Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹13.4 L+₹77,356.11 (6.14%)Rejected-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | L2 | Rejected-AOC Second Lowest |
Tender Value
₹16.6 L
EMD Value
₹41,600
Closing Date
9 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer KIP RB Division No II PulamonKottarakkara PIN 691531
Rectification of damaged lining
2020_Irrig_388965_1
6/ET/KIP/RB/DnII/2020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
karavaloor
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,350
Yes
SBI Kottarakkara
₹41,600
Yes
19 Nov 2020
1 Oct 2020
15 Oct 2020
1 Oct 2020
9 Oct 2020
1 Oct 2020
45 days
Amount
Scheme 1.LBMC Between Ch.12228m to 12275 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc complete as per specification and as per the direction of Engineer-in-charge.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme 2 - Rectification of canal lining between ch. 12300m to 12350m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc complete as per specification and as per the direction of Engineer-in-charge.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curingetc complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme -3 Rectification of super passage at ch. 12380 m of LB main canal .
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead etc complete as per specification and as per the direction of Engineer-in-charge.
26.28.3 : Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete etc complete as per specification and as per the direction of Engineer-in-charge.
26.29.1 : Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter
26.31.1 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer etc complete as per specification and as per the direction of Engineer-in-charge.
od18242/2020_2021/P2 : 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 ( 1 cement : 6 fine sand). including extra Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof.etc complete as per specification and as per the direction of Engineer-in-charge.
od29596/2020_2021/P2 : Labour engaged for removing slipped earth from super passage as per the direction of deptl officers at site.etc complete as per specification and as per the direction of Engineer-in-charge.
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)etc complete as per specification and as per the direction of Engineer-in-charge.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme 4 -Rectification of Canal lining between ch. 12380 m to 12450 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining etc complete as per specification and as per the direction of Engineer-in-charge.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme 5 - Rectification of canal lining between ch. 12480 m to 12560
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and reliningetc complete as per specification and as per the direction of Engineer-in-charge.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc complete as per specification and as per the direction of Engineer-in-charge.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour chargesetc complete as per specification and as per the direction of Engineer-in-charge.
Scheme 6- Rectification damages of S P at ch. 12560m
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)etc complete as per specification and as per the direction of Engineer-in-charge.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil etc complete as per specification and as per the direction of Engineer-in-charge.
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)etc complete as per specification and as per the direction of Engineer-in-charge.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)etc complete as per specification and as per the direction of Engineer-in-charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme -7 - Rectification of canal lining between ch. 12560m to 12620 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per the direction of deptl officers at site.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per the directions of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 8 - Rectification of canal lining between ch. 12650 m to 12700m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per the direction of deptl officers at site.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per the directions of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 9 - Rectification of canal lining between ch. 12720 m to 12780 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per the direction of deptl officers at site.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per the directions of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 10 - Rectification of canal lining between ch. 12830 m to 12880 m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per the direction of deptl officers at site.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per the directions of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme 11 - Rectification of canal lining between ch. 12940 m to 13000m
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.etc complete as per specification and as per the direction of Engineer-in-charge.
od17773/2020_2021/P2 : Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kindsof soil for clearing the canal bed for desilting and relining as per the direction of deptl officers at site.
od17700/2020_2021/P2 : Cement concrete 1:4:7 20mm broken stone to lines and levels for bed and sides of canal including all cost and conveyance of all materials ,labour charges ,watering curing etc. complete as per the directions of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per specification and as per the direction of Engineer-in-charge.
Scheme - 6 Appendix B
14.6 : Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.etc complete as per specification and as per the direction of Engineer-in-charge.
R.Rajendran Pillai
Bidder Name
R.Rajendran Pillai
Mathew M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_553083.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .