Loading…
Loading…
Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
11 Jun 2026, 5:00 pm6d left
The Project Administrator, ITDA, Keonjhar
O/o the Project Administrator, ITDA, Keonjhar, Mandua, Keonjhar - 758001
Development of Basic Tourism Infrastructure Facility at Gonasika in Banspal Block
2026_STSCD_130292_6
Bid Identification No ITDAK- 02 / 2026-27
Open Tender
Civil Works - Buildings
330 days
Keonjhar
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.3 L
Yes
1 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0CIVIL WORK | ||||||
| 1Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the dept. | ||||||
| 1.1 | Ordinary Soil | 480.17 | Cum | 270.8 | ₹1,30,030.04 | BI01010001010000000000000515BI0100001114 |
| 1.2 | Stoney earth | 515.21 | Cum | 276.9 | ₹1,42,661.65 | BI01010001010000000000000515BI0100001115 |
| 1.3 | Soft Rock | 86.93 | Cum | 431.8 | ₹37,536.37 | BI01010001010000000000000515BI0100001116 |
| 1.4 | Hard Rock | 36.94 | Cum | 3,657.5 | ₹1,35,108.05 | BI01010001010000000000000515BI0100001117 |
| 2 | Extra for every additional lift of 1.5 m or part there of in excavation/ banking excavated or stacked materials | 36.32 | Cum | 22 | ₹799.04 | BI01010001010000000000000515BI0100001118 |
| 3 | Supplying & Filling foundation trenches , plinth & ditches with clean course river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking,royalties and all taxes of sand,cost & conveyance of water, cost of all Labour,labour cess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. | 943.4 | Cum | 1,227.3 | ₹11,57,834.82 | BI01010001010000000000000515BI0100001119 |
| 4 | Back filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. | 250.93 | Cum | 153.8 | ₹38,593.03 | BI01010001010000000000000515BI0100001120 |
| 5 | Making plinth protection 150 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth | 119.73 | Sqm | 590.6 | ₹70,712.54 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
DTCN_Basic_Tourism_Infrastructure_Facility_Gonasika_06.pdf
Tender Documents • 1.70 MB
BOQ_593472.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid