Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.9 LAdmitted-Finance 19 LAKE TEMPLE ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | -14.99% | ₹53.9 L | L1 | Admitted-Finance |
| 2 | L2₹59.6 LAdmitted-Finance 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | -6.00% | ₹59.6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 10 (c),11 (a) and 11 (g) |
Tender Value
₹63.4 L
EMD Value
₹63,376
Closing Date
9 Mar 2026, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar
S.E. Electrical Circle (RandB) Bhubaneswar, Nirman Soudha, Unit-V, 751001.
AMC for 3 No s. of 350 T R Chiller Plant at G.M.C.H. Sundargarh
2026_EICCL_126407_1
Bid Identification No.S.E.E.C (RandB) 32/2025-26
National Competitive Bid
Electrical Works
365 days
Sundargarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹63,376
24 Apr 2026
21 Feb 2026
10 Mar 2026
21 Feb 2026
9 Mar 2026
21 Feb 2026
21 Feb 2026 - 28 Feb 2026
Comprehensive maintenance of 3 Nos 350 TR Screw Chillers complete including all ducting and water pipe lines in complete as per the direction of engineer incharge (Make: Daikin, Refrigerant R-134a)
Comprehensive maintenance of 6 Nos FRP Cooling Towers (7.5 kW motors) and coloring of condenser pipeline Make- New india
Comprehensive maintenance of 3 Nos Primary CHW Pumps (11 Kw) Make-Grundfos
Comprehensive maintenance of 4 Nos Secondary CHW Pumps(11 kw) with VFD Make-Grundfos
Comprehensive maintenance of 3 Nos Condenser Water Pumps (30 kW) complete Make-Grundfos
Comprehensive maintenance of 2 Nos Hot Water Pumps (4 kW) alongwith hot water controller. Make-Grundfos
Comprehensive maintenance of 43 Nos Air Handling Units (AHUs) including filters, belts and coils
Comprehensive maintenance of 37 Nos Fan Coil Units (FCUs), all Axial Fan Unit, all Inline fan unit,all Propeller fan unit complete with HVAC Main panel, Secondary VFD Panel and all AHU CSU Starter panel, digital thermostat, actuator of all AHU and FCU.
Supply of 2 Nos Skilled Technician for HVAC system 6 AM to 2 PM (@ ₹20,403/operator)
Supply of 2 Nos Skilled Operator for HVAC system 6 AM to 2 PM (@ ₹20,403/operator)
Supply of 2 Nos Skilled Technician for HVAC system 2 PM to 10 PM (@ ₹20,403/operator)
Supply of 2 Nos Skilled Operator for HVAC system 2 PM to 10 PM (@ ₹20,403/operator)
Supply of 2 Nos Skilled Operator for HVAC system 10 PM to 6 AM (@ ₹20,403/operator)
Supply of Supervisor for HVAC system 9 AM to 6 PM (@ ₹22,218/operator)
Supply of 1 No Skilled Operator – General Shift (@ ₹20,403/operator)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
DTCN.pdf
Tender Documents • 2.28 MB
BOQ_582299.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid