2 ACSR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of D-Strap required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of Aluminium Thimble 185 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`SITC of LT Fuse Unit required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of 25/63KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of 100KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of H-Pole with 2no. Stay (11Mtr.) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of GSL GURD complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of Gurding Angle complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of Three Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of Single Phase Meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of 4C Cable up to 20 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of 3 Phase MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Erection of 2C PVC up to 30 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of 25/63KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of 100KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of PCC Pole 9 meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of Three Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of Single Phase Meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of H-Pole with 2no. Stay (9/11Mtr.) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of LT S/C Cable 95 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of ACSR 50mm complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of 3 Phase MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of 4C Cable up to 20 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Dismantle of 2C PVC up to 30 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Fabrication Charge for Steel items i/n Painting and Transportation Charges complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` `
`Cost of painting of PCC pole i.e. pole number, feeder name in black colour on 8 inch yellow circular background including cost of paint and labour charges to complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. ` `
`SITC of LT 4/C Cable 25 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). `
`SITC of LT S/C Cable 95mm2 Arm. required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). `
`SITC of 2/C PVC 10mm2 Arm. Cable required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). `
`SITC of 2/C PVC 10mm2 Un-Armd Cable required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). `
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.14 MB
BOQ
BOQ • 0.26 MB
Download all tender documents and submit your bid