Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹52.8 LAccepted-AOC KAITHALI GATE WORD NO 8 PUNDR1 RURAL 26 KAITHAL PUNDR1 HARYANA 136026 | KAITHAL | KAITHAL | HARYANA | 136026 | 1 | Accepted-AOC AOC | |
| 2 | 2₹54.6 L+₹1.9 L (3.53%)Rejected-Finance | 2 | Rejected-Finance Rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical HARYANA HR | AMBALA | HARYANA | 133001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical NEAR HANUMAN MANDIR VILLAGE KOHAR TEH DISTT BHIWANI | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹56.1 L
EMD Value
₹1.1 L
Closing Date
14 Sept 2026, 5:00 pmClosed
Vikas Dhiman
Municipal Corporation Yamunanagar
Construction of Street and RCC Nala from Behind Geeta Mandir to Police Chowki in Patri Moholla Ward No.-05, M.C Yamunanagar Jagadhri Recall
2026_HRY_545438_1
202627CFA112 4F65 452C 943E 57E0E2ED395E288ULB
Open Tender
Civil Works
Works
170 days
Jagadhari
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
14 Oct 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 304.5 | cum | 1,863 | ₹5,67,283.5 |
| 1.02 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 540.71 | Kg. | 83 | ₹44,878.93 |
| 1.03 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 229.24 | cum | 66 | ₹15,129.84 |
| 1.04 | [3.1.17.9]By Mechanical Transport including loading, unloading and stacking 17.9. R.C.C. pipe, A.C. pipes, steel cylinder, R.C. pipes, S.C.I. pipes, C.I. pipes and unreinforced cement pipes
450 mm & 500 mm dia [5km] | 4.2 | 100 Metres | 2,408 | ₹10,113.6 |
| 1.05 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 714 | cum | 83 | ₹59,262 |
| 1.06 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 235.2 | cum | 78 | ₹18,345.6 |
| 1.07 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 478.8 | cum | 83 | ₹39,740.4 |
| 1.08 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 219.3 | cum | 1,149 | ₹2,51,975.7 |
| 1.09 | [5.53.1]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 1. up to 600 mm dia [Through Rate] | 420 | Metre | 85 | ₹35,700 |
| 1.1 | [5.6]Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : [Through Rate] | 9.94 | cum | 266 | ₹2,644.04 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_625011.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .