Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹6.7 LAccepted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | 1st | Accepted-Finance accepted | |
| 2 | 2nd₹6.8 L+₹11,296.12 (1.69%)Rejected-Finance | 2nd | Rejected-Finance refund | |
| 3 | 3rd₹7.2 L+₹56,480.62 (8.47%)Rejected-Finance HIMACHAL PRADESH HP | 3rd | Rejected-Finance refund | |
| 4 | 4th₹7.3 L+₹67,776.75 (10.2%)Rejected-Finance | 4th | Rejected-Finance refund |
Tender Value
₹7.5 L
EMD Value
₹16,000
Closing Date
24 Jul 2026, 6:00 pmClosed
EE Dharampur
HPPWD Dharampur
C/O Wire wall at RD81/030 to 81/045 and 81/255 to 81/267)
2026_PWD_139315_4
PW-DPD-Tender-2026-27-7238-40 dt. 13/07/2026
Open Tender
Civil Works - Roads
Percentage
60 days
Dharampur
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Yes
₹16,000
Yes
5 Aug 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds classification of soil in foundation of structures upto all depth/ height as per drawing and technical specification Clause 305.1 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead and lifts dressing of sides and bottom and back filling with approved material and disposal of all surplus excavated earth in specified site and as per direction of Engineer-in-charge complete.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 250 | - |
| 2 | Providing and laying boulder apron laid in wire crate with 4 mm dia wire confirming to IS 280 and 4826 in 100x100 mm mesh (Woven diagonally) including 10% extra for laps and joints laid with stone boulder weighing not less than 25 Kg each as per drawing and technical specification including carriage of materials with in all leads and lifts and direction of Engineer in Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 3,200 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.46 MB
sts13.docx
Tender Documents • 7.70 MB
BOQ_206524.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .