Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹7,500
Closing Date
29 Sept 2026, 4:30 pm2d left
Public Works Department
PRAVEEN R HULJI
Annual Maintanace of 1) Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25 2)f M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80 3) Chippalaktti-Kunnal road from km 0.00 to 3.40 in Ramdurg Taluka for the year 2026-27 (Reserved for SC Category only).
PWD/2026-27/RD/WORK_INDENT42387
PWD/2026-27/RD/WORK_INDENT42387
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
9 documents required · 9 mandatory
₹500
₹7,500
12 Sept 2026
12 Sept 2026
28 Sept 2026
GOVERNMENT OF KARNATAKA
(PUBLIC WORKS DEPARTMENT)
COMMUNICATION & BUILDINGS
NORTH (ZONE) DHARWAD
EXECUTIVE ENGINEER
(Public Works Department)
BELGAUM DIVISION BELGAUM
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
ESTIMATED COST RS :- 7.00 Lakhs
PARAGRAPH 130 (A) OF THE KARNATAKA PUBLIC WORKS DEPARTMENTAL CODE
Division. PWD.Belgaum Division.Belgaum
Sub - Division. PWD, Sub- Dn.Ramdurg.
Fund Head. 3054-MDR MAINTENANCE
Department Head.
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
Estimated Cost (Rs. In Lakhs) Rs 7.00
Administratively sanctioned under No. Date.
Techanically sanctioned under No. Date.
Estimate prepared by Shri.Shrishail Chimmat S.AE
Checked by Shri.Ravikumar Nandihalli .AEE
General Description
~: ಪ್ರತ್ಯೇಕವಾಗಿ ಲಗತ್ತಿಸಲಾಗಿದೆ :~
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD, Belgaum Dn.Belgaum
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
ರಾಮದುರ್ಗ ತಾಲೂಕಿನ ಈ 03 ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆಗಳು ಇದ್ದು, .ಸದರಿ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಮಾಡುವ ಕಾಮಗಾರಿಗಾಗಿ 2026-27 ನೇ ಸಾಲಿಗಾಗಿ ಸಿದ್ಧಪಡಿಸಿದ ಕ್ರಿಯಾ ಯೋಜನೆ ಕ್ರ.ಸಂ. ರನ್ವಯ ಒಟ್ಟು ಮೊತ್ತ ರೂ7.00 ಲಕ್ಷ ಲೆಕ್ಕ ಶಿರ್ಷಿಕೆ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನರ್ವಹಣೆ ಅಡಿಯಲ್ಲಿ ಅನುವು ಇರುತ್ತದೆ. ವಾಹನ ಸಂಚಾರದಿಂದ ಮತ್ತು ಮಳೆಯಿಂದಾಗಿ ರಸ್ತೆಯ ಮೇಲ್ಮೆಯ ಮೇಲೆ ಸಾಕಷ್ಟು ತಗ್ಗು ಗುಂಡಿಗಳು ಬಿದ್ದಿರುತ್ತದೆ. ನಿರ್ವಹಣೆಗೆ ಬಾರಾದೆ ಇರುವ ಸರಪಳಿಯಲ್ಲಿ ಮೊರಮ ಅನ್ನು ಹಾಕಿ ದುರಸ್ತಿ ಮಾಡುವುದು.ಕಾರಣ ಅತೀ ಜರೂರ ಇರುವ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮಾಡುವದು ಅವಶ್ಯಕವಿರುತ್ತದೆ. ಒದಗಿಸಿರುವ ಅನುದಾನಕ್ಕೆ ತಕ್ಕಂತೆ ರಸ್ತೆ ಭಾಗದ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆಯನ್ನು ಮತ್ತು ರಸ್ತೆ ಪರ್ನಿಚರಗಳ ಕಾಮಗಾರಿಗಳನ್ನು ಕೈಗೆತ್ತಿಕೊಳ್ಳಲಾಗಿದೆ.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯಲ್ಲಿ ಈ ಕೆಳಗಿನ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಲಾಗಿದೆ.
1) ಜಂಗಲ ತೆಗೆಯುವುದು
2) ಎಸ್.ಡಿ.ಬಿ.ಸಿ. ನಿಂದ ಗುಂಡಿಗಳನ್ನು ತುಂಬುವುದು.
3) ಖಡಿ ಹಾಗೂ ಡಾಂಬರಿನಿAದ 75 ಮಿಮಿ ಆಳದ ತಗ್ಗು ಗುಂಡಿ ತುಂಬುವುದು.
5)ಕಿ.ಮಿ. ಕಲ್ಲುಗಳಿಗೆ ಬಣ್ಣ ಬಳಿಯುವದು.
6) ಅಡ್ಡಮೋರಿಗಳ ಗೊಡೆಗಳಿಗೆ ಸುಣ್ಣ ಬಣ್ಣ ಬಳಿಯುವದು.
7) ರಸ್ತೆ ಬಾಹುಗೆ ಮೊರಮ್ ಅಳವಡಿಸುವದು.
8) ಕಚ್ಚಾ ಗಟಾರು ಮಾಡುವದು.
9)ಅತೀ ಹಾಳಾದ ರಸ್ತೆಯನ್ನು ಡಬ್ಲು.ಬಿ.ಎಂ ನಿಂದ ಗುಂಡಿಗಳನ್ನು ತುಂಬುವುದು.
ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ಕರ್ನಾಟಕದ 2025-26 ನೇ ಸಾಲಿನ ರಾಜ್ಯವ್ಯಾಪಿ ಏಕರೂಪ, ಕಟ್ಟಡ, ರಸ್ತೆ & ಸೇತುವೆ ಅನುಸೂಚಿತ ದರಪಟ್ಟಿಯಂತೆ ಈ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ನಿಗಧಿಪಡಿಸಿದ ಒಟ್ಟು ಮೊತ್ತ ರೂ. 7.00 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಲಾಗಿದೆ.
ಸಹಾಯಕ ಕಾರ್ಯನಿರ್ವಾಹಕ ಇಂಜಿನೀಯರ್
ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ
ಉಪ ವಿಭಾಗ ರಾಮದುರ್ಗ
P.W.D.CODE PARA - 133
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
This is to certify that,Shri.Ravikumar Nandihalli , Assistant Executive Engineer, have personally visited spot with section officer as now and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
C E R T I F I C A T E.
(As required vide G.O.No.PWD SL.CMS.96 Dtd:27/6/1991)
Certified that, sufficient care has been taken while preparaing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work insufficient quantity are included while preparing the estimate because of grant availability,and specification of items included are completed and correct.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
C E R T I F I C A T E.
Certified that, the work proposed in this estimate has not been taken up under any other head/programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
RECAPTULATION SHEET
Sl.no P a r t I c u l a r s A m o u n t
1 Maintenance of Road 568532.38
2 Road Furniture 24298.50
SAY Rs(In Lakhs):- 7.00
Assistant Executive Engineer, PWD,Sub-Dn.,Ramdurg Executive Engineer, PWD,Belgaum Dn.Belgaum
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
S.No Item Qty Unit Rate Amount
PART A- Road Maintenance
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 286.00 100 m2 393.00 112398.00
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) 537.50 sqm 39.00 20962.50
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) 257.50 m 6.00 1545.00 143564.4
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) 201.56 Sqm 388.00 78206.25
5 Patching of Deep Potholes using WBM Gr Il & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) 526.88 Sqm 635.00 334565.63 2228206.73
6 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 215.00 cum 97.00 20855.00 #REF!
II) ROAD FURNITURE
1 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24] 22.00 km 206.00 4532.00
2 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24] 11.00 km 1135.00 12485.00
3 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24] 269.69 Sqm 27.00 7281.50
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
PART B- Gang Men
1 #REF! #REF! #REF! #REF! #REF!
PART B- Gang Men (Total):- #REF!
Assistant Executive Engineer
PWD,Sub-Dn.,Ramdurg
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
For Maintenance Length 0.00 3.84 3.84 More than 5 years
Total Maintenance Length 3.84
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.84
PART A- Road Maintenance
S.No Item Nos Measurements Qty Unit
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3)
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
Maintanance length 4.25 kms
Deduct 40% voids -6800.00
Deduct 60% voids -10200.00
Deduct village limits -2 2 1400.00 2.00 -11200.00
Deduct village limits -2 2 200.00 2.00 -1600.00
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
Maintanance length 3.1 kms
Deduct 40% voids -4960.00
Deduct 60% voids -7440.00
Deduct village limits
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Maintanance length 3.40 kms
Deduct 40% voids -5440.00
Deduct 60% voids -8160.00
Deduct village limits
Grand Total 28600.00 sqm
say in 100 sqm 286.00 100 sqm
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3)
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
for maintenance as above 1 5% 4250.00 1.000 212.50
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
for maintenance as above 1 5% 3100.00 1.000 155.00
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
for maintenance as above 1 5% 3400.00 1.000 170.00
Grand Total 537.50 sqm
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3)
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
for maintenance as above 1 3% 4250.00 1.000 127.50
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
for maintenance as above 1 2% 3100.00 1.000 62.00
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
for maintenance as above 1 2% 3400.00 1.000 68.00
Grand Total 257.50 m
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3)
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Grand Total 201.56 Sqm 4292.67
5 Patching of Deep Potholes using WBM Gr Il & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3)
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
(2) M-Chandaragi-Gudagoppa-Sports school road from km 0.00 to 4.80
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Grand Total 526.88 Cum 3404.83 -2877.96
6 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003
(4)Mudenur-Salapur from km 0.00 to 10.22 and 12.20 to 14.16
for maintenance as above 1 5% 12160.00 1.000 608.00
(5)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
for maintenance as above 1 5% 4250.00 1.000 212.50
(9) Hanumasagar-Chunchanur-Benakatti road from km 0.00 to 6.38 and 6.56 to 10.78
for maintenance as above 1 5% 10600.00 1.000 530.00
(11)Chandaragi-Katkol road from km 0.00 to 5.74
for maintenance as above 1 5% 5740.00 1.000 287.00
(12) Budni-Yadwad road from km 0.75 to 1.90, 2.00 to 2.60 and 2.80 to 3.49
for maintenance as above 1 5% 2440.00 1.000 122.00
(15) M-Chandaragi-Gudagoppa-Sports school road from km 0.00 to 4.80
for maintenance as above 1 5% 4800.00 1.000 240.00
(16) Chippalaktti-Kunnal road from km 0.00 to 5.60
for maintenance as above 1 5% 5600.00 1.000 280.00
(19)K-Junipeth-Gonaganur-Basaragi road from km 0.00 to 7.80
for maintenance as above 1 5% 7800.00 1.000 390.00
(24) Hulkunda to Kalliguddi Taluka border road from km 0.00 to 3.34
for maintenance as above 1 5% 3340.00 1.000 167.00
(25) Totagatti to Chandaragi-Katkol link road from km 0.00 to 3.01
for maintenance as above 1 5% 3010.00 1.000 150.50
(26) Hosur-Chippalakatti-Tondikatti road from km 0.00 to 4.60
for maintenance as above 1 5% 4600.00 1.000 230.00
(27) Chikkopa KS to Hirekoppa KS-Mugalihal road from km 0.00 to 3.70
for maintenance as above 1 5% 3700.00 1.000 185.00
(29)Katkol-Korakoppa road from km 0.00 to 1.00 and 3.80 to 6.00 in Ramdurg Taluka
for maintenance as above 1 5% 3200.00 1.000 160.00
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
for maintenance as above 1 2% 4250.00 1.000 85.00
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
for maintenance as above 1 2% 3100.00 1.000 62.00
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
for maintenance as above 1 2% 3400.00 1.000 68.00
Grand Total 215.00 cum 1975.2
I) ROAD FURNITURE
1 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24]
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Grand Total 22.00 km
2 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24]
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Grand Total 11 km
3 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24]
(1)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
(2) M-Chandaragi-Gudagoppa-Sports school road from km 1.70 to 4.80
(3) Chippalaktti-Kunnal road from km 0.00 to 3.40
Name of Work:-2026-27 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆ ರಾಮದುರ್ಗ ತಾಲೂಕಿನ 1.ಯರಗಟ್ಟಿ ಬಬಲೇಶ್ವರ ರಾ.ಹೆ. 55 ರಿಂದ ಕುನ್ನಾಳ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 4.25 ರ ವರಗೆ ನಿರ್ವಹಣೆ 2 .ಎಂ. ಚಂದರಗಿ ಗುದಗೊಪ್ಪದಿಂದ ಕ್ರೀಡಾ ಶಾಲೆ ಕೂಡು ರಸ್ತೆ ಕಿ.ಮೀ 1.70 ರಿಂದ ಕಿ.ಮೀ 4.80 ರ ವರಗೆ ನಿರ್ವಹಣೆ 3.ಚಿಪ್ಪಲಕಟ್ಟಿ ಕುನ್ನಾಳ ರಸ್ತೆ ತಾಲೂಕಾ ಹದ್ದಿನ ವರೆಗೆ ಕಿ.ಮೀ 0.00 ರಿಂದ ಕಿ.ಮೀ 3.40 ರ ವರಗೆ ನಿರ್ವಹಣೆ ವರಗೆ ವಾರ್ಷೀಕ ನಿರ್ವಹಣೆ ಮಾಡುವದು.
S.No Description of items Unit UNI S.R.2021-22 (23-24) Rate as per S.R. Diff.in cost of Cement. Total Rate 18 perc GST Area weightage 0% Net Amount
P.No. Vol I.No . Const Diff.in cost Amount
I) ROAD MAINTENANCE
1 Clearing and Grubbing Road Land-Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Motor Grader- In area of light jungle (P.No. 9, I.No. 2.5a , Vol-3) 100 m2 9 3 2.5a 393.00 393.00 0.00 393.00
2 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Note: The earth stripped from earthen shoulders to be dumped on the side slopes locally for disposal (P.No. 91, I.No. 10.3, Vol-3) sqm 91 3 10.3 39.00 39.00 0.00 39.00
3 The maintenance of drains include erosion,repair,clearing,cleaning,reshaping,regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (P.No. 147, I.No. 16.19, Vol-3) m 147 3 16.19 6.00 6.00 0.00 6.00 The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. 135 20.20 3 4.55
4 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. (P.No. 93, I.No. 10.15(i), Vol-3) Sqm 93 3 10.15(i) 388.00 388.00 0.00 388.00
5 Patching of Deep Potholes using WBM Gr Il & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with Type-B Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.(P.No. 93, I.No. 10.15(ii), Vol-3) Sqm 93 3 10.15(ii) 635.00 635.00 0.00 635.00
6 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 cum 91 3 10.2 97.00 97.00 0.00 97.00
7 Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (ii) Grading-II (53 mm to 22.4 mm) (a) Using Screening Crushable type such as Moorum or Gravel Cum 26 3 4.13 2453.00 2453.00 0.00 2453.00
8 Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom-Tack coat on Bituminous surface (P.No. 43 I.No.5.32, Vol-3) sqm 43 3 5.32 12.00 12.00 0.00 12.00
9 Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (P.No. 43, I.No. 5.31. Vol-3) Cum 43 3 5.31 10152.00 10152.00 0.00 10152.00
II) ROAD FURNITURE
1 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Painting two coats with synthetic enamel paint.[I.No.16.24(i) / Page-148 of PWD SR (Vol. 3) 2023-24] km 148 3 16.24(i) 206.00 206.00 0.00 0.00 206.00
2 Maintenance of 200 m and km stones: Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade.[I.No.16.24(ii) / Page-148 of PWD SR (Vol. 3) 2023-24] km 148 3 16.24(ii) 1135.00 1135.00 0.00 0.00 1135.00 The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. 135 20.20 3 4.55
3 White washing of parapet walls of CD work and tree trunks: White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications..[I.No.-16.26/ Page- 148 of PWD SR (Vol. 3) 2023-24] Sqm 148 3 16.26 27.00 27.00 0.00 0.00 27.00
Assistant Executive Engineer Executive Engineer
PWD,Sub-Dn.,Ramdurg PWD, Div.Belgaum.
Name of the Road :- YARAGATTI BABALESHWAR SH-55 TO JOIN KUNNAL ROAD (MDR)(RIS ID-RMG24)
Road Category: MDR Sub Division : RAMDURG Division : BELGAVI Circle : DHARWAD
Long 75.1762 Long 75.1365
Kunnal Cross Kunnal Village
5.50 m 5054-2022-23 MDR (WI 153152), PQC M30 150mm, WMM 75mm GSB 100mm,
Carriage Way (WI :153152), 5054-2022-23, GSB 100mm, WMM 225mm, BM 50mm, SDBC 25mm
Last 5 Year development length 2026-27 Last 5 Year development length 2026-27
Structure Chainage
Legends Desciption Silent Features 3).Proposed works under Annual Works 2025-26 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Works Under Annual Plan 2026-27 Single Lane 0.00 to 3.60 3.60 APPENDIX-E 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 0.00 3.60 Maint 3.60 Kunnal 3.60 5.00 1.40
Last 5 Year development length 2026-27 Intermediate lane 3.60 to 4.25 0.65 0.00 0.00 RC 0.00 Last 5 Year development length 2024-25 3.60 4.25 Maint 0.65 Name 2 9.600 9.800 0.200
Work Approved / progress 2026-27 Two lane 0 0.00 0.00 0.00 CC Road 0.00 Name 3 0.00 0.00 0.00
NFL Two lane + PS 0 0.00 Total Length (in Km) 0.00 Total Length (in Km) 4.25 Name 4 0.00 0.00 0.00
Major Bridges Four lane 0 0.00 4). On going works 1). Completed Works and under DLP Name 5 0.00 0.00 0.00
Minor Bridges Major Bridges 0 0 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name 6 0.00 0.00 0.00
CD Minor Bridges 0 0 SCP 0.00 0.00 Wd 0.00 0.00 0.00 RC 0.00 Total Length (in Km) 1.60
Village/ City Name Railway Crossing 0 0 0.00 0.00 RC 0.00 0.00 0.00 0.00
Railway Crossing Overlap Length 0 0.00 0.00 0.00 CC Road 0.00 0.00 0.00 0.00
Total Length (in Km) 4.25 Total Length (in Km) 0.00 0.00 0.00 0.00
2026-27 Maintenance Abstract 5). Eligible for Renewal Total Length (in Km) 0.00
Description Length in KM HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Last 5 Year development length 4.25 APPENDIX-E Renewal 0.00 0.00 Ren 0.00 No. Details Length Other Department Works
1 1). Completed Works and under DLP 0.00 Under From To L (in Km)
More than 5 Year development length 0 2 2).Maintenance for 2026-27 4.25 KRDCL 0.00
3 3).Proposed works under Annual Works 2025-26 0.00 KSHIP 0.00
Total Maintenance Length 4.25 4 4). On going works 0.00 SHDP 0.00
5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total length of the road 4.25 Total Length (in Km) 4.25
Name of the Road :-CHIPPALAKATTI - KUNNAL (MDR) (RIS ID-RMG214)
Road Category: MDR Sub Division : RAMDURG Division : BELGAVI Circle : DHARWAD
CHIPPALKATTI KUNNAL
3.75 m Exist CW
Carriage Way (WI-151818) IMPR - 5054 FOR THE YEAR 2021-22 SUBGRADE -150mm,GSB-150mm,WMM-225mm-BM-50mm,SDBC-25mm (WI:18003) Ongoing appendix e For the year 2024-25 GSB 150,WMM250,BM50,SDBC30 mm
LAST 5 YEAR DEVELOPMENT LENGTH for the year 2026-27 (WI:18003) Ongoing under appendix e For the year 2024-25
Chainage L= 3.40 L= 2.20
Structure Chainage
Legends Desciption Silent Features 3).Proposed works under Annual Works 2025-26 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Works Under Annual Plan 2026-27 Single Lane 0.00 to 5.60 5.60 APPENDIX-E 0.00 0.00 RC 0.00 LAST 5 YEAR DEVELOPMENT LENGTH 2024-25 0.00 3.40 Maint 3.40 chipalkatti 0.00 0.50 0.50
Last 5 Year development length Intermediate lane 0 0.00 0.00 0.00 RC 0.00 Non Feasible 0.00 0.00 Maint 0.00 Kuunal 3.250 3.750 0.500
Work Approved / progress 2026-27 Two lane 0 0.00 0.00 0.00 CC Road 0.00 0.00 0.00 Maint 0.00 Name 3 0.00
NFL Two lane + PS 0 0.00 Total Length (in Km) 0.00 Total Length (in Km) 3.40 Name 4 0.00
Major Bridges Four lane 0 0.00 4). On going works 1). Completed Works and under DLP Name 5 0.00
Minor Bridges Major Bridges 0 0 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name 6 0.00
CD Minor Bridges 2 Nos (1.35, 2.22 Km) 0 SCP 3.40 5.60 Wd 2.20 5054-MDR 0.00 0.00 RC 0.00 Total Length (in Km) 1.00
Village/ City Name Railway Crossing 0 0 0.00 0.00 RC 0.00 0.00 0.00 ST 0.00
Railway Crossing Overlap Length 0 0.00 0.00 0.00 CC Road 0.00 0.00 0.00 Ren 0.00
Total Length (in Km) 5.60 Total Length (in Km) 2.20 0.00 0.00 Wd 0.00
2026-27 Maintenance Abstract 5). Eligible for Renewal Total Length (in Km) 0.00
Description Length in KM HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Last 5 Year development length 3.40 APPENDIX-E Renewal 0.00 0.00 Ren 0.00 No. Details Length Other Department Works
1 1). Completed Works and under DLP 0.00 Under From To L (in Km)
More than 5 Year development length 0.00 2 2).Maintenance for 2026-27 3.40 KRDCL 0.00
3 3).Proposed works under Annual Works 2025-26 0.00 KSHIP 0.00
Total Maintenance Length 3.40 4 4). On going works 2.20 SHDP 0.00
5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total length of the road 5.60 Total Length (in Km) 5.60
Name of the Road :-M. CHANDARAGI - GUDAGOPPA (RIS ID-RMG212)
Road Category: MDR Sub Division : RAMDURG Division : BELGAVI Circle : DHARWAD
SH-20 M.CHANDARGI GUDAGOPPA SH-20
3.75 m Exist CW
5.50 m CMIDP 2025-26 Wi:31030 BM+SDBC=75mm CMIDP 2025-26 Wi:31030 gsb:100,Wmm:150,PQC:200mm
Carriage Way CMIDP 2025-26 Wi:31030 WMM:150mm BM+SDBC=75mm CMIDP 2025-26 Wi:31030 Wmm:150,BM+SDBC=75mm (WI111781)-3054 - 2021-22 GSB 200 Wmm225mm, BM 50mm, SDBC 25mm Under CMGRY
CMIDP 2025-26 Wi:31030 CMIDP 2025-26 Wi:31030 CMIDP 2025-26 Wi:31030 CMIDP 2025-26 Wi:31030 More than 5 Year development length for the year 2026-27
Structure Chainage
Legends Desciption Silent Features 3).Proposed works under Annual Works 2025-26 2).Maintenance for 2026-27 Village/City Limit
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name of Village/ City From To L (in Km)
Works Under Annual Plan 2025-26 Single Lane 0.00 to 4.8 4.20 CMIDP 2025-26 0.00 1.70 RC 1.70 More than 5 years Maintenance Work 1.70 4.80 Maint 3.10 M Chandaragi 0.60 0.75 0.15
Last 5 Year development length Intermediate lane 0 0.60 0.00 0.00 RC 0.00 Maint 0.00 Gudagoppa 2.00 2.20 0.200
Work Approved / progress 2025-26 Two lane 0 0.00 0.00 0.00 CC Road 0.00 Maint 0.00 Name 3 0.00
NFL Two lane + PS 0 0.00 Total Length (in Km) 1.70 Total Length (in Km) 3.10 Name 4 0.00
Major Bridges Four lane 0 0.00 4). On going works 1). Completed Works and under DLP Name 5 0.00
Minor Bridges Major Bridges 0 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Name 6 0.00
CD Minor Bridges 1 No (1.69 Km) SCP 0.00 0.00 Wd 0.00 0.00 0.00 RC 0.00 Total Length (in Km) 0.35
Village/ City Name Railway Crossing 0 0.00 0.00 RC 0.00 0.00 0.00 ST 0.00
Railway Crossing Overlap Length 0 0.00 0.00 0.00 CC Road 0.00 0.00 0.00 Ren 0.00
Total Length (in Km) 4.80 Total Length (in Km) 0.00 0.00 0.00 Wd 0.00
2026-27 Maintenance Abstract 5). Eligible for Renewal Total Length (in Km) 0.00
Description Length in KM HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Last 5 Year development length 0.00 APPENDIX-E Renewal 0.00 0.00 Ren 0.00 No. Details Length Other Department Works
1 1). Completed Works and under DLP 0.00 Under From To L (in Km)
More than 5 Year development length 3.10 2 2).Maintenance for 2026-27 3.10 KRDCL 0.00
3 3).Proposed works under Annual Works 2025-26 1.70 KSHIP 0.00
Total Maintenance Length 3.10 4 4). On going works 0.00 SHDP 0.00
5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total length of the road 4.80 Total Length (in Km) 4.80
CAzÁdÄ:¥ÀwæPÉUÀ¼À CqÀ½vÁvÀäPÀ/vÁAwæPÀ ªÀÄAdÆgÁw gÀ¸ÉÛ PÁªÀÄUÁjAiÀÄ ¥Àj²Ã®£Á ZÉPï °¸ïÖ.
1 PÁªÀÄUÁjAiÀÄ ºÉ¸ÀgÀÄ. 2021-22 £Éà ¸Á°£À ¯ÉPÀ̲öðPÉ 3054 gÁ.ºÉ. ¤ªÀðºÀuÉ Cr gÁªÀÄzÀÄUÀð vÁ®ÆQ£À ¨ÁzÁ«Ä UÉÆqÀa UÉÆÃPÁPÀ ¥sÁ¯ïì gÀ¸ÉÛ (gÁ.ºÉ-134) Q.«Ä.33.75 jAzÀ 50.10, Q.«Ä 52.60 jAzÀ 58.14, 58.97 jAzÀ 65.44, Q.«Ä. 65.81 jAzÀ 71.26, Q.«Ä 74.35 jAzÀ 74.59 & Q.«ÄÃ. 76.17 jAzÀ 78.10 gÀªÀgÉUÉ gÀ¸ÉÛAiÀÄ ªÁ¶ðPÀ ¤ªÀðºÀuÉ ªÀiÁqÀĪÀÅzÀÄ.
2 ¯ÉPÀÌ ²Ã¶ðPÉ 3054-SH MAINTENANCE (NON-PLAN)
3 C£ÀÄªÉÆzÀvÀ QæÃAiÀiÁAiÉÆÃd£É ¥ÀvÀæ ¸ÀA.ªÀÄvÀÄÛ ¢. ¥ÀÄl ¸ÀA.& PÀæªÀÄ.¸ÀA PÀæªÀÄ.¸ÀA.
4 CAzÁdÄ ªÉÆvÀÛ 32.00 Lakhs
5 ¥Àæ¸ÀÛPÀ ¸Á°£À C£ÀÄzÁ£À 32.00 Lakhs
6 C£ÀÄªÉÆÃ¢vÀ ZÉÊ£ÉÃeï Q.«Ä.33.75 jAzÀ 50.10, Q.«Ä 52.60 jAzÀ 58.14, 58.97 jAzÀ 65.44, Q.«Ä. 65.81 jAzÀ 71.26, Q.«Ä 74.35 jAzÀ 74.59 & Q.«ÄÃ. 76.17 jAzÀ 78.10 gÀªÀgÉUÉ
7 ¥Àæ¸ÁÛ¦vÀ ZÉÊ£ÉÃeï Q.«Ä.33.75 jAzÀ 50.10, Q.«Ä 52.60 jAzÀ 58.14, 58.97 jAzÀ 65.44, Q.«Ä. 65.81 jAzÀ 71.26, Q.«Ä 74.35 jAzÀ 74.59 & Q.«ÄÃ. 76.17 jAzÀ 78.10 gÀªÀgÉUÉ
8 ºÁ° gÀ¸ÉÛAiÀÄ ¹Üw BT Surface
9 gÀ¸ÉÛAiÀÄ ªÀVÃPÀgÀt SH
10 Formation width whether it is as per IRC standard:Yes/ No (MDR -9.00m,SH-12.00m) Yes
11 CD's width whether it is as per IRC standard:Yes/ No (MDR-9.00 m,SH-12.00m) Yes
12 r¸ÉÊ£ï C¼ÀªÀr¹zÀ «zsÀ Not Applicable
13 ¹.©.Cgï.mɸÀÖ j¥ÉÆÃlð Not Applicable
14 ªÁºÀ£À ¸ÁAzÀævÉAiÀÄ «ªÀgÀ Not Applicable
15 r¸ÉÊ£ï ¥ÀæPÁgÀ gÀ¸ÉÛAiÀÄ ««zsÀ ¨sÁUÀUÀ¼À «ªÀgÀ Not Applicable
16 CAzÁf£À°è ¥ÀjUÀt¹zÀ gÀ¸ÀÛAiÀÄ «ªÀgÀ Not Applicable
17 ¨ÁgÀ ZÁlð: »A¢£À : ªÀµÀð UÀ¼À°è ¥ÀjUÀt¹zÀ ZÉÊ£Éãeï «ªÀgÀ ¯ÉPÀÌ ²Ã¶ðPɪÁgÀÄ. Enclosed
18 ºÁ° gÀ¸ÉÛAiÀÄ PÁæ¸ï ºÁUÀÆ ¥ÀjUÀt¹zÀ gÀ¸ÀÛAiÀÄ ¸ÉPÀë£ï Enclosed
19 vÁ®ÆPÁ £ÀPÀë Enclosed
20 CAzÁf£À°è ¥ÀjUÀt¹zÀ CA±ÀUÀ¼ÀÄ:-
I) Road Maintainance 1)Sub grade 2) deep pot holes 3) Shallow Pot holes 4) Jungle Clearance 5) Selected reaches SDBC II) CD Repairs 1) UCRS 2) Flush pointing 3) Coping III) Road Furnitures 1) Painting 2) lettering 3) white washing 4) Retro-Refectrorised Traffic Signs 5)Road marking 6) Road stud 7) Place identification Sign 8)Crash Barrier
Assistant Executive Engineer Executive Engineer
PWD, Sub-Div.Ramdurg PWD Division Belgavi.
Name Q.«Ä.33.75 jAzÀ 50.10, Q.«Ä 52.60 jAzÀ 58.14, 58.97 jAzÀ 65.44, Q.«Ä. 65.81 jAzÀ 71.26, Q.«Ä 74.35 jAzÀ 74.59 & Q.«ÄÃ. 76.17 jAzÀ 78.10 gÀªÀgÉUÉ gÀ¸ÉÛAiÀÄ ªÁ¶ðPÀ ¤ªÀðºÀuÉ ªÀiÁqÀĪÀÅzÀÄ.
GD 1 ¸ÀzÀj gÀ¸ÉÛ ¤ªÀðºÀuÉ ªÀiÁqÀĪÀ PÁªÀÄUÁjUÁV 2021 - 22£Éà ¸Á°UÁV ¹zÀÞ¥Àr¹zÀ QæAiÀiÁ AiÉÆÃd£É PÀæ.¸ÀA. gÀ£ÀéAiÀÄ MlÄÖ ªÉÆvÀÛ gÀÆ.
GD 2 ®PÀë ¯ÉPÀÌ ²Ã¶ðPÉ 3054 AiÉÆÃd£ÉÃvÀgÀ CrAiÀİè C£ÀĪÀÅ EgÀÄvÀÛzÉ. Cwà ¨sÁgÀzÀ ºÁUÀÆ EvÀgÀ ªÁtÂdå ªÁºÀ£À ¸ÀAZÁgÀ¢AzÀ ªÀÄvÀÄÛ ªÀļɬÄAzÁV gÀ¸ÉÛAiÀÄ ªÉÄïÉäöÊ ªÉÄÃ¯É ¸ÁPÀµÀÄÖ vÀUÀÄÎ UÀÄArUÀ¼ÀÄ ©Ã¼ÀÄvÀÛªÉ.PÁgÀt Cwà dgÀÆgÀ EgÀĪÀ ªÁ¶ðPÀ ¤ªÀðºÀuÉAiÀÄ£ÀÄß ªÀiÁqÀĪÀ zÀÄ CªÀ±ÀåPÀ«gÀÄvÀÛzÉ. PÀ¼ÉzÀ ¸Á°£À°è ¸ÀÄzsÁgÀuÉ/£À«ÃPÀgÀt ªÀiÁrzÀ gÀ¸ÉÛ ¨sÁUÀUÀ¼À£ÀÄß ºÉÆgÀvÀÄ ¥Àr¹ E£ÀÆß½zÀ gÀ¸ÉÛ ¨sÁUÀzÀ ªÁ¶ðPÀ ¤ªÀðºÀuÉAiÀÄ£ÀÄß ªÀÄvÀÄÛ CqÀØªÉÆÃjUÀ¼À zÀÄgÀ¹Û PÁªÀÄUÁjUÀ¼À£ÀÄß PÉÊUÉwÛPÉÆ¼Àî¯ÁVzÉ
GD 4 F CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ ¯ÉÆÃ.§A.ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ, ¨É¼ÀUÁ« ªÀÈvÀÛ, ¨É¼ÀUÁ« EªÀgÀ 2018-19£Éà ¸Á°£À zÀgÀ ¥ÀnÖAiÀÄAvÉ gÁªÀÄzÀÄUÀð vÁ®ÆQUÉ s¸ÀPÀÌgÉ PÁSÁð£ÉUÉ ±ÉÃPÀqï 5% gÀ ºÉZÀÄѪÀj zÀgÀUÀ¼ÉÆA¢UÉ F CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß ¤UÀ¢ü¥Àr¹zÀ MlÄÖ ªÉÆvÀÛ gÀÆ.
GD 5 ®PÀëUÀ½UÉ vÀAiÀiÁj¹ ªÀÄAdÆgÁwUÁV DzÀgÀ¥ÀƪÀðPÀªÁV ¸À°è¸À¯ÁVzÉ.
(1) Narasaur to SH-134 link road from km 0.00 to 3.84
For Maintenance Length 0.00 3.84 3.84 More than 5 years
Total Maintenance Length 3.84
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.84
(2) Ramdurg-Bochbal from km 0.00 to 2.7,2.90 to12.00 and 14.10 to 18.48
For Maintenance Length 0.000 2.700 2.70 less than 5 yrs
2.700 2.900 0.20 more than 5 yrs
2.900 8.615 5.72 less than 5 yrs
8.615 12.000 3.39 more than 5 yrs
14.100 15.080 0.98 more than 5 yrs
15.080 17.320 2.24 less than 5 yrs
17.320 18.480 1.16 more than 5 yrs
Total Maintenance Length 16.38
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00 0.00 0.00
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 12.00 14.10 2.10
Total length of road 18.48
(4)Mudenur-Salapur from km 0.00 to 10.22 and 12.20 to 14.16
For Maintenance Length 0.00 2.73 2.73 less than 5 years
0.00 0.00 0.00 more than 5 years
Total Maintenance Length 12.16
Overlap Length 0.00 0.00 0.00
Total NFL length 0.00
Total DLP length
ongoing work 0.00 0.00 0.00
Total length of road 12.16
(5)Yaragatti-Bableshwar SH-55 to Kunnal link road from km 0.00 to 4.25
For Maintenance Length 0.000 0.000 0.000 More than 5 years
0.000 3.600 3.600 less than 5 years
Total Maintenance Length 4.250
Overlap Length 0.000 0.000 0.000
Total NFL length 0.00 0.00 0.00
Total DLP length 0.000 0.000 0.000
ongoing work 0.00 0.00 0.00
Total length of road 4.25
(9) Hanumasagar-Chunchanur-Benakatti road from km 0.00 to 6.38 and 6.56 to 10.78
For Maintenance Length 0.000 0.400 0.400 More than 5 years
0.400 1.800 1.400 less than 5 years
Total Maintenance Length 10.600
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 10.60
(11)Chandaragi-Katkol road from km 0.00 to 5.74
For Maintenance Length 0.00 5.74 5.74 more than 5 yrs
Total Maintenance Length 5.74
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 5.74
(12) Budni-Yadwad road from km 0.75 to 1.90, 2.00 to 2.60 and 2.80 to 3.49
For Maintenance Length 0.75 1.90 1.15 more than 5 yrs
Total Maintenance Length 2.44
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 2.44
(15) M-Chandaragi-Gudagoppa-Sports school road from km 0.00 to 4.80
For Maintenance Length 0.00 1.70 1.70 more than 5 yrs
1.70 4.80 3.10 less than 5 yrs
Total Maintenance Length 4.80
Overlap Length 0.00
Total NFL length 0.00 0.00
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 4.80
(16) Chippalaktti-Kunnal road from km 0.00 to 5.60
For Maintenance Length 0.00 3.25 3.25 less 5 yrs
3.25 5.60 2.35 more than 5 yrs
Total Maintenance Length 5.60
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 5.60
(19)K-Junipeth-Gonaganur-Basaragi road from km 0.00 to 7.80
For Maintenance Length 0.00 1.00 1.00 less 5 yrs
1.00 7.80 6.80 more than 5 yrs
Total Maintenance Length 7.80
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 7.80
(24) Hulkunda to Kalliguddi Taluka border road from km 0.00 to 3.34
For Maintenance Length 0.00 3.34 3.34 more than 5 yrs
Total Maintenance Length 3.34
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.34
(25) Totagatti to Chandaragi-Katkol link road from km 0.00 to 3.01
For Maintenance Length 0.00 3.01 3.01 less than 5 yrs
Total Maintenance Length 3.01
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.01
(26) Hosur-Chippalakatti-Tondikatti road from km 0.00 to 4.60
For Maintenance Length 0.00 1.00 1.00 more than 5 yrs
1.00 4.60 3.60 more than 5 yrs
Total Maintenance Length 4.60
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 4.60
(27) Chikkopa KS to Hirekoppa KS-Mugalihal road from km 0.00 to 3.70
For Maintenance Length 0.00 3.70 3.70 more than 5 yrs
Total Maintenance Length 3.70
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.70
(29)Katkol-Korakoppa road from km 0.00 to 1.00 and 3.80 to 6.00 in Ramdurg Taluka
For Maintenance Length 0.00 1.00 1.00 more than 5 yrs
3.80 6.00 2.20 more than 5 yrs
Total Maintenance Length 3.20
Overlap Length 0.00
Total NFL length 40.30 50.10
Total DLP length 0.00 0.00 0.00
Appendix E ongoing work 0.00
Total length of road 3.20
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Formats and govt GOs.zip
Others - Formats and govt GOs.zip • 20.38 MB
3054 mdr program 2026-27.pdf
Others - 3054 mdr program 2026-27.pdf • 0.66 MB
2026-27 Package.xlsx
Others - 2026-27 Package.xlsx • 0.21 MB
42387 BID DOC SC KW-1.doc
Tender Document • 1.61 MB
Approved Programme Copy.pdf
Others - Approved Programme Copy.pdf • 1.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .