Tender Value
₹3.9 L
EMD Value
₹3,947
Closing Date
20 Apr 2026, 2:30 pmClosed
Municipal Corporation of Rajahmundry
Municipal Corporation, Rajahmundry
Repairs to Vehicle Sweeping Machine AP05TN0753 in RMC.
920154
462/MCR/General/2025-26
OPEN - NCB
Civil Works
EAST GODAVARI
9 documents required · 5 mandatory · 4 optional
₹140
₹3,947
4 Apr 2026
4 Apr 2026
4 Apr 2026
Replacement of Hydraulic Brush UP & Down Cylinder oil seal kit including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of Blower Nylone pipe including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 4 tyres 10-30 16PR SL 707 including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 12v battery 90 AHPS including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of side brush Motors including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement side brushes including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer.
Replacement side brushes including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Brush Plates
Replacement side brushes including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Fabrication work of section wheel along with complete mounting assembly, including all required fitting, cutting, bending, shaping, assembles materiasl with labour charges etc. complete as directed by the Site Engineer. For Check Nut
Fabrication work of section wheel along with complete mounting assembly, including all required fitting, cutting, bending, shaping, assembles materiasl with labour charges etc. complete as directed by the Site Engineer. For Bearings
Brush motor hydraulic pipe replacement including ocst and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush UP & Down Pipe
Brush motor hydraulic pipe replacement including ocst and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush Motor prazar pipe
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section UP & Down Coil
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Hopper UP & Down Coil
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Hopper Door
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush Rotation
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Wiring Kit
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Connectors
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Labour charges
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section Wheels
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bearings
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Nuts & Bolts
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 12v Battery 130 Amps
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Radiator cleaning
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Blower Fan Belt
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fan Belt
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Hydraulic Pump
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine oil filter
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fuel filter
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fuel filter.
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Air filter.
Solenoid wall block cleaning including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For White Light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Red Light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Yellow
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Siren light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Labour / fitting charges
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Oil Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Fuel Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Fuel Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Coolent Tank
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Diesel Tank cap
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Side Mirrors
Labour charges including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Manpower & Transport charges including cost and conveyance of all charges etc. complete as directed by the Site Engineer.
Details of Maximum amount reimbursable to the Contractor.
1) Provision for GST @18%
2) Provision for NAC @ 0.10%
Replacement of Hydraulic Brush UP & Down Cylinder oil seal kit including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of Blower Nylone pipe including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 4 tyres 10-30 16PR SL 707 including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of 12v battery 90 AHPS including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement of side brush Motors including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replacement side brushes including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer.
Replacement side brushes including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Brush Plates
Replacement side brushes including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Fabrication work of section wheel along with complete mounting assembly, including all required fitting, cutting, bending, shaping, assembles materiasl with labour charges etc. complete as directed by the Site Engineer. For Check Nut
Fabrication work of section wheel along with complete mounting assembly, including all required fitting, cutting, bending, shaping, assembles materiasl with labour charges etc. complete as directed by the Site Engineer. For Bearings
Brush motor hydraulic pipe replacement including ocst and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush UP & Down Pipe
Brush motor hydraulic pipe replacement including ocst and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush Motor prazar pipe
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section UP & Down Coil
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Hopper UP & Down Coil
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Hopper Door
Replacement of 24 v Solenoid Value Coils including cost and covneyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Brush Rotation
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Wiring Kit
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Connectors
Replacement of Solenoid Coil wiring change including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Labour charges
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Section Wheels
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Bearings
Selection wheels with Bearings Replacement including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Nuts & Bolts
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For 12v Battery 130 Amps
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Radiator cleaning
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Blower Fan Belt
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fan Belt
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Hydraulic Pump
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine oil filter
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fuel filter
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Fuel filter.
Replacement of back engine all required items including cost and conveyance of all materials and labour charg es etc. complete as directed by the Site Engineer. For Engine Air filter.
Solenoid wall block cleaning including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For White Light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Red Light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Yellow
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Siren light
Replace & Fitting of new Indicator light including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Labour / fitting charges
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Air Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Oil Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Fuel Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Engine Fuel Filter
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Coolent Tank
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Diesel Tank cap
Replacement of front Engine required items including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer. For Side Mirrors
Labour charges including cost and conveyance of all materials and labour charges etc. complete as directed by the Site Engineer.
Manpower & Transport charges including cost and conveyance of all charges etc. complete as directed by the Site Engineer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Doc.doc
TENDER_DOCUMENT • 0.65 MB
Notice 2026.doc
TENDER_DOCUMENT • 0.10 MB
Print TS 196 Nit 462.xls
TENDER_DOCUMENT • 0.06 MB
BOQ TS 196 Nit 462.xlsx
TENDER_DOCUMENT • 0.07 MB
Contractor Information.pdf
TENDER_DOCUMENT • 0.09 MB