Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
10 Aug 2026, 6:00 pm
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
CONSTRUCTION OF CULVERT NEAR JAMIA MASJID SHAREEF HARDABOORA A . PYTT HALQA ,- HARDABOORA A BLOCK HARDABOORA SCHEME,- ADP (BDC) FY,- 2026-27
2026_RDPR_317331_9
146Xen/Rew/Bla/2026-27 Dated 22/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,920
22 Jul 2026
22 Jul 2026
11 Aug 2026
22 Jul 2026
10 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 4.08 | Cum | 479.3 | ₹1,954.39 |
| 2 | Providing and laying of stone solling hand Packed including Carriage & plum in concrete. | 1.98 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | 0.68 | cum | 1 | ₹0.68 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.6 | cum | - | - |
| 6 | Reinforced cement concrete work in walls including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.29 | cum | - | - |
| 7 | Reinforcement for RCC work include straightening cutting, bending, binding and placing in position all complete HYSD steel bars at all levels | 471.9 | kg | 1 | ₹471.43 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for foundation in Footings etc for mass Con | 1 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms | - | sqm | - | - |
| 10 | Suspended floors, roofs, landings, balconies and access platforms Above 20 cm wide | 1 | Sqm | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1039549.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].