| 1 | 1₹14.7 LAccepted-AOC VADAKKEDATH HOUSE P O VELLIKULANGARA | THIRUVANANTHAPURAM | KERALA | 695001 | ₹14.7 L | 1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | sunny varghese L1 |
|---|---|---|---|---|
| 1.00Side Protection Wall along bridge | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 50 | sqm | 18.19 ₹909.50 |
| 1.00 | OD12330/2024-2025:Supplying and stacking 20 to 40dm3 in size blasted rubble for measurement
including cost, conveyance,<br>labour charges etc. complete as per the direction of departmental officers at
site. | 88.95 | cum | 2,169.15 ₹1.9 L |
| 1.00 | OD12335/2024-2025:Conveying and dumping of 20 to 40dm3 blasted rubble from stack to site to form the
rubble mount foundation as per the direction of departmental officers at site. | 88.95 | cum | 584.37 ₹51,979.71 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 60.06 | cum | 3,950 ₹2.4 L |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 8.4 | cum | 9,760.82 ₹81,990.89 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 378 | kilogram | 112.43 ₹42,498.54 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 13.22 | sqm | 386.16 ₹5,106.19 |
| 2.00Side Protection Wall along river | ||||
| 2.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 275 | sqm | 18.19 ₹5,002.25 |
Tender Value
₹15.1 L
EMD Value
₹37,777
Closing Date
27 Dec 2025, 6:00 pmClosed
Executive Engineer AID Thrissur
Executive Engineer AID ThrissuR
GENERAL-SIDE PROTECTION 2024-RMF - The maintenance and construction of Existing Side Protection work near abutment of Kainoor bridge in Nadathara Panchayath in Thrissur Taluk-General Civil Work
2025_Irrig_820545_2
IRR/IA/TR/5380/2024_5_1_1/1
Open Tender
Civil Works - Others
365 days
Kainoor bridge
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹37,777
9 Mar 2026
19 Dec 2025
30 Dec 2025
19 Dec 2025
27 Dec 2025
19 Dec 2025
Amount
Side Protection Wall along bridge
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD12330/2024-2025:Supplying and stacking 20 to 40dm3 in size blasted rubble for measurement including cost, conveyance,<br>labour charges etc. complete as per the direction of departmental officers at site.
OD12335/2024-2025:Conveying and dumping of 20 to 40dm3 blasted rubble from stack to site to form the rubble mount foundation as per the direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Side Protection Wall along river
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD13381/2024-2025:Supplying at site of work blasted rubble 20 to 40 dm3 in size and stacking the same for premeasurement as per direction of departmental officers at site
OD13386/2024-2025:Supplying Bamboo piles required length. long for driving down at the toe of the dumped rubble for stability against sliding down in river etc. complete as directed by the departmental officers at site
OD13387/2024-2025:Cutting the bamboo to the required size, sharpening one end and driving down the bamboo posts to the required depth etc. complete as directed by the departmental officers at the site.
OD13388/2024-2025:Supplying bamboo to the required length and tying with each other and with piles using 3 mm. G.I wire including all labour charges, conveyance etc. complete as per the direction of departmental officers (Assuming tying bamboo is done for a length of 45m./day)
OD13389/2024-2025:Conveying and dumping of 20 to 40dm3 blasted rubble from stack to site to form the rubble mount foundation as per the direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Bidder Name
sunny varghese
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1379158.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1379158.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.03 MB
Affidavit.pdf
Other Document • 0.52 MB
PAG.pdf
Other Document • 0.52 MB
FOT.pdf
Other Document • 0.34 MB
intgrity.pdf
Other Document • 0.25 MB
Epaymentrequisition.pdf
Other Document • 0.00 MB
SBD.pdf
Tender Documents • 2.29 MB
Download all tender documents and submit your bid