Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance FIRST FLOOR FLAT NO 6 BLOCK B CLASSIC APARTMENT GANGOTRI VIHAR DEHRADUN 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹9.5 LAdmitted-Finance GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | ₹9.5 L | L2 | Admitted-Finance |
| 3 | L3₹9.6 LAdmitted-Finance LANE NO 02 LAXMI ENCLAVE DEHRAKHASH DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹9.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SABOOR INDIA L1 | m/s star power solutions L2 | UK ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY:- | ||||||
| 1.01 | Procurement of 132 KV 3Phase 1250 Amp Isolator with Earth Switch of latest technology with motorised mechanism of approved brand in PTCUL for 132 KV Majra Jhajhra and Majra Kulhal Feeder at 132 KV Substation Majra with Freight and insurance Charges | 2 | No. | 3,50,000 ₹7 L | 3,78,660 ₹7.6 L | 3,80,000 ₹7.6 L |
| 2.00ERECTION:- | ||||||
| 2.01 | Work of dismantelling the Existing 132 KV Isolator from the structure during the shut down of 132 KV Majra Jhajhra and Laltappar feeder and remove of conductor clamps unbolt the isolator from structure and also dismantelled Isolator shifted from switchyard to store of Majra by hydraullic crane or manually, including all labour and T&P etc. | 2 | No. | 20,000 ₹40,000 | 23,500 ₹47,000 | 25,000 ₹50,000 |
| 2.02 | Work of modification of supporting structure as per requirement of New 132 KV 1250 Amp Isolator by cutting welding, drilling etc. & making earthing as per Isolator body earth point including all labour and T&P etc. | 2 | No. | 23,500 ₹47,000 | 23,500 ₹47,000 | 30,000 ₹60,000 |
| 2.03 | Work of lifting of 1250 Amp 132 KV Isolator from the store of 132 KV substation Majra & placing at supporting structure of Isolator of 132 KV Majra Jhajhra and Laltappar feeder by hydraullic crane or manually and work of tightening of all nuts and bolts, Rod alighnment and jumpering and clamping works including earthing etc.including all labour and T&P etc. | 2 | No. | 35,000 ₹70,000 | 32,500 ₹65,000 | 35,000 ₹70,000 |
| 2.04 | Providing and fixing of Isolator clamps for panther conductor suitable for 132 KV Isolator including nut bolts and washers as per given sample. | 12 | No. | 1,500 ₹18,000 | 2,800 ₹33,600 | 2,000 ₹24,000 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
5 Dec 2025, 6:00 pmClosed
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE DDUN
Providing and Fixing of 3 Phase 145KV Isolator at 132KV SS Majra
2025_PTCUX_88659_1
T 42 SE O and M CR D Dun 2025 26
Open Tender
Electrical Works
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE O AND M DIV YAMUNA COLONY PTCUL DEHRADUN
₹25,000
16 Dec 2025
4 Nov 2025
8 Dec 2025
4 Nov 2025
5 Dec 2025
4 Nov 2025
SUPPLY:-
Procurement of 132 KV 3Phase 1250 Amp Isolator with Earth Switch of latest technology with motorised mechanism of approved brand in PTCUL for 132 KV Majra Jhajhra and Majra Kulhal Feeder at 132 KV Substation Majra with Freight and insurance Charges
ERECTION:-
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
TENDERDOCT42.pdf
Tender Documents • 0.56 MB
BOQ_105179.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid