Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | ₹2.3 Cr | L1 | Accepted-Finance Lower Rate Bidder |
| 2 | L2₹2.3 Cr+₹2.4 L (1.02%)Rejected-Finance | ₹2.3 Cr+₹2.4 L (1.02%) | L2 | Rejected-Finance Higher Rate Bidder |
| 3 | L3₹2.4 Cr+₹5.0 L (2.18%)Rejected-Finance | ₹2.4 Cr+₹5.0 L (2.18%) | L3 | Rejected-Finance Higher Rate Bidder |
| 4 | L4₹2.7 Cr+₹39.7 L (17.1%)Rejected-Finance DARBHANGA | DARBHANGA | BIHAR | 846001 | ₹2.7 Cr+₹39.7 L (17.1%) | L4 | Rejected-Finance Higher Rate Bidder |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
25 Feb 2025, 6:00 pmClosed
Executive Engineer
O/o The DIG, SHQ SSB Purnea, Kala Bhawan road DRDA Building-854301
Construction of Permanent Building at BOP Kariyot under 18 Bn SSB Rajnagar
2025_SSB_846918_1
EE/SHQ/Purnea/07/2024-25
Open Tender
Construction Works
Percentage
365 days
BOP Kariyot under 18 Bn Rajnagar
Refer to tender documents
2 documents required · 2 mandatory
₹0
₹6.1 L
Yes
Purnea
24 Mar 2025
30 Jan 2025
28 Feb 2025
31 Jan 2025
25 Feb 2025
8 Feb 2025
3 Feb 2025 - 3 Feb 2025
7 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 606.2 | cum | 177.5 | ₹1,07,600.14 |
| 1.2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 264.24 | cum | 196 | ₹51,791.04 |
| 1.3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 291.63 | cum | 2,123.75 | ₹6,19,349.21 |
| 1.4 | Supply and stacking of Fly ash conforming to IRC- 58 at site, including carriage, loading, unloading & stacking up to any lead (measured stacks will be reduced by 20% for payment). | 7.4 | cum | 281.05 | ₹2,079.77 |
| 1.5 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. | 7.6 | cum | 308.2 | ₹2,342.32 |
| 1.6 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.64 | cum | 7,878.5 | ₹5,042.24 |
| 1.7 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 67.12 | cum | 7,294.7 | ₹4,89,620.26 |
| 1.8 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 60.7 | sqm | 749.3 | ₹45,482.51 |
| 1.9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 64.73 | cum | 8,583.4 | ₹5,55,603.48 |
| 0.0 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.93 | cum | 10,852.95 | ₹96,916.84 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .