Tender ID
Tender Value
₹48.3 L
EMD Value
₹48,300
Closing Date
2 Jun 2026, 4:00 pmClosed
Superintending Engineer, RWS & S, Kakinada
Sujala Bhavan, NFCL Road, Kakinada
Providing Drainage System in Vemagiri thota of Vemagiri GP Kadiam Mandal, Est. cost Rs.80.00 Lakhs
935799
No.2/2026-27, Dt.06-05-2026
OPEN - NCB
Drainage Work
EAST GODAVARI, ANDHRA PRADESH
11 documents required · 11 mandatory
₹1,710
₹48,300
19 May 2026
19 May 2026
19 May 2026
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Supply and filling of sand in trenches, sides of foundations with intial lead in layers not exceeding 15cm thick, consolidated each deposited layer by watering and ramming as per drawing and technical specification etc complete finished item of work.
Vibrated Cement Concrete Nominal Mix(1:4:8) using 40mm downgraded HBG metal and including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for CC Bed including conveyance, seigonarage of materials of sand &metal and excluding cost of steel and its fabrication charges etc complete.
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for CC Drain Bottom Slab
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Side Wall
Vibrated Cement Concrete (1:2.5:5) using of 20mm downgraded HBG metal including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for side walls of drains including conveyance, seigonarage of materials of sand &metal, including centering charges and conveyance etc for Side Wall
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Cover Slabs
Plastering with CM (1:3)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc.complete.
Plastering with CM (1:5)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc.
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification
(Rupees Forty Eight Lakhs Twenty Eight Thousand Five Hundred and Thirty Two only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Part B Volume-II (Technical).doc
TENDER_DOCUMENT • 0.13 MB
Vemagiri Thota BOQ.xlsx
TENDER_DOCUMENT • 0.04 MB
Part A Volume-I (General).doc
TENDER_DOCUMENT • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .