Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 184 KEELA STREET NEIKULAM NEDUNGUR LALGUDI 621105 | TIRUCHIRAPPALLI | TAMIL NADU | 621105 | Admitted-Finance |
| 2 | Admitted-Finance NO 4 84 MIDDLE STREET NEDUNGUR POST LALGUDI TALUK TRICHY DISTRICT 621 105 | TRICHY | TRICHY | TAMIL NADU | 621105 | Admitted-Finance |
Tender Value
₹16.8 L
EMD Value
₹16,750
Closing Date
13 Nov 2023, 3:00 pmClosed
Block Developement officer
panchayat union office lalgudi
CONSTRUCTION OF NEW OHT 30000 LITRES AT MARUDUR IN MARUDUR PANCHAYAT IN LALGUDI BLOCK.
2023_RDTN_385629_1
A4/3245/2023
Open Tender
Civil Works - Buildings
Item Rate
60 days
Lalgudi
pl Refer document
4 documents required · 4 mandatory
₹16,750
COMMISSIONER lalgudi
₹16,750
Yes
15 Nov 2023
4 Nov 2023
14 Nov 2023
4 Nov 2023
13 Nov 2023
4 Nov 2023
Amount
CONSTRUCTION OF NEW OHT 30000 LITRES AT MARUDUR IN MARUDUR PANCHAYAT IN LALGUDI BLOCK.Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B First depth 0.00 - 2m
Second depth 2.00 m - Below For column Foundation
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. For footing sides
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete MAT Concrete
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
Refilling the foundation with excavated earth including watering and consolidation etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Centering Rate Square column (0.00 to 2.72)
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.First brace beam bottom - (0.00 to 2.72)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Centering Rate plain surface (2.72 - 3.02)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.For First Brace Beam (2.72 - 3.02)
First Brace Beam Laid Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Square Column (3.02 - 3.30)
Square Column (3.30 - 4.30)
Square Column (4.30 - 5.30)
Square Column (5.30 - 5.74)
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Square Column (3.02 - 4.50)
Square Column (4.50 - 5.74)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Second Brace beam(5.74 - 6.04)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete As per Sl. No. 4 of Steel Schedule
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. RCC Rate (5.74 - 6.04)
Second Brace Beam LaidSupplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Second Brace beam Top to Third Brace Beam Bottom (6.04 - 8.76) Square Column (6.04 - 6.30)
Square Column (6.30 - 7.30)
Square Column (7.30 - 8.30)
Square Column (8.30 - 8.76)
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Column From Second Brace beam Top to Third Brace Beam Bottom (6.04 - 8.76)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.THIRD BRACE BEAM - (8.76-9.06)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Third Brace beam (8.76-9.06)
Third Brace beam (9.00 - 9.06)
LANDING BEAM (THIRD) Third Landing Beam Projection (8.76 - 9.00)
Third Brace beam (9.00-9.06) Landing Beam Projection (9.00 - 9.06)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Third Brace Beam Top to Floor (Grid) Beam Bottom (9.06 - 11.31) Square Column (9.06 - 9.30)
Square Column (9.30 - 10.30)
Square Column (10.30 - 11.30)
Square Column (11.30 - 11.31)
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Column From Third Brace beam Top to Floor (Grid) Beam Bottom (9.06 - 11.31)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.
Floor Slab (Centering Rate (11.61-11.61) (3.14/4)
Floor Slab Side (Curved Surface)Floor Slab side (0.00 - 0.24) Chainage Height (11.61-11.85)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.
FLOOR / GRID BEAM AND FLOOR SLAB LAIDSupplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Curv. Surface. Cent. Rate (0.00-3.30)
Curv. Surface. Cent. Rate (0.00-3.30)
Curv. Surface. Cent. Rate (0.00-3.30)
Curv. Surface. Cent. Rate (0.00-3.30)
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. RCC Rate (11.85-13.50)
RCC Rate (13.50 - 14.75)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Centering Rate plain surface (0.00 -3.30) (2.90m Height)
Tank cover slab side wall (curved) (14.75-14.93)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.RCC Rate (14.75-14.93)
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete., 2.00 No
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete., RCC Cover Slab
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers. 1.00 No
Providing cut stone slab in CM 1:3 etc., complete.,(.45x.45x.15) 0.03
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm Floor Slab
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Towards cost and supply of plumbing materials for tank inlet, outlet, scour and over flow etc.,65mm dia GI pipes for inlet connection
65mm dia GI pipes for over flow and RWH
65mm dia GI pipes for delivery pipe.
65mm dia GI pipes for scour pipe.
90mmx80mm dia PVC Threaded coupler
63mm x 40mm dia PVC Threaded coupler
65mm dia GI Tee
65mm dia GI Coupler
65mm dia GI Union
65mm dia GI Elbow
75 X 63mm dia PVC Reducer
75 X 90 mm dia PVC Reducer
65mm dia GM Gate Valve
75mm PVC Threaded coupler
63 mm PVC Pipe 4Kg (TWAD P21)
63 mm PVC Elbow (TWAD P27)
63 mm PVC Coupler (TWAD P27)
Earth work excavation in all classes of soils for lincluding labour charges only as per SS 20B. No
Refilllng with excavated earth into the same trench
Laying and jointing of PVC pipes
Provision for Painting and Drawing in OHT
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G KANAGARAJ
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .