| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC | ₹4.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.9 Cr+₹25.8 L (5.61%)Rejected-Finance | ₹4.9 Cr+₹25.8 L (5.61%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹5.4 Cr+₹80.6 L (17.5%)Rejected-Finance A 3 332 SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹5.4 Cr+₹80.6 L (17.5%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹5.8 Cr+₹1.2 Cr (26.3%)Rejected-Finance 1 10 5 ARJUN NAGAR BEHIND SATYA NURSING HOME KURUKSHETRA HARYANA 136118 | KURUKSHETRA | HARYANA | 136118 | ₹5.8 Cr+₹1.2 Cr (26.3%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹6.7 Cr+₹2.1 Cr (45.4%)Rejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹6.7 Cr+₹2.1 Cr (45.4%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | VARDHMAN ENGINEERING WORKS L1 | M/S SHREE BALAJI BUILDERS L6 | RAVINE ENTERPRISES L2 | Anil Kumar Contractor L5 | CREATIVE ENTREPRENEURS LLP L3 | arjun buildtech private limited L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Sub Head No.2 N.S.Items | |||||||||
| 1.01 | Sewer Line Installation and Pressure Plea Installation
Installation of HDPE product pipe by HDD method
for on grade gravity sewer including preparing and
setting up the plant and equipment, preparing new pipework
material, making of entry and exit pits upto 5
meter depth, installing new pipe-work and
commissioning system or making the system ready for
commissioning by HOD operating including, all related
civil and mechanical works like excavation, shoring/
strutting, etc. drilling, stringing, reaming, and pulling
back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT:101-2022: Code
of Practice for Horizontal Directional Drilling
Technique Suiting Indian Conditions. Note:- Sewer Line
Installation requires strict maintenance of grade
and alignment of constructed pipeline. Such critical
grade and alignment maintenance is possible only
through the use of capable tracking and drilling setup.
Engineer-in-Charge, prior to permitting use of HDD for
sewer line installation, must ensure adequacy of the
deployed equipment set. 1. For Entry/ Exit Pits beyond
5.0m depth included 2. Nominal Bore (NB) in case of
HDPE pipes shall be the outer diameter of pipes. (For
HDPE Pipes 400 mm dia OD) | 1,180 | Metre | 12,220 ₹1,44,19,600 | 17,835 ₹2,10,45,300 | 10,950 ₹1,29,21,000 | 16,500 ₹1,94,70,000 | 9,500 ₹1,12,10,000 Lowest | 13,000 ₹1,53,40,000 |
| 1.02 | Sewer Line Installation and Pressure Plea
Installation Installation of HDPE product pipe by HDD
method for on grade gravity sewer including preparing and
setting up the plant and equipment, preparing new pipe-work material, making of entry and exit pits upto 5 meter depth, installing new pipe-work and commissioning system or making the system ready for commissioning by HOD operating including, all related civil and mechanical works like excavation, shoring/ strutting, etc. drilling, stringing, reaming, and pulling back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT:101-2022: Code of Practice for Horizontal Directional Drilling Technique Suiting Indian Conditions. Note:- Sewer Line Installation requires strict maintenance of grade
and alignment of constructed pipeline. Such critical
grade and alignment maintenance is possible only through the use of capable tracking and drilling setup. Engineer-in-Charge, prior to permitting use of HDD for sewer line installation, must ensure adequacy of the deployed equipment set. 1. For Entry/ Exit Pits beyond 5.0m depth included. 2. Nominal Bore (NB) in case of HDPE pipes shall be
the outer diameter of pipes. (For HDPE Pipes 560mm dia OD) | 1,100 | Metre | 13,400 ₹1,47,40,000 | 17,835 ₹1,96,18,500 | 13,150 ₹1,44,65,000 Lowest | 19,500 ₹2,14,50,000 | 15,300 ₹1,68,30,000 | 15,000 ₹1,65,00,000 |
Tender Value
₹6.2 Cr
EMD Value
₹12.4 L
Closing Date
12 May 2026, 3:00 pmClosed
DINESH GABA
Yamuna Nagar PHED No.2
DNIT Providing and laying of HDPE pipe of various sizes by trenchless technology for gravity sewer and construction of RCC manhole and all other works contingent thereto
2026_HRY_517960_1
2026F7062BB7 91C6 4938 A2E5 A12E482A0725548PUH
Open Tender
Civil Works
Works
365 days
Yamunanagar
3 documents required · 3 mandatory
₹15,000
₹12.4 L
Yes
Yamuna Nagar
7 Sept 2026
27 Apr 2026
12 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Head No.2 N.S.Items | |||||
| 1.01 | Sewer Line Installation and Pressure Plea Installation
Installation of HDPE product pipe by HDD method
for on grade gravity sewer including preparing and
setting up the plant and equipment, preparing new pipework
material, making of entry and exit pits upto 5
meter depth, installing new pipe-work and
commissioning system or making the system ready for
commissioning by HOD operating including, all related
civil and mechanical works like excavation, shoring/
strutting, etc. drilling, stringing, reaming, and pulling
back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT:101-2022: Code
of Practice for Horizontal Directional Drilling
Technique Suiting Indian Conditions. Note:- Sewer Line
Installation requires strict maintenance of grade
and alignment of constructed pipeline. Such critical
grade and alignment maintenance is possible only
through the use of capable tracking and drilling setup.
Engineer-in-Charge, prior to permitting use of HDD for
sewer line installation, must ensure adequacy of the
deployed equipment set. 1. For Entry/ Exit Pits beyond
5.0m depth included 2. Nominal Bore (NB) in case of
HDPE pipes shall be the outer diameter of pipes. (For
HDPE Pipes 400 mm dia OD) | 1,180 | Metre | 100 | ₹1,18,000 |
| 1.02 | Sewer Line Installation and Pressure Plea
Installation Installation of HDPE product pipe by HDD
method for on grade gravity sewer including preparing and
setting up the plant and equipment, preparing new pipe-work material, making of entry and exit pits upto 5 meter depth, installing new pipe-work and commissioning system or making the system ready for commissioning by HOD operating including, all related civil and mechanical works like excavation, shoring/ strutting, etc. drilling, stringing, reaming, and pulling back the new pipe-work on the designed bore path alignment, proper disposal of drilling fluid and back fill of site after completion all inclusive as per IndSTT:101-2022: Code of Practice for Horizontal Directional Drilling Technique Suiting Indian Conditions. Note:- Sewer Line Installation requires strict maintenance of grade
and alignment of constructed pipeline. Such critical
grade and alignment maintenance is possible only through the use of capable tracking and drilling setup. Engineer-in-Charge, prior to permitting use of HDD for sewer line installation, must ensure adequacy of the deployed equipment set. 1. For Entry/ Exit Pits beyond 5.0m depth included. 2. Nominal Bore (NB) in case of HDPE pipes shall be
the outer diameter of pipes. (For HDPE Pipes 560mm dia OD) | 1,100 | Metre | 100 | ₹1,10,000 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_596835.xls
BOQ • 0.26 MB
777955Z157648.pdf
Additional Documents • 0.27 MB
OT0157648.pdf
Other Document • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .