Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.4 L+₹10,592.89 (4.62%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.6 L+₹34,057.75 (14.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.7 L+₹37,235.61 (16.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.7 L+₹38,680.10 (16.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.2 L
EMD Value
₹6,420
Closing Date
24 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Construction of public park near Eidgah at Nawabagh at Waskoora-B Block Wakura PRI 442
2026_RDPR_316468_37
E NIT No. 33/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
EXECUTIVE ENGINEER REW GANDERBAL
₹6,420
30 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. WELDED including primer and painting steel paint 2 coats | 1,043 | kg | 120.8 | ₹1,25,994.4 |
| 2 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 9.56 | cum | 479.3 | ₹4,582.11 |
| 3 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 3.15 | cum | 1,000 | ₹3,150 |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 16.74 | cum | 5,733.6 | ₹95,980.46 |
| 4.1 | 30% plums | 7.16 | cum | 1,000 | ₹7,160 |
| 5 | Centring and shuttering including propping, strutting and removal of form work for Foundations, footings, bases for columns | 39.49 | sqm | 286.35 | ₹11,307.96 |
| 6 | 12mm thick cement sand plaster in 1:6 mix | 52.28 | sqm | 266.2 | ₹13,916.94 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.72 | cum | 7,571 | ₹43,306.12 |
| 8 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 3.73 | sqm | 346.7 | ₹1,293.19 |
| 9 | Carriage of various materials sand and bajri by MT for an avg. lead of 15 km complete job | 23.11 | cum | 340.61 | ₹7,871.5 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1031756.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .