Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC BIDHAN MARKET BARASAT | BARASAT | L1 | Accepted-AOC AOC | |
| 2 | L2₹10.9 L+₹3,650 (0.33%)Rejected-Finance HIJALPUKUR M M DUTTA ROAD HABRA 24 PARAGANS N | HABRA | 24 PARAGANS N | WEST BENGAL | L2 | Rejected-Finance Regretted-rate is high | |
| 3 | L3₹11.1 L+₹21,900 (2.01%)Rejected-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L3 | Rejected-Finance Regretted-rate is high | |
| 4 | Rejected-Technical | - | Rejected-Technical ed-Insufficient Doc. submitted. | |
| 5 | Rejected-Technical 33 A LIBRARY LANE SERAMPORE HOOGHLY PIN 712201 | HOOGHLY | WEST BENGAL | 712201 | - | Rejected-Technical Regretted-Insufficient Doc. submitted. |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 May 2022, 1:00 pmClosed
EE BNWD
Room No.124 1ST FLOOR PURTA BHAVAN D.F. BLOCK SECTOR I SALT LAKE KOLKATA 700 091.
Annual Day to Day Operation of Pump motor sets including minor repair pump motor set etc. for the entire campus of Shyamali Housing Estate (Two room flats, three room flat, compound), Salt Lake.
2022_WBPWD_379142_1
WBPWD/EE/NIQ02e/2022-2023
Open Tender
CIVIL WORKS
Item Rate
365 days
Salt Lake
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Yes
12 Jul 2022
2 May 2022
23 May 2022
2 May 2022
21 May 2022
6 May 2022
Amount
Day-to-day operation of Pump Motor Set for 24 hours a day for 365 days including all sorts of minor / normal maintenance of pump, motor, switch panel of pump etc. with lifting & lowering of submersible pump if required as per the direction of Engineer-in-Charge within the entire compound of Shymali Housing Estate (Two room flats, three room flats, compound), Salt lake, Kolkata during the year 2022-2023. [(i) The Bidder’s rate must be supported with sufficient break- up analysis. (ii) Every labourers engaged with this work must be paid with minimum wages as laid down in the existing Labour Department order in vogue.] Note: (At least 02 personnel at two shifts (Day) & 1 person at Night shift i.e. Morning Shift - 6.00 AM - 2.00 PM - two personnel, Evening shift - 2.00 PM-10.00 PM -two personnel, Night shift - 10.00 PM -6.00 AM- one person)
CHATTERJEE ELECTRICALS
NITESH MANAGEMENT
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .