Chief General Manager (Thermal)
SLPP 4X125 MW Unit I to IV Biennial contract for PACKAGE-I Monitoring & Maintenance services for Sewage Treatment & Recycling Plant at SLPP-Colony and PACKAGE-II Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises (Year: 2026-28).
314313
SLPP/Civil/ STP & ETP/2026-28
Open
Civil - Treatment Plant
Surat
₹2,950
Gujarat Industries Power Company Limited.
₹53,000
17 Jun 2026
17 Jun 2026
17 Jun 2026
7 Jul 2026
17 Jun 2026
against item descriptions in SoR (Schedule of Rate)
cum BOQ (Section-E).
Contract period Two Years from the date as mentioned in order.
EMD Rs. 53,000/- (Rupees Fifty Three Thousand only) by
Demand Draft payable at Mosali-Surat/Nani
Naroli/Surat or irrecoverable Bank Guarantee in favor
of GIPCL from approved Banks mentioned in this
tender or through RTGS/NEFT or through online
payment gateway of company’s website:
www.gipcl.com (online Payment Form) as per details
mentioned herein under clause no. 07 of Instructions to
Tender Fee Rs.2,950/- (Rupees Two Thousand Nine Hundred fifty
only) Non-refundable, inclusive of applicable GST
through RTGS or through online payment gateway
from website: www.gipcl.com as per details mentioned
herein under clause no. 07 of Instructions to Bidders.
Site visit at GIPCL (Surat Lignite Power Plant), Village:
Nani Naroli, Taluka- Mangrol, Dist. Surat (Gujarat)
before submission of bid as per details mentioned
hereinunder in clause no. 4 of Instructions to Bidders
Availability of online e-Tender On website: https://tender.nprocure.com or
document https://gipcltender.nprocure.com
Last date of online submission of Through website: https://tender.nprocure.com or
offer https://gipcltender.nprocure.com up to 07.07.2026,
Submission of EMD, Tender fee On or before 07.07.2026, 17:30 hrs. during working
RTGS detail and other supporting days at office of Surat Lignite Power Plant, Nani Naroli,
documents for technical Bid in Dist. Surat, PIN: 394110 (Gujarat)
E-Reverse Auction E-Reverse Auction will be executed through website:
https://e-auction.nprocure.com (Schedule will be
intimated later on to eligible bidders).
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
1. Amendment / corrigendum of the tender document, forms, schedules, etc... may be
done any time by the GIPCL during the period of publication of tender in the website.
The Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders without assigning any
reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and conditions
mentioned in the tender document, adhering to technical specifications as well.
4. The Bidders are required to submit their Bids online only through the website
https://tender.nprocure.com or https://gipcltender.nprocure.com. (E-Tender No.:
5. EMD either in physical form by way of DD/BG or copies of payment receipts of EMD
and Tender fee paid through RTGS/online along with other supporting documents
are to be submitted in physical form in sealed cover/envelop at the following address
on or before date & time mentioned above in NIT. At the top of envelop, tender
notice no.: SLPP/Civil/ STP & ETP/2026-28 should be mentioned.
6. Bidders are advised to upload the tender well in advance to avoid delay in
submission of tenders due to n-procure site related issues. In case of any issues
/difficulties cropping up during on line uploading / submission of documents, bidders
are requested to inform these well in advance (at least two days before closing of
tender) to (n) Code Solutions as mentioned in Section-B of tender and as well as to
GIPCL mail to [email protected]
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited
Surat Lignite Power Plant
At Village: Nani Naroli,
Taluka: Mangrol,
Dist.:Surat-394 110, Gujarat.
Phone: (02629) 261063-72. E-Mail: [email protected]
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named
Company/GIPCL), is a Premier Power Utility in the State of Gujarat with an installed
capacity of 1364.40 MW comprising of various conventional and renewable projects.
GIPCL commissioned its first power project; a 145 MW gas based combined cycle
power plant in year 1992 at Vadodara. It expanded its capacity 165 MW Naptha &
gas based Combined Cycle Power Plant at Vadodara in year
Surat Lignite Power Plant (SLPP) with four units of 125 MW installed capacity each
is located at Village: Nani Naroli, Taluka: Mangrol, District: Surat in Gujarat. GIPCL
has also operating its own captive Lignite and Lime Stone Mines close to the Power
Plant. The Power Plant is based on Circulating Fluidized Bed Combustion (CFBC)
technology for the Boilers, where Lignite is burnt along with Lime Stone in the
Combustor of the Boiler. It also commissioned 05 MW solar power station at SLPP in
GIPCL has successfully commissioned 442 MW Solar Generating Capacity spread
across various locations in Gujarat and 112.40 MW Wind Generating Capacity in the
Saurashtra & Kutch region of Gujarat.
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba,
which are on Mumbai-Ahmadabad highway. From Kosamba, SLPP is around 32 KM,
out of which 27 KM is part of the National & State Highway and balance 5 KM is
District Road. From Kim, SLPP is around 18 KM, out of which 13 KM is the State
Highway and balance 5 KM is District Road. The nearest Broad Gauge Railway Line
is at Kim, which is around 21 KM from the SLPP. Surat is approximately 50 KM from
the SLPP. Location Map for SLPP is as
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
The Company intends to award Biennial Maintenance Contract (BMC) for Monitoring
& Maintenance services for STP and Recycling Plant at colony & Monitoring services
for PT, ETP & Run Off Pond System at DM Plant in Plant premises for two Years of
contract period at SLPP-Plant & SLPP-Colony and is therefore inviting open tenders
online (n-procure web site) from experienced & resourceful contractors.
2. SCOPE OF WORK
The scope of work covered in general comprises of following packages.
PACKAGE-l: Monitoring & Maintenance services for sewage treatment & Recycling
plant at colony.
PACKAGE-II: Monitoring services for PT, ETP & Run Off System at DM Plant.
2.1 Details of each package as under:-
Package I : Monitoring & Maintenance services for sewage treatment & Recycling
plant at colony. The scope of work also including :-
a. Routine Monitoring of sewage treatment plant with deploying minimum one
skilled person having Mechanical and Electrical background / experience in
General shift and one unskilled persons for shift on monthly basis for
operating the plant. The scope of work and quoted rate also includes
deployment of extra manpower during weekly off day/ absence of available
manpower. Further, the scope of work and quoted rate also includes
deployment of additional manpower (minimum one skilled person having
Mechanical and Electrical background / experience in General shift and one
unskilled persons for shift and required additional person for round the clock
working (All three shifts) for operation of STP plant during monsoon period of
three months. The quoted rate includes deputation of additional manpower
during monsoon season for three shifts working and also deputation of
manpower during weekly off/absence of available manpower without
additional financial implication to GIPCL for payment to additional manpower
or for overtime of existing manpower for smooth operation of STP.
b. GIPCL will also deployed one unskilled manpower in shift duty for operation
of STP plant in colony. The payment of said person shall be given by GIPCL
directly. However, in absence of GIPCL deployed manpower, contractor have
to arrange manpower in shift for operation of STP plant. The quoted rate also
includes deployment of extra manpower or over time of existing manpower
during weekly off day/ absence of GIPCL manpower.
c. Unit Monitoring shall include of raw sewage pumps, aeration tank with
surface aerator, clarifier with mechanism and sludge pumps, carbon and
pressure filters with treated effluent pumps and chlorination with hypochlorite
solution and submission of daily report thereof.
d. Contractor shall carry out testing of samples twice in a month for PH,
COD,BOD,TSS,Total Nitrogen,Fecal Coliform, Residue chlorine and
submission of reports thereof. Contractor shall visit twice in a month & submit
visit report with status of each equipment & line of action for smooth
operation & maintenance of STP.
e. The scope of work for maintenance services for sewage treatment &
Recycling plant at colony includes supply of all spares like bearings pump
parts (mechanical parts), nuts and bolts and consumable including kerosene,
HYPOCHLORITE solution etc shall be in the contractor scope of work. All
required tools, tackles, jutes and other misc things required for maintenance
work shall be arranged by contractor. The scope of work and quoted rate
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
shall also include supply Hypochlorite solution required for daily
chlorination (Minimum 10 Litre/day) and maintaining enough stock of
this material at site. The scope of work also included supply of require
quantity of GUD, UREA & DAP as directive and requirement given by
Engineer in charge.
f. The scope of work shall also include monitoring of the distribution networks
of recycled water to the connected houses, garden area, cricket ground area
by operating respective valves and checking the flows of water, monitoring of
leakages at each place by engaging one person for the same. The scope of
work includes monitor leakages of recycling pipes and attending the same
immediately as per item nomenclature of schedule of price enclosed
g. Contractor shall carry out repairing of breakdown equipments immediately.
For repairing of equipments transportation shall be arrange by GIPCL
free of cost. For lifting of pump hydra shall be provided by GIPCL Free
h. The scope of work for preventive maintenance of equipment shall be as per
Section-II & as per directive and instruction of Engineer in charge by
engaging separate skilled manpower and required tools, tackles, equipments,
consumables. The contractor shall arrange required skill manpower (fitter,
welder, Forman, workers) and required tools, tackles, equipments,
consumables for preventive maintenance (as per specified frequency) and
breakdown maintenance of all the equipment, piping, valves, filter, filter
media and other all associated works for smooth operation of STP and also
submit detailed report of preventative maintenance. Payments shall be done
after satisfactory preventive & breakdown maintenance, joint record (duly
signed by contractor & GIPCL engineer) and verification of engineer in
Package II : Monitoring services for PT, ETP & Run Off System at DM Plant. The
scope of work also including below points :-
a. Routine Monitoring of water treatment plant, effluent treatment plant, runoff
clarifier and water recovery pit pump with deploying eight person (one site in-
charge + 03 operators + 04 helpers) having chemical background with/
experience of ETP on monthly basis for operating the plant.
b. The scope of work for Monitoring shall include of two water treatment clarifier
and related all auxiliaries, Effluent treatment plant and related all auxiliaries,
all recovery pits and pumps, two numbers of thickeners, three numbers of
centrifuge and related auxillaries, Run off pond clarifier and related auxiliaries
and preparation of all process related chemicals as well as shifting of process
related chemicals from chemical house to dosing tank.
c. Contractor shall carry out testing of samples on hourly basis for ETP and
runoff clarifier at GIPCL lab and recorded at site.
d. Contractor shall have to remain present during the visit of any authority from
GPCB, CPCB & MOEF for joint sampling and clarification if required.
e. The following tests / reports are required to be submitted every 15 days for
the treated water:- (I) BOD (ii) COD (iii) PH value (IV) Suspended solids (v)
Oil & Grease (VI) Total Disssolved Solids (TDS).
2.2 The bid submitted by the bidder not covering the total scope of work and services
as detailed out in the tender document shall be liable for rejection.
2.3 Quantum of job mentioned against all items in the price bid are indicative only &
may vary as per site requirement & not to be construed as maximum or
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
guaranteed quantity. The quantities shown in the price bid are approximate
quantities for the contract period and they may vary as per job requirements.
2.4 All the miscellaneous activities pertaining to specific work to be executed for
satisfactory performance is in the scope of contractor in his quoted rates.
3. GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read and
comply with the instructions and the Terms & Conditions contained in the
tender documents.
3.2 The Bids shall be filled in by the Bidders clearly, neatly and accurately. Any
alteration, erasures or overwriting shall be liable to make the tender invalid
unless the same is neatly carried out and attested over the full signature of
Bidder. The decision of the Company to interpret the information and rates
filled in by the Bidder shall be final and binding on the Bidder.
3.3 The Bidders are requested to make themselves fully conversant with the
General Conditions of Contract, Special Conditions of Contract, Technical
Specifications, Site conditions, Safety & Health Aspects and Norms to be
observed etc. before submitting their bids so that no ambiguity arises in these
respects subsequent to submission of the Bids.
3.4 Before quoting the bid, the Bidder must visit site and should go through the
specifications, scope of work etc. and get himself/herself fully conversant with
them. The Bid should include cost of mobilization & demobilization and cost to
adhere to all Safety Norms, legal & statutory requirements, etc… as described
in the tender. No relaxation or request for revision of quoted/accepted rates
shall be entertained subsequent to the opening of Bid or during contract
period on account of mobilization or Safety costs or other costs or rate hikes
whatsoever and contractor should complete the entire scope of work with due
diligence without demanding any escalation in final accepted rates / work
3.5 Bidder has to submit all the information as per required Bid document. Failure
to furnish all the information as per required Bid documents or submission of a
Bid containing deviations from the contractual terms and conditions,
specifications and requirements, shall be rejected.
3.6 The Bids shall be submitted within the time frames set out in the Notice
Inviting Tender (‘NIT’) and Bids submitted thereafter shall not be accepted and
3.7 The tender documents shall not be transferable.
3.8 The Bidders are expected to examine all instructions, forms, terms &
specifications in the Bid documents and to get fully acquainted themselves
with all the conditions and matters which may affect the subject matter of the
work/tender or the cost thereof. If any Bidder finds any discrepancies or
omissions in the specifications and documents or any doubt in true meaning
or interpretation of any part, he shall seek necessary clarifications in writing or
during Pre-Bid meeting if required.
3.9 Conditional offers shall not be considered and liable to be rejected.
3.10 The Company reserves the right to extend the deadlines for submission of the
Bids by giving amendments.
3.11 During evaluation of Bids the Company may, at its discretion ask the Bidder
(s) for clarification of their Bid. The request for clarification and the response
shall be in writing and no change in prices or substance of the Bid shall be
sought, offered or permitted.
3.12 The Company reserves the right to amend/ modify the Bidding documents at
any time prior to the deadline for submission of Bids, either at its own
discretion or in response to the clarification requested by a prospective Bidder.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
In such case, the Company may in its discretion extend the deadline for
submission of Bids in order to facilitate the prospective Bidders for
incorporating the effect of the amendment in their Bids.
3.13 The Bidders shall bear all costs and expenses associated with the preparation
and submission of their respective Bids, to attend meetings or conferences, if
any, including any pre award discussion with the successful Bidder, technical
and other presentations etc. and the Company shall not be liable for any
expense thereof.
3.14 If the successful Bidder is a joint venture, formed of two or more companies,
the Bidder along with the partners shall accept joint and several
responsibilities and liabilities for all obligations under the Contract.
3.15 Timely and satisfactory completion of the work and strict adherence to the
allotted time frames for jobs shall be the essence of the contract.
3.16 The Company reserves the right to qualify/disqualify any applicant without
assigning any reason.
3.17 The Bidder shall be disqualified if any untrue statement or misrepresentation
is made in the Bid forms, attachments and other supporting documents
submitted by the Bidder.
4. PLANT & COLONY/ SITE VISIT
It is perquisite and necessary for all interested bidders to visit the Surat Lignite
Power Plant (SLPP) after downloading the tender to understand the actual working
conditions, compliance related to labour, safety etc… before submitting their offer.
Failing which, any consequential liabilities arising will be to bidder’s account. The
Bidders shall examine the site of works and its surroundings at his/her own
responsibility. The bidders shall collect information that may be necessary for
preparing the Bid and entering into a contract. All costs and liabilities arising out of
the site visit shall be at Bidder’s account.
The Bidder is deemed to have examined and understood the tender document,
obtained his/her own information in all matters whatsoever that might affect the
carrying out the works expressly mentioned or works which may have to be carried
out to fulfill his/her contractual obligation within the scheduled rates and to have
satisfied himself/herself to the sufficiency for his/her offer.
The submission of tender by a contractor implies that he has read these
instructions, conditions of the contract etc. and has himself aware of the scope,
nature of works & specifications of the works to be done. GIPCL will not, therefore
after acceptance of contractor’s rate, pay any extra charges for any other reason in
case the contractor is found later on to have misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not
vitiate the contract or release the contractor from executing the work comprised in
the contract according to scope of works, magnitude of the works, requirement of
manpower & materials, equipment, tools & tackles, labour, etc. Contractor has to
complete the work in accordance with the contract documents irrespective of any
defects, omissions or errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and
satisfy himself regarding matters such as access to site, communication, transport,
working condition including constraint of work place, confined area, importance of
work, round the clock working conditions, additional safety requirements, flow of
water during monsoon/dry season in the River/Nallah, the type and number of
equipment, tools/tackles, skilled manpower, consumables and facilities required for
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
the satisfactory completion of work, the quantity of various items of the work, the
availability of local labour/skilled worker, availability and rates of material & skilled
worker, availability of additional manpower during monsoon season, local working
conditions, uncertainties of weather, obstructions and hindrances that may arise etc
which may affect the work or cost thereof, before submission of his Bid. Ignorance
of site conditions shall not be accepted by the GIPCL as basis for any claim for
compensation. The submission of a Bid by the BIDDER will be construed as
evidence that such an examination was made. Any later claims / disputes in regard
to rates quoted shall not be entertained or considered by the GIPCL.
The Rate/price quoted by BIDDER shall be based on his own knowledge and
judgment of the conditions and hazards involved and shall not be based on any
representations of the Engineer.
5. ELIGIBILITY CRITERIA
The following criteria will be adopted for qualifying the Bidders for consideration of
the Bid for the further proceeding.
5.1 Bidder should possess minimum Three years of industrial work experience during
last five years in similar nature of works like Operation and maintenance of STP/ETP
of Power Plants / Process Industries / Colony/ Corporation / Corporate Sectors /
Institutes and should enclose proof of the same. Bidder shall submit necessary
evidence for the same like attested copies of work orders along with work completion
certificates from clients. The work completion certificate shall comprise of order
value and executed value. Bidders should have executed the work directly. The work
executed as a sub-contractor or subletting agency shall not be taken in to
Note: For evaluation of the bid the executed value mentioned in the work completion
certificate will be considered.
5.2 Bidder should produce evidence of having experience of successfully completed
similar works as defined hereunder during last five years ending last day of the
month previous to the one in which tender is invited, satisfactory progress of ongoing
works etc. along with certified copies of documentary evidence preferably photo
copies of work experience from the clients. The experience should be either of the
a. One similar completed work each costing not less than the amount equal
to Rs. 18.72 lakhs. (60% of annualized estimate cost)
b. Two similar completed work each costing not less than the amount equal
to Rs. 12.48 lakhs. (40% of annualized estimate cost)
c. Three similar completed work each costing not less than the amount
equal to Rs. 9.36 lakhs. (30% of annualized estimate cost)
Bidder should specifically mention fulfilling of above criteria in his offer along with
details of work orders & work completion certificates issued by clients.
5.3 Tender fee: The tender fee (non-refundable) shall be submitted through RTGS or
through online payment as per details provided in clause no. 7 herein under.
Demand Draft will not be accepted for Tender Fee
5.4 EMD: The EMD shall be accompanied in the form of DD or Bank Guarantee given
by Bank as described in subsequent clause no. 7. or through online payment as per
details provided in clause no. 7 herein under.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
5.5 Bidder should have separate Employees Provident Fund code number towards
registration of firm with RPF commissioner.
5.6 Attested copies of relevant documents duly signed & seal on each & every page
shall be submitted. The above documents will be analyzed and after satisfaction, the
Price Bid will be open. GIPCL may verify the documents, experience certificates
issued by concern authority. After opening of technical Bid, if any required attested
documents found missing in the Technical Bid submitted by the Bidder, the tender
inviting authority may inform to that Bidder only once by E-mail to submit the missing
required documents within stipulated time limit. If Bidder/Bidders fail to submit within
stipulated time, their Bid will be declared technically disqualified and no further
correspondence will be entertained.
5.7 Bidder should have minimum average annual turnover of Rs. 9.36 lakhs for
last three financial years i.e. (2022-23,2023-24 & 2024-25). Bidder shall furnish
annual audited financial statement duly certified by Chartered Accountant for the last
three financial years to demonstrate the financial healthiness of the company. The
balance Sheet must be in the name of the company. Any type of MOU for this
purpose will not be entertained.
Note: In case, the annual turnover is less than the statutory guideline which does not
require audit, the bidder shall submit the turnover certificate from Chartered
5.8 The Bidder has to submit INCOME TAX Permanent Account Number (PAN),
TIN/VAT no. of the firm. Copies of the same shall be submitted.
5.9 The net worth of the bidder should be positive as evidenced from audited accounts
of last financial year i.e. FY-2024-25.
5.10 In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless
otherwise specifically mentioned in the tender.
5.11 If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered /
Stopped or banned from dealing in the past by any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations, Bid of that party may be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding on the
Bidder without any demur and that no further correspondence shall be done in this
regard at any stage. Bidder shall have to submit “Declaration for Contractual
Litigations” as amended in Annexure / Form attached.
5.12 Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of
Safety Laws and Regulations” as amended in Annexure-F in Section-F / Form
• If any Major Violation of any safety law(s) / Rule(s) is / are found during
the preceding Three (3) years, Bid of that party will be liable to be
rejected. Bidder agrees and undertakes to accept decision of GIPCL in
this regards as final and binding on the Bidder without any demur and that
no further correspondence shall be done in this regard at any stage.
• If any of the details submitted in the prescribed Annexure-F in Section-F /
Form to the Bid is/are found to be false, incorrect at any time in future,
then the Contract awarded to that Bidder / Contractor shall be liable to be
terminated forthwith without any notice / correspondence and Bidder
agrees and undertakes to accept decision of GIPCL in this regards as
final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Further,
Performance / Security Deposit will also be liable to be forfeited. Any dues
to GIPCL from the Bidder / Contractor shall be recovered from the
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
pending bills or any other dues payable to the Bidder / Contractor, if any
or otherwise through any other recourse available under the Laws.
The Bidder shall submit all the evidences, documents, attested copies of work orders
& work completion certificates etc… as a proof with EMD & Tender Fee and also
provide the requisite details online for meeting the prequalification requirements.
GIPCL will verify the experience, performance, capability & strength of Bidders,
independently for executing the job. GIPCL may visit the site & consult the owner of
the industry/property where similar job is executed by the Bidder. GIPCL reserves
the right to accept/cancel/reject any/all Bids without assigning any reason thereof.
The tenders of qualified Bidder/Bidders shall only be considered for further
Site Visit is mandatory prior to submission of bid to understand the scope of work,
working conditions, site conditions, equipments, tools & tackles, labor deployment,
associated risk, surrounding etc.
6. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to
the Bid exchanged by the Bidder and the Company, shall be written in the English
language. Any printed literature furnished by the Bidder, written in another language
shall be accompanied by an English translation for the purpose of interpretation of
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs. 53,000/- (Rupees Fifty Three Thousand only) and Nonrefundable
Tender fee Rs.2,950/- (Rupees Two Thousand Nine Hundred Fifty only) inclusive of
applicable GST shall accompany with Bid. Tender fee shall be submitted through
RTGS/ online mode of payment only as per details provided herein under.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor of
Gujarat Industries Power Company Limited from all Nationalized Banks or Axis Bank,
ICICI Bank, HDFC Bank, Kotak Mahindra Bank, IndusInd Bank, Federal Bank,
Bandhan Bank, IDBI Bank and Karur Vysya Bank as per Proforma of irrevocable BG
enclosed with this e-tender under Section-F.
Bank for EMD DD Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, EMD & Tender Fee may also be submitted through RTGS/online mode
of payment by bidders as per details given below:-
1. BANK NAME:- State Bank of India
2. BRANCH:- Nani Naroli
3. IFSC CODE:- SBIN0013423
4. BENEFICIARY NAME: Gujarat Industries Power Company Limited
Also, EMD & Tender fee may also be submitted through online payment gateway of
company’s website: www.gipcl.com (online Payment Form) as per details provided in
Section-F (Annexure-I) herein under
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period of
days after the due date for submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of after payment of
contract security deposit or deposit of contract performance guarantee by the
successful bidder. Alternatively EMD will be converted in SD and successful bidder
shall submit SD or performance bank guarantee for balance amount
7.5 The earnest money deposit will be refunded to the unsuccessful BIDDER after the
tender is finalized and after award of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees
and EMD should be submitted to GIPCL.
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance or
(ii) withdraws his tender before the validity date of the tender.
7.9 SCHEDULE OF EMD, TENDER FEE & OTHER SUPPORTING DOCUMENTS
Details of EMD & Tender fee paid by Address for Submission:
RTGS/online mode or EMD in physical Chief General Manager (Thermal)
form by way of DD/irrevocable BG (as GUJARAT INDUSTRIES POWER CO. LTD.,
applicable) with other documents duly (Surat Lignite Power Plant)
self-attested to be submitted in physical Village: Nani Naroli, Taluka: Mangrol,
form in sealed cover as per details District: Surat. PIN: 394112, Gujarat. Phone :
mentioned in NIT on or before the due 02629-261063
date & time of closing of the tender. Email IDs for submission of soft/scanned
Bid No. shall be mentioned at the top copies of documents: [email protected]
of cover/envelope.
8. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online at the https://tender.nprocure.com or
https://gipcltender.nprocure.com within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
(a) Pre-qualification and Techno-commercial Bid without price.
Note: Tender fee RTGS details and EMD shall be submitted in physical
form as per NIT.
(a) Pre-qualification and Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with techno-
commercial deviations, if any, shall accompany the bid. The following Information
shall be provided in the techno commercial bid:
1. Qualification and experience of site in charge.
2. Schedule of deviation (Annexure-G in Section-F) Technical as well as
commercial, if any.
3. Qualification & experience of Supervisors/Engineers.
The following supporting documents shall also be submitted along with EMD &
Tender Fee in physical form:
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
1. The tender documents duly signed in all pages without price bid along with
techno-commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial statements
i.e. profit and loss account and balance sheet duly certified by a practicing CA
will be required.
7. P.F. Number and Allotment Letter.
9. GST registration number/certificate copy.
10. Declaration-cum-Undertaking for Compliance of Safety Laws & Regulations
and Contractual Disputes / Litigations as per Performa Annexure-F under
11. Bidder should submit duly filled Annexure-H provided under Section-F of
Tender document
12. E-Reverse Auction User ID on website: https://e-auction.nprocure.com
All above documents shall be submitted in soft copies in PDF through e-mail
before last date of bid submission.
1. Percentage Rate Price Bid shall be submitted only in soft form through e- portal
Note: Estimate includes cost of all manpower, cost of all materials, labour,
cost of labour charges with their wages along with corresponding statutory
liabilities, supervisors, vehicles, spares & maintenance, shifting, transportation,
loading, unloading, equipment, all tools & tackles, mobilization, consumables,
site visit charges, loading & boarding of staff, accommodation, storage of
materials/equipments/consumables, preparation & submission of report, office
establishment, uniform cost, adhoc allowances, other misc. allowances as
declared by GIPCL safety equipments & PPEs, Legal & Statutory
requirements, Royalties, Rents, Excise duty, Sales Tax, Stamp Duties, Central
or State Government or Local body or Municipal Taxes or Duties, Turn over
Tax, Work Contract Tax, VAT, Octroi duty and / or any other duty / tax
(Including GST), levied by the Central, State Government or other Public
bodies, overheads, profit etc…and such other costs that are not specifically
mentioned herein but will be incurred by the contractor for the satisfactory and
timely completion of the work.
Total Estimated SoR Amount is including GST by considering present
2. Bidder’s % offer will be on Total Estimated Amount (including GST) and in
Invoice/Bill, GST shall be mentioned separately as per extant GST Laws at
actual as per prevailing rates as declared by Central Government on
submission of documentary evidence.
3. Bidder shall have to quote the rates in the form of %age. i.e. “At
Estimated Value OR _____%age below the estimated value
OR______%age above the estimated value.”
4. The quantities shown in the price Bid are approximate for the contract period
and may vary as per job requirement.
5. The quoted price shall be firm for entire contract period and also during
extension, if requires and shall not be subject to any esacalation in price, idle
charges for labour, machinery, overhead expenses etc. There will not be any
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
escalation/compensation to the contractor against any revision in MWR
(Minimum Wage Rates) and revision in materials price.
6. Contractor shall not pay less than the minimum wages notified by the
Government from time to time to his/her employees of corresponding category.
7. Contractor shall at his/Her expense comply with all labour and industrial laws
and such other acts and status as may be applicable to this contract in respect
to pay etc. on account of any default in respect of all liabilities and in case of
non-compliance of the above, the company can withhold their payments till all
legal liabilities are discharged.
8. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
B : METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place of
business of the person or persons submitting the Bid and must be signed and
sealed by the Bidder with his usual signature. The name of all persons signing
the documents shall also be typed or printed below the signature on each page.
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature
and designation of one of the authorised partners or other authorised
representative(s). A certified copy of the power of attorney authorizing such
partner or representative shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e by the President/Managing Director/Secretary or other
person or persons authorised to Bid on behalf of such Corporation/Company. A
certified copy of the board resolution/power of attorney authorizing such partner
or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
9. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission of
Bids and the expiration of the period of bid validity.
10. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the
bid and till official intimation of award/rejection made by the Company to the
b. While the Bids are under consideration, Bidders and / or their representative or
other interested parties are advised to refrain from contacting by any means, the
Company. The Engineer, if necessary, will obtain clarifications on the Bids by
requesting for such information from any or all the Bidders, in writing as may be
necessary. The Bidder will not be permitted to change the price or substance of
the Bid after the Bid has been opened.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
11. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and
eighty (180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications
shall constitute an agreement that the Bidder shall have no cause of action or
claim, against the Company for rejection of his Bid. The Company shall always
be at liberty to reject or accept any Bid or Bids at his sole discretion and any
action will not be called into question and the Bidder shall have no claim in that
regard against the GIPCL.
12. OPENING OF BIDS
12.1 The GIPCL will open the pre-qualification/Technical Bid/price Bid, as the case
may be, in presence of Bidder's representatives whenever such a procedure
has been specified. Otherwise the tender will be opened by the authorized
officers of GIPCL.
12.2 Preliminary Examination:
12.2.1 The Company will examine the Bids for any computational errors, for sureties
furnished by bidder, for authentication of documents submitted and
completeness of the Bids.
Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is
obtained by multiplying the unit price and quantity, the unit price shall
prevail and the total price will be corrected & will be binding to the bidders
(b) If there is a discrepancy between the Total Bid Amount and the sum of
total prices, the sum of total prices shall prevail and the Total Bid Amount
will be corrected & will be binding to the bidders.
13. EVALUATION & COMPARISON OF BIDS
13.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the
lowest evaluated Bid in conformity with the specifications of the tender
13.2 The Technical Bids will be examined for minor matters regarding qualification
of bids. Subsequent to correspondence with the respective bidders, the
decision of Tender Committee will be final.
13.3 All responses to requests for clarifications shall be in writing and shall be
presented to the Company through e-mail or in a sealed envelope on or
before the given date requested by the Company. If the Technical
clarifications sought by the Company do not reach the Company on or before
due date, the Bid will be rejected.
13.4 The comparison of all the Bids shall be carried out with reference to the
scope of work as per the technical specification. Any deviation/omission shall
be evaluated at highest quoted price of the deviation/omission quoted by any
of the Bidder. In case a separate price (for omission) is not given by any other
Bidder, a reasonable price of the same shall be taken & the same shall be
binding to the Bidders.
13.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par.
The loading shall be carried out at an interest rate of 2% above PLR of SBI.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
13.6 A Bid to be substantially responsive shall be one which on evaluation
confirms to all the terms, conditions and specifications of the Bid documents
without any material deviation or reservation.
13.7 For the above referred purpose, a ‘material deviation’ shall be one which
(a) Which affects in any substantial way the scope, quality or performance of
the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the
Bid documents, GIPCL’s right or the Bidder’s obligations, under the
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
14. RIGHT OF REJECTION OF TENDERS
14.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding
process and reject all Bids at any time prior to award of contract, without
thereby incurring any liability to the affected Bidder or Bidders or any obligation
to inform the affected Bidder or Bidders regarding the same.
14.2 Any Tender without EMD and Tender fee will be treated as non-responsive and
shall be rejected at the outset & no further correspondence shall be entertained
regarding this.
14.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if
such Bidder has quoted an abnormally low rate in the Bid document/price Bid.
15. AWARD OF CONTRACT
15.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest
quotation in conformity with the requirements of the specifications and
documents contained herein, provided further that the bidder is determined
and evaluated to be qualified to perform the contract satisfactorily.
15.2 The successful bidder shall be intimated of his selection through the Letter of
Intent or Letter of Award/ Work Order which shall be sent to him through e-
mail, courier, fax or registered mail.
16. CONTRACT PERIOD
16.1 The contract will be for a period of 02 years from the date of actual
commencement of operation of the contract as stated in the Special
Conditions of Contract (‘Contract Period’).
16.2 GIPCL reserve the right to short close the contract any time by giving one
month notice period without assigning any reason.
16.3 GIPCL reserves the right to extend the Contract Period up to 3 months on the
same rates, terms and conditions without any price escalation and entering
into any new contract.
16.4 The said Contract Period can be extended if mutually agreed upon by both the
parties up to one year and in such a case a revised work order shall be issued
at the same rates, terms & condition or at negotiated rates acceptable by both
parties i.e. the Company & the Contractor.
17. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
18. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
(i) The Contractor shall deploy suitably qualified and sufficient manpower for
timely & satisfactorily execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled
manpower separately to properly complete the job in given/scheduled time.
(iii) The Contractor shall depute its own workmen/labor with proper identification to
enter the colony premises after ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the
applicable labor laws/Acts norms including but not restricted to the age of the
workers, women workers and shall also ensure that a police verification and
security check for all the workmen/labor engaged at the GIPCL site is done and
necessary documents regarding the same shall be submitted to the GIPCL’s
authorized representative/officer-in-charge. Any default in complying with the
same or any misrepresentation regarding compliance of the same shall compel
GIPCL to initiate appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also comply with the safety requirements and provide his
workmen/labor with safety equipment like safety helmets, dust masks, gum
shoes/safety shoes, uniform and other necessary PPEs for properly
undertaking the operations involved under this contract. Following are also to
a) Safety shoes (standard approved ISI make)
b) Safety helmet (standard approved ISI make in yellow colour only)
c) Safety Goggles / face shield (as required)
d) Ear plug / Ear muff (as required)
e) Hand gloves like electrical hand gloves / cotton hand gloves / Chemical
(vi) Contractor shall nominate /authorize senior experienced person in writing as
Site-In-Charge to co-ordinate with concern GIPCL engineers and who shall
bear overall responsibility for performance of the contract. Such person shall
remain always available at site. Contractor has to submit the authority letter
and documentary proof for the same.
(vii) The Contractor shall appoint supervisors who shall co-ordinate with GIPCL’s
Engineer-In-Charge for daily entrusted job. They have to maintain daily records
dully signed for the works carried out and duly certified by concern Engineer-In-
Charge. The Contractor in co-ordination with the Engineer-In-Charge shall
ensure the availability of adequate manpower to carry out the job satisfactorily
on a daily basis. As per the instruction of Engineer-In-Charge they have to allot
the work and execute the same in specified time limit.
(viii) During month, if contractor’s manpower observed absent or irregular in duty
hours in that case company shall deduct as a penalty of Rs.500/- per
manpower per day.
(ix) During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources
(x) During emergency or similar situations, the Contractor shall be required to
mobilize resources as per need within the period of 04 hours as directed by
GIPCL. If the contractor fails to mobilize sufficient manpower to complete the
job in time, GIPCL will execute the job through other agency at the risk and
cost of the contractor with 15% supervision charges & the same will be
recovered from the Contractor’s bill.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
(xi) During working in high risk area, the workman must wear a suitable safety
apron, safety belt, safety hand gloves and goggles. It is the
contractor’s/contractor’s supervisor’s responsibility to ensure it without fail.
(xii) During unit overhauling, the contractor has to enhance the site manpower as
per the requirement to ensure the timely completion of work (During
overhauling period quantum of work increases substantially). For this,
enhanced work shall be completed by deploying additional manpower with
separate supervisor. Payment will be made on item rate basis only. The work
during the overhauling period is to be carried out round the clock. Contractor
should mobilize sufficient number of manpower and execute the work in all
shifts with independent manpower. Contractor should not continue the same
manpower for more than 12 hours
B: TOOLS & TACKLES:
(i) All tools and tackles required to execute the contract are in the scope of the
contractor. The contractor should ensure that tools and tackles are in healthy &
working condition. All consumable items would be in the scope of the contractor.
Note: If work is suffered due to want of sufficient manpower, tools &
tackles, vehicles, equipments and/or required consumables then
25% of the total job cost including applicable GST will be levied as a
penalty for each and every instance.
(ii) For proper execution of the work as per the scope, the contractor is required to
maintain sufficient quantity of tools & tackles with tractors & hydraulic trolleys in
good working condition at site as per day to day work load and emergency
situations to complete the work in stipulated time.
(iii) In case of any emergency arising during night hours the contractor should be in
a position to mobilize the manpower immediately within minimum time.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He
has to arrange all lighting equipment such as power cable, hand lamps. The
contractor has to take prior approval for taking electrical power supply. The
contractor should keep hand lamps of 24Volt for confined space and sufficient
quantity of 240 Volt and halogen lamp for other area ensuring safety at work
(v) Pin sockets of IS standards should be used for all connections. For any accident
take place & any damage to the equipment and/or injury to human due to
carelessness in loose connection, contractors will be held responsible & liable
for any recovery/actions.
19. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding
Documents, may notify the Company before one week of last date of submission of
online Bid, in writing or by E-mail at the GIPCL's mailing address [email protected]
as indicated in the 'Invitation to Bids'. The GIPCL's response (including an
explanation of the query) will be sent in writing or by E-mail to all prospective Bidders
who have received the Bidding Documents.
20. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict
adherence to the time schedule for performing the specified 'Works'.
21. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
The Bidder is required to carefully examine the specifications and documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies
or omissions in the specifications and documents or is in doubt for any meaning of
any part, he shall request in writing for an interpretation/ clarification to the GIPCL or
during site visit.
All such interpretations and clarifications shall form a part of the Bid documents.
All the payments against the work order shall be in Indian currency and payable
through RTGS (online payment) system only based on submission of required
documents like bank mandate form with original cancelled cheque.
23. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
a. The schedule of rates shall be read in conjunction with Instructions to Bidders,
General conditions of contract, Special conditions of contract and Technical
specifications.
b. The quantities given in the schedule of rates are estimated and will be made as per
actual work carried out as per the rates of work order.
c. The method of measurement of completed work for payment shall be in accordance
with the method of measurement specified in the tender.
d. No separate amount shall be payable for use of auxiliary equipment incidental to or
in day to day operation in the course of fulfillment of contractual obligation of the
Note: Interested bidders are requested to submit the online tender at least two
days in advance from the due date set for online submission of bid in order to
avoid non-participation of e-tender due to probable technical problem in e-
The quantities specified are estimated and for tendering purpose only. Payment will
be made, based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period
based on site requirement. Contractor shall not be entitled for any compensation on
ground of such alteration in scope of work. GIPCL reserves the right to operate or
increase/decrease quantities in each item or omit any item included in Schedule of
Quantity at his discretion. Contractor shall have no claim, whatsoever, on grounds of
loss of anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be
carried out the whole/part of the work as specified in the tender, the ENGINEER-in-
charge shall inform the fact for thereof to the CONTRACTOR and contractor shall
have no claim for any payment or compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in full but
which he did not derive in consequence of the full amount of the work not having
been carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions which shall
involve any curtailment of the work as originally contemplated.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING & E-
REVERSE AUCTION
SR. DESCRIPTION
1. Tender documents are available only in electronic format and same can be
downloaded from the website: https://tender.nprocure.com or
https://gipcltender.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com
2. Price bid should be submitted online through the website
https://gipcltender.nprocure.com only. No physical submission of price bid will
be entertained as it should be furnished on-line only
3. Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class III) as per Information Technology
Act-2000, using which they can sign their electronic bids. Bidders can procure
the same from any of the license certifying Authority of India or can contact
(n)code solutions- a division of GNFC Limited, who are licensed Certifying
Authority by Government of India
4. All bids should be digitally signed. The bidders are required to contact at the
below mentioned address for detailed training on on-line tendering and also for
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Info tower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India).
E-mail: [email protected], website: https://tender.nprocure.com
Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for online submission of bid in order to avoid non-
participation in case of any technical issues (website and/or network) at last
E-REVERSE AUCTION:
i. GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
ii. E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders (rounded
to the next higher whole number) from the total bids received OR (b) Minimum three (03)
lowest bidders, whichever is higher, shall be invited for participation in e-Reverse Auction
through n-procure platform.
iii. Opening Price (including GST), Decrement value and duration for the e-Reverse Auction
shall be informed to the qualified bidders before start of e-Reverse Auction.
iv. After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract Price
(including GST).
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
v. To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on website:
https://e-auction.nprocure.com that the bidder shall be allowed to participate the e-
Reverse Auction.
vi. In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required for
participating in online e-reverse bidding, then the Bidder can contact the following office
for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://tender.nprocure.com for information regarding e-tendering
registration process.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security, the successful Bidder, to whom the work is awarded, shall be
required to furnish a Performance Bank Guarantee (PBG)/Contract security deposit
in favour of Gujarat Industries Power Company Limited for guarantee amount at ten
percent (10%) of the “Annual Contract Price” Price” (excluding GST) from any
Nationalized Bank including Public Sector bank-IDBI Ltd or AXIS Bank, HDFC Bank,
ICICI Bank or Kotak Mahindra bank, IndusInd Bank or Federal Bank, Karur Vysya
Bank or Bandhan Bank in the format attached in SECTION-F, and it shall guarantee
the faithful performance of the 'Contract' in accordance with the terms and conditions
specified in these documents and specifications. Contract security deposit shall be
submitted strictly within twenty-one days from the date of LoI or work order,
whichever is earlier. The guarantee shall be valid up to guarantee period of four
months from the contract completion date. The Guarantee amount shall be payable
to the Company in Bidder's home currency without any condition whatsoever
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract
security deposit.
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Guarantee Period' after
completion of contract and on fulfilling contractual obligations throughout the
retention period. However, any delay in submission of initial SD will result in
equivalent late release of entire SD after guarantee period.
Bid security/EMD should be refunded to the successful bidder on receipt of
Performance Security
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of
contractor or any other reasons attributed to contractor the decision of
Engineer-In-Charge regarding the amount of recovery shall be final and
binding subject to a maximum of 10% of contract value (inclusive of GST).
Recovery will be affected from the monthly bills and/or retention
money/security deposit.
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c)
within the time frame given in work order and as per day to day instructions by
Engineer-in-charge, GIPCL shall get the work done by third party at the risk &
cost of the contractor with 10% additional overhead charges of GIPCL.
3. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the
contract the contractor is liable, shall be recovered by the GIPCL. The contractor
shall pay all such claims within 15 days of claim, failing which the same shall be
deducted from the bills of contractor.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
3. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule.
Contractor shall mobilize required resources within 04 hrs to meet the emergency
requirements and in case contractor fails to complete the emergency jobs related to
colony area, GIPCL will engage third party and will recover expenses from
contractor’s R.A. bills, Security Deposit and / or whatsoever for expenses incurred to
complete the job along with additional 10% overhead charges, plus applicable GST
as per extant GST Laws.
In case if contractor’s services are not found satisfactory with respect to timely
mobilization to meet emergency requirements, time bound activities, workmanship &
safety (OHSAS policy of GIPCL) then GIPCL has right to terminate the contract at
any time by giving 15 days advance notice without assigning any reason and will
make the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages
after giving 15 days advance notice to the contractor if any of the following events
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per
requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of
the acts, matters or things, which as per the contract are to be observed and
performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality
viii. GIPCL reserves the right to terminate the contract without giving any reason
whatsoever and forfeit the PBG .
5. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith
shall be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him from any money due or to
become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per directions of GIPCL / ENGINEER within the time frame given
and/or violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall get
the work done by third party at the risk & cost of the CONTRACTOR with additional
10% overhead charges of GIPCL and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt or
may be deducted by him from any money due or to become due to the
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract
to the extent possible shall be settled amicably between the parties. If amicable
settlement cannot be reached all the disputed issues shall be resolved through
arbitration before a Sole Arbitrator appointed by Managing Director, GIPCL
according to the provisions of The Arbitration & Conciliation Act, 1996. The place
of arbitration shall be at Surat/Vadodara or any other place within state of Gujarat
b. Work under the contract shall be continued by the contractor during arbitration
proceedings unless GIPCL shall order suspension thereof or any part thereof in
writing or unless the matter in such work cannot possibly be continued unless the
decision of the Arbitration proceedings is obtained.
7. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification,
the decision of General Manager (SLPP) - GIPCL will be final and binding on the
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees,
staff applicable under the Employee Compensation Act 1923 or any amendment
thereof as also insurance cover for third party liability. The contractor shall keep the
GIPCL indemnified from all liabilities arising out of his action in pursuance of this
contract. The E. C. Policy should be obtained from Surat Jurisdiction and shall be
assigned to GIPCL. EC policy should cover the specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his
workers as per clause no. 23 herein under.
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules,
orders and notifications whether central or state or local as applicable to him or to
this contract from time to time. These Acts/Rules include without limitation of the
1. Contractor shall be solely responsible and shall fully comply with all the provisions of
all the labor laws applicable such as the Minimum Wages Act, 1948, Contract Labor
(Regulation & Abolition) Act 1970, Factories Act, 1948, Payment of Bonus Act
Employees Provident Fund and Miscellaneous Provision Act 1952, Industrial Dispute
Act 1947, Workmen Compensation Act 1923, Payment of Gratuity 1972, Interstate
Migrant Workmen Act 1979, Equal Remuneration Act with Rules, Order and
Notifications issued/made there under from time to time.
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future applicable
to the contractor from time to time for performing the contract job.
2.1 The Contractor shall provide and be responsible for payment of Wages,
Salaries, Bonus, Social charges, Insurance, Food, Accommodation,
Transport, Medical and Canteen facilities and other statutory privileges and
facilities to his personnel as per law/rules/regulations and orders of the
Central Government, State Government, Local Authorities or other authorities
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
as are in force from time to time. All employees of the Contractor shall be
employee of the Contractor.
2.2 The contractor shall have a valid license obtained from Licensing Authority
under the Contract Labor (Regulation & Abolition) Act-1970 at the time of
execution of the contract covering all his employees working at Colony/SLPP
site and furnish the same failing which GIPCL may terminate the contract at
its sole discretion.
3.3 The Contractor shall at the time of execution of the contract have an EPF
Code Number obtained from the Authorities concerned under the Employees
Provident & Miscellaneous Provisions Act, 1972 and remit contributions in
respect of the employees employed by him at Colony/SLPP Site to the P.F
office concerned every month failing which GIPCL will recover from the
outstanding payment to the contractor from GIPCL.PF code of Gujarat region
should be taken.
2.4. The Contractor shall maintain all records/registers required to be maintained
by him under various labor laws mentioned above and produce the same
before the Statutory Authorities whenever required.
2.5 The Contractor shall also submit periodical reports / returns to the various
statutory authorities such as the Contract Labour (Regulation & Abolition)
Act-1970, Employees Provident Fund Act etc. Under intimation to HR&
2.6 The Contractor shall not pay less than the Minimum Wages notified by the
Government from time to time to his employees of corresponding categories.
2.7. The Contractor shall be responsible for payment of overtime wages to his
workmen, if any, in case they are required to work beyond the prescribed
hours under law as per applicable rates.
2.8 The contractor shall take Workmen Compensation Insurance Policy for all
his employees working at Colony/SLPP. The contractor shall indemnify the
company against any liability due to any work injury or accident to any of its
2.9 The Contractor shall in the event any of his workmen / employee sustains
any injury or disablement due to an accident arising out of and in the course
of his employment, provide necessary medical treatment and pay
compensation as applicable, required under the Workmen’s Compensation
2.10 If any of the persons engaged by the Contractor misbehave with any of the
officials or the Company or commit any misconduct with regard to the
property of the Company or suffer from any serious communicable disease,
the Contractor shall replace them immediately.
2.11 The Contractor shall not engage / employ persons below the age of 18 years.
Employment of women shall be strictly according to applicable laws.
2.12 GIPCL will have right to deduct and disburse the claims of the individual /
parties being a principal employer on any account whatsoever in relation to
their employment with the contractor. The Security deposit will be released
to the contractor at the end of the contractual tenure subject to an
undertaking by the contractor that in the event any of his workmen or the
heirs of workmen puts up a claim for recovery of money due to him from the
contractor before the appropriate authority under the I.D.Act 1947 or under
any other labor laws or for compensation under the Workmen’s
Compensation Act, 1923 and the appropriate authority has given a direction
for making payment the contractor will meet the same or indemnify GIPCL if
in the event GIPCL pays it as Principal Employer.
2.13 The contractor shall make payment of wages to his employees on fixed date
within the period specified under the applicable Law, in presence of
representative of the company. He will submit a true copy of wage sheet,
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
attendance register and P.F. remitted challans on monthly basis to HR&A
dept. for verification and record.
2.14 The Contractor shall provide Safety items / kits to his employees such as
safety shoes, goggles, ear plugs, hand gloves, safety belts etc., if any,
required under the law.
2.15 The contractor shall conduct pre-induction and periodic medical checkup of
his workmen as per applicable laws.
2.16 The contractor shall be solely responsible for any accident caused to his
workers and should adhere to all rules / regulations as per labor laws of
Government and other statutory laws as applicable.
2.17 The contractor should register himself under the Contract Labor Act,
Employee Compensation Act and PF Act (Code no. to be mentioned) and
submit the copy of registration certificate and should possess the same from
the date of commencement of work, failing which the contract is liable to be
cancelled. The E.C. Policy copy should be submitted to the GIPCL before
commencement of the work and Labor License should be obtained within
one week from the date of issue of form-V. Contractor should apply for Form-
V immediately after receipt of LOI. A copy of Labour License shall be
submitted to GIPCL, HR & A Department.
2.18 Contractor shall have to insure his workmen /supervisors etc. under Group
Insurance scheme.
2.19 The Contractor shall be responsible for compliance of all statutory rules,
regulation, act enforced from time framed by the government such as Factory
Act, Employee Compensation Act, payment of ‘Wages Act’, Minimum Wages
Act’, Provident Fund Act, All Labor Laws Act in respect of employees
engaged by him for the work and shall have to maintain necessary
records. In case any amount becomes due to be payable by him to his
employees or to the Government under the above rules, regulation, Acts,
GIPCL reserves the right to recover the same from the running bill of the
2.20 Documentary evidence of deposit of PF paid shall have to be produced by
the contractor along with the next bill.
2.21 Records as per the provisions of various statutory Acts will have to be
maintained by the contractor and submitted as and when required.
2.22 All employees of contractor should maintain due discipline and respect local
sentiments. GIPCL reserves the right to direct the contractor to remove any
such person who does not comply with it.
2.23 The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new
statute shall automatically and immediately become applicable.
2.24 Annual Health Check Up: - As per statutory requirement, Contractor has to
inform workmen deployed at site for annual health check up as per schedule
prepared by HR&A department
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the
payment as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the
provisions of Contract Labour Act, 1970 and maintain necessary records and
registers under the said Act.
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one-week time,
from the date of award of this contract.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within
the colony premises of the GIPCL and carry match box / lighter or any other
explosive and /or inflammable material inside the plant/colony.
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour
6. Contractor shall issue an appointment order to each casual labourer stating therein
the nature of job to be performed by him and fix time for which the concerned
labourers are likely to be deployed. Contractor shall also issue a temporary identity
card specifying the period for which the labourer has been deployed.
7. Contractor is fully liable for the persons engaged by him for above work; however,
GIPCL reserves the right to deduct any amount legally justified towards any liability
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment
of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame,
GIPCL shall get the work done by third party at the risk and cost of contractor.
10. PAYMENT OF WAGES
Contractor has to make payment on or before 7th of every month through bank.
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund
Act, Payment of Bonus Act and all applicable acts in respect of employees engaged
by him for the work and shall have to maintain necessary records. In case any
amount becomes due to be payable by him to his employees or to the Government
under the above rules, regulation, Acts.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third-party
workmen due to any act omission / indiscretion on your part while undertaking the
work and contractor shall fully abide by the statutory requirements of the employee's
compensation act. GIPCL shall not be liable for any compensation due to accident,
death or injury to any of contractor’s workmen or any third party due to negligence,
act or omission on your part.
General area lighting will be provided by GIPCL. However, work area specific
lighting should be arranged by contractor.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at
night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL
which are at present in force and which may come into force during the pendency of
the contract. Any violation of any rules and regulations will entail immediate
termination of the contract.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
When contractor moves his lifting tools and tackles to the colony area, required test
certificates as per the Factory Act 1948 and the state factories rules has to be
submitted to safety Deptt. Safety Deptt. will check the certificates and if found okay,
then only materials will be allowed to enter inside colony area. Material inward gate
pass will be made only after certification from Safety Deptt. Security Deptt. will
inform to Safety Deptt., as & when such tools and tackles brought at the gate for
making entry in the maintenance site.
The contractor has to submit the list of required safety gears along with safety
equipments available with him to safety Deptt. Safety Deptt will check for quantity
and quality of the safety gears and then allowed permission of work. Poor quality
material will not be allowed to take inside the Colony/Plant. If quantity of required
safety equipments is not satisfactory, contractor will not be allowed to carry out the
work using such safety gears inside the Colony/Plant for the work.
15. GENERAL SAFETY CLAUSES
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines
premises and the Contractor shall brief them regarding the same and use of the
Personal Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that
his workmen wears the protective equipments at all times during the work operation.
Following brand of the safety shoes and helmet shall be issued to contract workmen.
Contractor shall issue safety shoes every year.
Sr No. Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
02. V-Gard MSA IS : 2925 – 1984, ANSI / ISEA
03. PN 521 - Shelmet Karam
SR. No. Name of Manufacturer Model
1 Acme Fabrik Plast Co. SSTEELE (Strom) – Double Density
2 Acme Fabrik Plast Co. TRIMAX(Adjacent) – Double Density
3 Favourite Safety Products. Waves Nile D/D
4 Favourite Safety Products. FSP Nile DD
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots,
full body safety uniform and belts, safety net etc. shall be issued and used as per the
job requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor
will procure safety shoes & safety helmet from a reputed company with at least
months’ guarantee and shall produce the guarantee certificate and IS standard
certificate to the safety department. Contractor should purchase safety shoes of
reputed brands. Safety shoes will be issued every year. IS certificate and guarantee
certificate must be obtained from the vendor and submitted to the Safety
department. Safety shoes should be heat, water, oil and chemical resistant, having
an anti-slippery sole of 15298- 2002 make.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as
per work requirement. Contractor should ensure that their workers are wearing
Safety helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when they
are at work throughout the contract period. The contractor has to maintain the PPE
issue registers with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help
and treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of
required quality, GIPCL will issue the required PPEs to contract workers and back
charge the same with 25% overhead charges of GIPCL, plus applicable GST as per
extant GST Laws.
9. All lifting tools and tackles shall be duly certified by competent person in conformity
with the statutory requirements and certificate in form no. 10 as per rule 60 of
Gujarat Factories Rules, 1963 and section 29 of the Factories Act, 1948 shall be
submitted every year before using such tools and tackles. In case of purchase of
new lifting tools and tackles, form no. 10 as per the said rules shall be submitted
before they are taken into use. All lifting tools and tackles shall be of reputed make
having International manufacturing standard and shall be maintained in proper and
workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety
aspects at site. He is solely responsible for any safety measures during maintenance
work. He has to ensure that all the workmen working at site are equipped with
essential PPE’s and proper safety arrangement is made at the SLPP site.
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks,
D-shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered
for inspection with all above statutory test certificate before using at site for any
work. They should use all tools and tackles only after certification by GIPCL
representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials, full
body harness safety belt, ladders and crawling boards, fall arrester,etc. shall be used
to prevent accident. Further, during working on height, contractor should arrange
proper scaffolding of still pipes, safety net, full body safety belt, fall arrestor system
etc. Advice and instructions of engineer in charge/ safety in charge shall be strictly
complied with in this regard. All necessary safety precautions shall be taken by the
contractor to prevent accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting
torch, on DA cylinders and on O2 cylinder. Cylinder caps also required for handling
the cylinders at the work at height area. Gas cylinders shall be transferred through
gas cylinder trolley only with cylinder cap and stored up right (vertical) position only.
All gas cylinders shall be hydro tested / certified as per gas cylinder rules 2004. Gas
cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested
as per Government approved RTO guidelines. All Vehicles must be parked in
Parking space designated by GIPCL. If any vehicle is found inside the plant
premises other than the parking area such vehicles shall be handed over to Security
dept. and their entry shall be cancelled for movement inside the plant premises with
immediate effect.
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools & equipments i.e. welding machine, grinding and drill machine etc. may be
checked by the electrical engineer of the contractors regularly, every six month at
least and report to be submitted to concerned HOD and safety depts.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets
to prevent falling and spreading of sparks and hot material on and around the work
area. Contractor will procure and use such items. ELCB / RCCB shall be provided
with rating of 9-30 milli amperes on welding machine and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form
(S-II) and near miss report within time limit as specified in forms, if any accident,
Incident, near miss occurred while working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and
above) should appoint / nominate one qualified safety officer and he shall be
responsible for addressing all the safety related aspects of execution of contract jobs
and he will in close co ordination with safety officer of SLPP and attend all safety
related meeting such as safety committee, on job safety training etc. Where the
contractual man power is less than 50, the site incharge of the contractor will act as
a safety officer and he will perform all the duties of safety officer as mentioned
19. No loose connection / joints allowed in electrical cables during performance of any
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is
required as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety
training like tool-box talk etc. and submit a record of such training in safety dept,
respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as informed
by the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards /
Guidelines as per practices. The list provided below is an indicative list to explain the
principles behind safety practice. If the contract workmen fail to comply with safety
standards as per category A, B & C below, penalty shall be levied on the contractor
as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Working without helmet, Rs.100 /- per instant.
Related shoes, safety belt, gloves etc.
B WI Related Failure to adhere to HSE
guidelines/plans, careless • Rs.500 /- per
attitude in material instant.
Machine being used with
damaged machine guard, • After three
unsafe electrical work - incidence,
workout plug top/improper Per incidence
electrical joints/cables lying Rs.2500/-
on ground, electrical
equipment working without
proper earthing, machine • Continuous
being used without unsafe acts
machine guard, Welding will disqualify
machine without ELCB / the contractor
RCCB of proper rating, from further
Gas cylinder without test
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
certificate, Cylinder cap, participation
NRV / Flash back arrester, in tender of
Cylinder trolley etc. GIPCL-SLPP.
Unsafe working practices
at height more than
Working without permit or
non-compliance with
permit conditions like hot
work, height work etc. as
applicable, lifting tools and
tackles being used without
third party inspection
certificates in form no. 9/10
as per Factory Act –
C Unsafe Breach of safe practices by Suspend the entry
Practices a particular person gate pass for one
repeatedly for three times. week.
After two suspensions
his gate pass will be
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their
work area continuously will be rewarded / honored on National
25. Electrical safety
➢ All the electrical apparatus including welding machine (either 3-phare or single
phase) should be provided with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO)
of 30mA rating.
➢ Bidder should ensure periodic checking of ELCB provided in their electrical
➢ Bidder should ensure that there should not be any joint in the power supply cable of
any machine. All cables should be in good condition with no bare insulation or frayed
➢ Any power supply switchboard/extension boards brought by Bidder should have
ELCB of 30mA rating and it should have sockets along with 3-pin plug
➢ Any type of cable brought by Bidder should not have any joint and should be of
sufficient capacity for the respective job.
➢ Bidder to bring their own 24V rating portable hand lamps along with cable of
(apparatus should be having 230V / 24V transformer) for the temporary lighting
arrangement required at site for the respective jobs.
➢ Bidder should bring sufficient qty no. of temporary light fixtures (230V or 24 V as per
requirement of job/contract) , extension boards, cables to draw supply from nearest
➢ Hand-held and portable machines shall be equipped with a built-in switch to switch
off power in case of emergency
➢ Bidder to ensure healthiness of their electrical equipment whenever brought to
GIPCL site and get them tested / verified by GIPCL Electrical Department
representatives before start using.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
➢ Bidder to ensure - All portable electric apparatus shall be regularly examined, tested
and maintained to ensure that the apparatus and leads are in good order.
➢ Only three-core cable shall be used for single phase operated tools with the third
core connected to earth.
➢ Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible.
Also, the metal work of the apparatus is effectively earthed.
➢ All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
➢ The earthing arrangements should be properly made with earthing clamps or a
bolted terminal while using any welding machine
➢ Electric holders when not in use, should be placed on an insulated hook or the
holders should be fully insulated while using any welding machine
➢ Whenever the welder stops or leaves work for any appreciable time, the power
supply to welding machine shall be effectively disconnected while using any welding
➢ GIPCL will provide either single phase OR 3-phase 3 wire power supply from the
nearby point at job site. Bidder to supply the required cable between GIPCL power
supply point to equipment brought by Bidder for the specified job. Further, if Bidder’s
equipment requires 3-ph 4 wire supply then they should derive 3-ph 4 wire supply
from GIPCL 3-ph 3 wire supply system by incorporating sufficient capacity
transformer. Like for hydro jet cleaning system, mixer machine, induction heating
machine, SR machine etc., GIPCL will provide 3-ph 3 wire power supply.
➢ Cable between welding machine to GIPCL power supply point should have cable
TOP plug towards GIPCL power supply point of Make BALS having rating as
Contractors not following above electrical safety points at any point of time
are liable to penalty and their machine/ apparatus shall be seized by GIPCL.
16. REJECTION OF WORK
If, as a result of inspection, examination or testing, the GIPCL’s
Representative/Engineer decides that any materials, work or workmanship is
defective or otherwise not in accordance with the Contract, the GIPCL/Engineer/
GIPCL’s Representative may reject such plant, materials, work or workmanship and
shall notify the CONTRACTOR promptly, stating his reasons. The CONTRACTOR
shall then promptly make good the defect and ensure that the rejected item complies
with the Contract. If Contractor failed to rectify the rejected work or workmanship,
GIPCL/Engineer reserves the right to deduct or withhold amount against rejected
work or Workmanship. CONTRACTOR shall not entitle for any claim or release of
hold payment until rectify the defect up to satisfactory of GIPCL. If Contractor failed
to rectify any such defective work or workmanship, GIPCL reserve the right to rectify
at risk and cost of the CONTRACTOR and deducted by the GIPCL from any amount
due, or to become due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the
traveling and lodging costs of GIPCL/Engineer’s personal for attending the retest,
such costs shall be recoverable from the CONTRACTOR by the GIPCL and may be
deducted by the GIPCL from any amount due, or to become due, to the
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
17. GENERAL TERMS AND CONDITIONS
a. All tools & tackles, labours, equipments, materials, consumables, vehicles, etc… to
execute the contract are in the scope of the contractor. The contractor should ensure
that tools & equipments are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor
for defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take
suitable action.
d. Contractor shall depute location/Package wise full time independent experienced
site-in-charge/site supervisors at site. They shall co-ordinate with concern GIPCL
engineer and shall bear overall responsibility of contract including joint
measurement, billing, safety of workers etc. Such person shall function from site
office of contractor at GIPCL Colony.
e. Contractor shall also nominate one safety supervisor at site and shall submit
nomination of safety supervisor in writing before commencement of contract. Safety
supervisor shall arrange small safety talk on every day morning or whenever
required with all workers working under this contract. He shall coordinate with
concern department’s Engineer-in-charge on daily basis and report daily
observations, tool-box talk records etc. The work shall not be allowed without
deploying safety supervisor and a penalty equal to Rs. 1,000/- per day absent of
safety supervisor shall be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL and any
future revisions
g. The contractor has to take EC insurance policy for their workmen. The contractor
has to submit labor license and PF account number to the Engineer-in-charge before
start the work.
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In
case of delay of work without any valid reason, the GIPCL reserves the rights to
carry out the work by deploying other agencies at the risk & cost of contractor with
additional 10% overhead charges.
i. Contractor shall mobilize the resources as per need within the period of four hours. If
the contractor fails to mobilize sufficient resources to complete the job in time,
GIPCL will execute the job through other agency at the risk and cost of the
contractor with additional 10% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted shall remain firm till completion of the contract and
any agreed extensions thereafter and shall not be subject to any escalation, idle
charges for labor, machinery, overhead expenses etc… due to any reason
whatsoever. No price escalation / idle charges shall be entertained due to delay in
work on unavailability of work front, non-issue of work permit, holding of work permit
for any reason, unavailability of contractor’s supervisor, unavailability of contractor’s
safety supervisor, violation of safety rules, unsafe act by any of contractor’s worker,
negligence & ignorance of safety & quality instructions of GIPCL Engineer-in-charge
or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy safety PPEs like but
not limited to approved quality safety shoes & safety helmets, standard dust masks,
safety goggles, etc… as required and shall use exclusively under this contract for all
the time during working at specified locations, failing which, the Engineer-in-charge
may hold the work and will take necessary action including penalty as decided. If the
contractor repeatedly violates safety rules/regulations (more than three successive
incidents), Engineer-in-charge may take necessary action against the contractor,
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
including appropriate financial penalty (Maximum of Rs. 1,000/- per incident per
man-day and as per above clause no. 16) and/or termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract.
Contractor should closely monitor each activity and complete the jobs as per the
time given by and under the supervision of the Engineer-In-charge and shall ensure
that sufficient manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer-In-Charge for PTW (Permit to
work), work instruction, Return of permit etc.
p. The contractor has to submit daily reports showing work carried out with details of
available manpower, tractors etc.
q. Any job other than the listed jobs in work order shall be executed by the contractor
on instruction from GIPCL and payment shall be made to the contractor on
respective item rate only.
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October
2006. The Bidder shall confirm whether your organization is registered under the
Micro, Small and Medium Enterprises Development Act, 2006. If your organization is
registered under the Act, please specify the category i.e., Micro Enterprise, Small
Enterprise or Medium Enterprise under which it is registered and kindly attach a
copy of your registration certificate.
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of
the respective State Government. It is to be noted that large scale industries and
trading firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2011 (EnMS)
certified company, and GIPCL gives extreme importance to maintain these global
standards. Contractor shall be required to observe these standards while working
with GIPCL. Contractor should ensure that his workmen/labour work in accordance
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a
qualified experienced site-in-charge of the works with adequate experience in
handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEER.
Such in-charge shall be constantly in attendance at the site during working hours.
During CONTRACTOR’S supervisory engineer absence during working hours, if
unavoidable, and also beyond working hours, when it may be necessary to give
directions, orders may be given by the ENGINEER / GIPCL and shall be received
and obeyed by the CONTRACTOR’S superintendent or Foreman who may have
charge of the particular part of the work in reference to which orders are given. If
requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any
directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be
deemed to have been given to the CONTRACTOR. The representative of the
CONTRACTOR shall have all necessary powers to receive materials from the
GIPCL, issue valid receipts for the same, engage labour or purchase materials and
proceed with the work as required for speedy execution.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour
should be withdrawn from the work without due notice being given to the GIPCL /
ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
/ ENGINEER such withdrawals will jeopardize the required pace of progress /
successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such
persons as area careful, skilled and experienced in their respective trades, and the
GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any
person employed by the CONTRACTOR in or about execution of works who in the
opinion of the ENGINEER misconducts himself or is incompetent or negligent in the
proper performance of his duties and all such persons shall not again be employed
upon the works without the prior permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or
employ any employee of the other party except by mutual consent.
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND
All loose materials, wastage, packing materials, cut pieces or other matter of an
offensive nature shall not be deposited on the surface, but shall at once be carted
away by the CONTRACTOR to some pit or place provided by him away from the site
of work and approved by local authorities.
As a part of the work included in this contract, the CONTRACTOR shall completely
remove and satisfactorily dispose of all temporary works to the extent directed. He
shall tear down and dispose of all temporary works, shall remove or grade, to the
extent directed, all plant and equipment, shall satisfactorily dispose off all rubbish
resulting from the operations under this contract and shall do all work necessary to
restore the territory embraced within the site of his operations to at least as good
order and conditions as at the beginning of the work under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point. Further distribution to be done
by contractor at their cost.
b. Quarter(s) for supervisor/ engineers on chargeable basis in GIPCL’s colony at
discretion of GIPCL if available.
c. Workshop facility as available at site only on chargeable basis. However,
contractor may visit the workshop to ensure the existing facility. For the facilities
other than available, contractor has to carry out the job outside at their own
d. First aid facilities as available on chargeable basis.
e. For repairing of existing equipments of STP at colony (Package-1)
transportation shall be arrange by GIPCL free of cost. For lifting of pump hydra
shall be provided by GIPCL without any cost
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen regarding
the safety norms and measures to be observed during work operations at the
colony/plant site.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
21. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be
fully conversant with modern practices and should be able to carry out works
independently of large colony of thermal power plant. The contractor shall
therefore be required to engage qualified/ experienced personnel to undertake
the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records
and maintain the data.
c. The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the monthly bill
payment shall be released based on the certified reports of the works.
d. Inspection of work will be done by Engineer-in-Charge or his authorised
representative. If the work is not found satisfactory Engineer-in-charge reserves
the right to take suitable action and shall be binding to the contractor.
22. PUBLIC HOLIDAYS
The Contractor shall be responsible for giving benefit to all his employees, employed
in whatsoever capacity, 09 Public/Paid holidays and the same shall be notified in
advance and due communication thereof shall be made to the Management.
23. BENEFIT PAYABLE IN CASE OF ACCIDENT OUTSIDE PREMISES OR NOT
DURING THE COURSE OF EMPLOYMENT: (OFF DUTY COVERAGE)
The contractor shall provide off-duty insurance coverage (Medical + Death Benefit)
sum of Rs. one Lac (Nagrik Suraksha Policy or Equallent) to all its workmen
deployed at GIPCL-SLPP Colony site for the accident taking place outside the
Company premises anywhere in any capacity and in whatsoever may be the
manner. Premium amount would be around Rs. 95/- plus GST per person per year.
24. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other
Party in writing of such conditions and the performance shall be suspended as per
mutual agreement.
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control
of the Party and not foreseeable by the Party and shall include events of floods,
explosions, riots, wars, hurricane, epidemics, any other Act of God, quarantine
restrictions, terrorism, government actions and provided always that such acts result
in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all
actions, proceedings, claims, demands, losses, costs, damages and expenses
whatsoever which may be brought against or suffered by GIPCL which it may
sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
In case, in any litigation pertaining to labour employed through contractor if any
direction or order is issued by court at any point of time the contractor shall comply
with and implement such direction or order whether passed at the time of award of
contract or during the pendency of contract. Further, the Contractor shall indemnify
the GIPCL against all consequences arising and affecting GIPCL owing to the
compliance of the orders by the Contractor.
26. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the
Courts at Baroda/Surat shall have jurisdiction regarding the same
27. Where any portion of the General Condition of Contract is repugnant to or at variance
with any provisions of the Special Condition of Contract, then unless a different
intention appears, the provision of the Special Conditions of Contract shall prevail to
the extent of such repugnancy of variance
28. Uniform: The contractor shall issue three pairs of stitched uniform to contract
workmen (Pant-Shirt for men and Sari-Blouse to women workers). However, brand
of fabric will be MAFATLAL. The color of the uniform shall be as indicated by
GIPCL. The uniform should be issued to workmen within one month from the date of
commencement of the Contract, otherwise penalty will be imposed
29. Adhoc Allowance: Considering the inflation and financial conditions prevailing in
the market, to compensate the contractor towards the benefits of adhoc allowance.
Contractor shall pay additional adhoc allowances to the specified workmen per
30. Legal matters pending before the Court: In case, in any litigation pertaining to
labour employed through contractor, if any direction or order is issued by court at
any point of time, the contractor shall comply with and implement such direction or
order whether passed at the time of award of contract or during the pendency of
31. Annual Health Check-up: As per Statutory requirement Contractor has to inform
workmen deployed at Site for Annual health check-up as per schedule prepared by
• The Contractor shall be responsible for payment of overtime wages to his workmen,
if any, in case they are required to work beyond the prescribed hours under the
applicable law as per applicable rates.
• The Contractor shall not engage workmen below the age of 18 years. Employment
of women shall be strictly according to applicable laws.
• The contractor shall conduct pre-employment medical check-up and periodic
medical check-up of his workmen employed by him as per applicable laws.
• The list is indicative in nature and not an exhaustive one. Any amendment /
alteration / Notifications or addition to the existing Law or a new statute shall
automatically and immediately become applicable.
32. Where any portion of the General Condition of Contract is repugnant to or at
variance with any provisions of the Special Condition of Contract, then unless a
different intention appears, the provision of the Special Conditions of Contract shall
prevail to the extent of such repugnancy of variance.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
SPECIAL CONDITIONS OF CONTRACT
1. DETAIL SCOPE OF WORK
The scope of work covered in general comprises of “Monitoring & Maintenance
services for sewage treatment & Recycling plant at colony (Package I) & Monitoring
services for PT, ETP & run off system at DM Plant (Package II)" as detailed under:-
Package I : Monitoring & Maintenance services for sewage treatment & Recycling plant
at colony. The scope of work also including :-
a. Routine Monitoring of sewage treatment plant with deploying minimum one
skilled person having Mechanical and Electrical background / experience in
General shift and one unskilled persons for shift on monthly basis for
operating the plant. The scope of work and quoted rate also includes
deployment of extra manpower during weekly off day/ absence of available
manpower. Further, the scope of work and quoted rate also includes
deployment of additional manpower (minimum one skilled person having
Mechanical and Electrical background / experience in General shift and one
unskilled persons for shift and required additional person for round the clock
working (All three shifts) for operation of STP plant during monsoon period of
three months. The quoted rate includes deputation of additional manpower
during monsoon season for three shifts working and also deputation of
manpower during weekly off/absence of available manpower without
additional financial implication to GIPCL for payment to additional manpower
or for overtime of existing manpower for smooth operation of STP.
b. GIPCL will also deployed one unskilled manpower in shift duty for operation
of STP plant in colony. The payment of said person shall be given by GIPCL
directly. However, in absence of GIPCL deployed manpower, contractor have
to arrange manpower in shift for operation of STP plant. The quoted rate also
includes deployment of extra manpower or over time of existing manpower
during weekly off day/ absence of GIPCL manpower
c. Unit Monitoring shall include of raw sewage pumps, aeration tank with
surface aerator, clarifier with mechanism and sludge pumps, carbon and
pressure filters with treated effluent pumps and chlorination with hypochlorite
solution and submission of daily report thereof.
d. Contractor shall carry out testing of samples twice in a month for (I) BOD (ii)
COD (iii) pH value (IV) Suspended solids (v) Residue chlorine (vi) Total
Dissolved Solids (vii) Total nitrogen (viii) Fecal Coliform and submission of
reports thereof. Contractor shall visit twice in a month & submit visit report
with status of each equipment & line of action for smooth operation &
maintenance of STP.
e. The scope of work for maintenance services for sewage treatment &
Recycling plant at colony includes supply of all spares like bearings pump
parts (mechanical parts), nuts and bolts and consumable including kerosene,
HYPOCHLORITE solution etc shall be in the contractor scope of work. All
required tools, tackles, jutes and other misc. things required for maintenance
work shall be arranged by contractor. The scope of work and quoted rate
shall also include supply Hypochlorite solution required for daily
chlorination (Minimum 10 Litre/day) and maintaining enough stock of
this material at site for minimum 10 days stock. The scope of work also
included supply of require quantity of GUD, UREA & DAP as directive
and requirement given by Engineer in charge.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
f. The scope of work shall also include monitoring of the distribution networks
of recycled water to the connected houses, garden area, cricket ground area
by operating respective valves and checking the flows of water, monitoring of
leakages at each place by engaging one person for the same. The scope of
work includes monitor leakages of recycling pipes and attending the same
immediately as per item nomenclature of schedule of price enclosed
g. Contractor shall carry out repairing of breakdown equipments immediately.
For repairing of equipments transportation shall be arrange by GIPCL
free of cost. For lifting of pump hydra shall be provided by GIPCL Free
h. The scope of work for preventive maintenance of equipment shall be as per
Section-II of Packahe-I given in Section-E & as per directive and instruction
of Engineer in charge by engaging separate skilled manpower and required
tools, tackles, equipments, consumables. The contractor shall arrange
required skill manpower (fitter, welder, Forman, workers) and required tools,
tackles, equipments, consumables for preventive maintenance (as per
specified frequency) and breakdown maintenance of all the equipment,
piping, valves, filter, filter media and other all associated works for smooth
operation of STP and also submit detailed report of preventative
maintenance. Payments shall be done after satisfactory preventive &
breakdown maintenance, joint record (duly signed by contractor & GIPCL
engineer) and verification of engineer in charge.
For Package II : PLANT (Monitoring services for PT, ETP & Run Off System at DM
Plant in Plant premises)
a. Routine Monitoring of water treatment plant, effluent treatment plant, runoff
clarifier and water recovery pit pump with deploying eight person (one site in-
charge + 03 operators + 04 helpers) having chemical background with/
experience of ETP on monthly basis for operating the plant.
b. The scope of work for Monitoring shall include of two water treatment clarifier
and related all auxiliaries, Effluent treatment plant and related all auxiliaries,
all recovery pits and pumps, two numbers of thickeners, three numbers of
centrifuge and related auxillaries, Run off pond clarifier and related auxiliaries
and preparation of all process related chemicals as well as shifting of process
related chemicals from chemical house to dosing tank.
c. Contractor shall carry out testing of samples on hourly basis for ETP and
runoff clarifier at GIPCL lab and recorded at site.
e. The following tests / reports are required to be submitted every 15 days for the
treated water:- (I) BOD (ii) COD (iii) PH value (IV) Suspended solids (v) Oil &
Grease (VI) Total Disssolved Solids (TDS).
1.1 SPECIFIC REQUIREMENT
Contractor shall arrange to submit day to day Operation & maintenance report.
Supervisor will co ordinate with other departments. They will be responsible for
mobilization of manpower, materials, tools & tackles, consumables, equipments and
other required resources to carry out the work as per requirement. Contractor shall
also responsible to take record of operation of plant and breakdown etc.. in register
on daily basis and shall submit the register to the Engineer-in-charge for their
verification on every week.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
1.2 FAILURE DURING EMERGENCY
During any emergencies, contractor shall have to carry out the work by deploying
additional force within twenty-four hours notice period failing which GIPCL reserves
the right to carry out this work by engaging other party. The expenditure occurred due
to such situations, the Contractor will be held responsible & the same will be recovered
from the Contractor’s monthly bill / any other pending bills along with 10% overhead
charges. For repetitive failure of such work for more than two incidents, GIPCL reserve
the right to terminate the entire contract by forfeiting all pending dues, Security Deposit
& other retention money, if any, after giving 15 days notice to the contractor & this will
be binding to the contractor.
1.3 SPILLAGE OF MATERIAL
Contractor shall take due care to avoid any spillage of material while loading /
transporting / handling. To avoid spillage of material, overloading / heaping shall be
avoided by the contractors. Trolleys shall be in good condition for any leakage of
materials. In case of any spillage, contractor shall be responsible to clean up that area
at their cost otherwise GIPCL shall get the work done by other agency at contractor’s
risk and cost with additional 15% overhead charges.
1.4 DISPOSAL OF MATERIAL
Contractor shall be responsible for removal and disposal of excess or scrape material
outside premises or at designated locations as per prevailing GPCB norms. GIPCL will
not be held responsible for any subsequent consequences regarding improper
disposal of material. Contractor shall be required to submit written undertaking along
with the final bill that all the scrape material is disposed off at outside colony/working
premises or at designated location as per prevailing Government guideline and
contractor shall indemnify, keep harmless the GIPCL against any future liabilities or
consequences in this regard. Contractor’s final bill shall be processed only after receipt
of letter of undertaking by the contractor.
1.5 SCOPE OF CONTRACTOR
1. All tools & tackles, tractors, required vehicles to execute the Operation as well as
preventive& breakdown maintenance contract will be in the scope of the contractor.
The contractor should ensure for healthiness/working conditions of tools, tackles &
2. All consumable items like cloth, cotton waste, Oil, grease, kerosene, gas, diesel,
lubricants etc will be in the scope of the contractor.
3. All safety/PPEs required during work at site are to be arranged by the contractor.
4. The Contractor shall have to provide necessary facilities including accommodation for
their labor at their own cost.
5. The contractor has to arrange all spares like bearings pump parts (mechanical parts),
nuts and bolts, mechanical seal, bearing, oil seal, cotton waste, oil/grease,
thinner etc and all consumables including chlorine, hypochlorite solution, UREA,
DAP & GUD etc. as per the recommended dose at their own.
6. The contractor shall arrange required skill manpower (fitter, welder, Forman, workers)
and required tools, tackles, equipments, consumables for preventive maintenance (as
per specified frequency) and breakdown maintenance of all the equipment, piping,
valves, filter, filter media and other all associated works for smooth operation of STP.
7. The contractor shall arrange required extra manpower for three shifts working during
monsoon season and also during weekly off day/ absence of available manpower
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
8. Contractor has to depute their full time experienced overall site-in-charge/ supervisors
for work execution as per specification and for day to day work planning &
coordination with respective department’s Engineer-in-charge, to obtain day to day
Location/Package wise work permits, to get daily location wise work supervision, to
record Location/Package wise joint work done reports/measurements/trip certification,
to prepare Location/Package wise separate bills, to prepare & apply
Location/Package wise manpower gate pass, to maintain Location/Package wise
statutory & legal compliance records, etc…
1.6 TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the acts of
the GIPCL, or if defects not readily detected by proper inspection shall develop before
the final completion and acceptance of the whole work, the CONTRACTOR shall
forthwith make good, without compensation, such damage or defects in a manner
satisfactory to the ENGINEER / GIPCL. In no case shall defective or imperfect work be
retained even if contractor followed all technical specifications. GIPCL will not
compromise for quality of materials, works & workmanship.
The CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise or the
passing of any accounts.
1.7 DAILY DIARY AND PROGRESS REPORT :
A daily diary register will be kept in the ENGINEER’S office. The CONTRACTOR will
supply all detailed information every day at 9:00 hours for the day preceding and the
diary will be jointly signed by the ENGINEER and the CONTRACTOR’S
representatives, every day in token of its correctness. A works instruction book,
serially numbered will also be kept in the ENGINEER’S office and all day to day
instructions will be given in that book. The CONTRACTOR’S representative shall
report every day to see these instructions and sign them at the bottom in token of his
having seen them.
The CONTRACTOR shall provide all information regarding procurement of materials
and progress of work, as is required by the ENGINEER for compiling the weekly
progress reports. This information shall be provided by contractor at 9:00 hours every
Monday, for the preceding week.
2. PRICE & RATES
For Package I to II:
The price accepted shall include the cost of all spares like bearings pump parts
(mechanical parts), nuts and bolts, mechanical seal, bearing, oil seal, cotton
waste, oil/grease, thinner etc and all consumables including chlorine,
hypochlorite solution, UREA, DAP & GUD as per the recommended dose,
kerosene, jutes etc., tools, tackles and other things required for operation &
maintenance of STP AND for monitoring of PRETREATMENT PLANT, EFFLUENT
TREATMENT PLANT AND RUNOFF SYSTEM, cost of all materials, labour, cost of
labour charges with their wages along with corresponding statutory liabilities,
overtime of contractor’s manpower during absence of GIPCL manpower,
supervisors, vehicles, spares & maintenance, shifting, transportation, loading,
unloading, equipment, all tools & tackles, mobilization, consumables, site visit
charges, loading & boarding of staff, accommodation, storage of
materials/equipments/consumables, preparation & submission of report, office
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
establishment, uniform cost, adhoc allowances, other misc. allowances as declared
by GIPCL safety equipments & PPEs, Legal & Statutory requirements, Royalties,
Rents, Excise duty, Sales Tax, Stamp Duties, Central or State Government or Local
body or Municipal Taxes or Duties, Turn over Tax, Work Contract Tax, VAT, Octroi
duty and / or any other duty / tax (including GST), levied by the Central, State
Government or other Public bodies, overheads, profit etc…and such other costs that
are not specifically mentioned herein but will be incurred by the contractor for the
satisfactory and timely completion of the work. The whole item rates shall be
deemed to include for everything mentioned in the specification, all leads & lifts,
contractor’s overheads & profits for due performance of the work under this contract
and such other costs that are not specifically mentioned herein but will be incurred
by the contractor for the satisfactory and timely completion of the work. The rates
shall also include cost for mobilization / demobilization of manpower, equipments,
materials, etc... as per work requirement.
Any statutory changes in taxes & duties will be to GIPCL’s account. In case of any
reduction and/or removal of taxes, the same shall be passed on to GIPCL
The rates shall be firm for entire contract period and also during extension, if
required, and shall not be subject to any escalation in prices, idle charges for labour,
machinery, overhead expenses etc. No price escalation / idle charges shall be due
to any reason whatsoever.
The prices / item rates quoted by Bidder shall remain firm till completion of the
contract period and any agreed extensions thereafter and shall not be subject to any
other escalation, idle charges for labour, machinery, overhead expenses etc. No
price escalation / idle charges shall be payable due to delay in work by contractor or
due to non-availability of work front by GIPCL or any reason whatsoever.
The value and/or quantum of work may be increased or decreased depending upon
day to day requirement. However, item rates remain unchanged and the payment
shall be made as per the actual quantity executed as informed & certified by GIPCL
representatives.
The price/rate quoted by CONTRACTOR shall be considering mobilization of all
required manpower, tools & tackles, materials, equipment for timely and satisfactory
completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
day to day requirement. However, item rates remain unchanged and the payment
shall be made as per the actual quantity executed as informed & certified by GIPCL
representatives.
2.1 THE TOTAL RATE INCLUDING,
➢ shall include the cost of all materials, tools & tackles, cost of labour, supervision,
equipments, mobilizing, demolishing, fuels, lubricants, oils, fixtures, setting out,
transport, consumables, royalties, temporary & permanent works, local taxes &
levies (including GST), duties, uniform charges, EC & off duty coverage policy,
safety PPEs, overheads, profit, etc… all complete.
➢ Shall include the overtime cost of manpower due to absence of any of available
manpower and also due to weekly off/holidays/leave of available manpower.
➢ Shall include additional manpower cost for three shifts (Round o’clock )working
during monsoon season.
➢ Shall include cost of additional skilled manpower, consumable, tool/tackles,
equipment, supervision etc. complete for preventive & breakdown maintenance for
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
➢ Shall include cost of adhoc amount, unform, safety PPEs to worker.
➢ shall be deemed to cover working in adverse condition as well as supervision.
➢ shall be final and firm for the entire contract period including extension, if any, and
shall not be subjected to any escalation.
➢ Compliance of labour laws and other agencies is to be ensured by the contractor.
➢ The contractor will pay to laborers in line with prevailing minimum wages.
➢ Contractor representative shall site visit 02 times per month.
➢ To collect water sample and submit report 02 nos per month.
2.2 VARIATION IN MINIMUM WAGE RATE:
This being labour oriented job (Package-I, Section-I and package II only), the
contractor will pay the minimum wages & applicable statutory liabilities to the labours
as declared by the Government from time to time.
Rates Quoated by bidders will remain firm throughout the contract period and any
extension thereof. There will not be any escalation/compensation to the contractor
against any revision in MWR (Minimum Wage Rates). However, contractor shall not
pay less than the Minimum Wages notified by the Government from time to time to
his/her employees of corresponding category.
Contractor shall at his/her expense comply with all labour and industrial laws and
such other acts and status as may be applicable to this contract in respect to pay
etc. On account of any default in respect of all liabilities and in case of non-
compliance of the above, the company can withhold their payments till all legal
liabilities are discharged.
Contractor shall deploy labour/workers & supervisors in sufficient numbers and
quality to ensure workmanship of the degree specified in this contract and to the
satisfaction of the Company.
The item rates shall be firm for entire contract period and also during extension, if
required, and shall not be subject to any escalation in prices, idle charges for labour,
machinery, overhead expenses etc. No price escalation / idle charges shall be due
to any reason whatsoever.
The prices / item rates shall remain firm till completion of the contract period and any
agreed extensions thereafter and shall not be subject to any other escalation or
reimbursement, idle charges for labour, machinery, overhead expenses etc. No price
escalation / idle charges shall be payable due to delay in work by contractor or due
to non-availability of work front by GIPCL or any reason whatsoever.
The price/rate quoted by CONTRACTOR shall be considering mobilization of all
required manpower, tools & tackles, materials, equipment for timely and satisfactory
completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon
day to day requirement. However, item rates remain unchanged and the payment
shall be made as per the actual quantity executed as informed & certified by GIPCL
representatives
3. CONTRACT PERIOD
Contract period will be two years from the date of commencement (mobilization
period will be 07 days from the date of issue of LoI or Work Order whichever earlier)
or from the date of commencement as mentioned in work order.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
GIPCL reserves the right to extend the Contract Period up to 03 (three) months at
the same rates, terms & conditions without any price escalation and entering into
any new contract.
The said Contract Period can be extended if mutually agreed upon by both the
parties up to one year and in such a case a revised work order shall be issued at the
same rates, terms & condition or at negotiated rates acceptable by both parties i.e.
the Company & the Contractor.
4. TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the Package wise separate running invoices in duplicate
(one original in physical form and soft copy in MS Excel format as directed by
Engineer-in-charge) for every month in respect of the work performed or completed
during the previous month along with the documents as mentioned hereinafter. On
receipt of the invoice complete in all respects and with all the specified documents,
the payment in respect of the same shall be made within 21 days of such receipt of a
complete invoice as per the following terms of payment:
(i) For Package I &II- 100% of monthly RA bill along with 100% taxes shall be
released against the actual work executed and duly certified by GIPCL.
Income Tax (IT) will be deducted at source from monthly RA bills as per the
rules in force.
(ii) Security deposit at 10% of annual contract value shall be submitted as per
clause no.: 1 of Section-C. Security deposit will be returned to the Contractor
without any interest after retention period of four months from actual contract
completion date as certified by Engineer-in-charge as per clause no.: 1 of
(iii) Contractor shall quote the rate/price along with applicable GST. Party should
raise the invoice as per GST act.
(iv) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority (to
be furnished only once).
(b) Citing GIPCL’s GST no. along with contractor’s GST registration no. and
the date of issue of registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on the
(d) The contractor shall be required to submit the proof of payment of GST
of previous month/quarter, as may be applicable as & when demanded
by GIPCL/Owner/company.
(e) Contractor shall inform the Owner in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(f) Any statutory changes (increase/decrease) in taxes & duties will be to
GIPCL’s account. In case of any reduction and/or removal of taxes, the
same shall be passed on to GIPCL.
(v) At the time of submission of the first monthly RA Bill, the Contractor shall
submit a certificate from Engineer-in-charge regarding availability of tools &
tackles, equipments, vehicles etc at site. The Contractor shall also furnish the
checklist as per ANNEXURE-A enclosed with the Section-F of tender
document along with the RA bill of respective month.
(vi) The contractor along with monthly RA Bill shall submit copy of P.F. Challan,
Photo copies of wages register of previous month, photocopies of attendance
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
sheet of respective month & copy of ECR statement indicating the employee
and employer's P.F contribution of previous month with respect of employees
employed by him for the contract at GIPCL site.
(vii) The Contractor shall submit his Final Bill within a period of three months of the
expiration or earlier termination of the contract or any extensions that may be
granted by GIPCL to the Contractor. GIPCL shall not entertain any bill for any
work item after expiration of period of three months.
(viii) The Contractor shall include all his claims in the Final Bill submitted by him
and accordingly the final bill submitted by the Contractor shall be deemed to
be inclusive of all and whatsoever the claims that the Contractor may have
from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to have
waived any claims not mentioned in the Final Bill and shall not be entitled to
recover the same from GIPCL subsequent to the submission of the Final Bill
on any account and GIPCL shall stand absolved of all its liabilities in respect
of any such claims not raised by the Contractor in his Final Bill.
B. Validity and Uniformity of Rates
The rates shall be valid for a period of two years of the Contract Period and shall
remain unaltered during the entire contract period & any further mutual
agrred extension.
5. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for
verification purpose of the bill:-
(i) Measurement sheets (both in soft copy and in physical form) of work done.
(ii) Bill of material stamped & signed by security at gate entry.
(iii) Certified Joint Measurement records of work done in the form of duly signed
by GIPCL’s authorized representative and contractor’s supervisor in standard
(iv) Site visit Report 02 nos
(v) Sample Report ( treated water ) 02 nos
(vi) Check list (Annexure-A in Section-F).
The bill will not be entertained without submission of above documents.
6. SUBMISSION OF STATUTORY COMPLIANCES WITH EACH BILL
Contractor shall submit each RA bill of work carried out along with following
(i) Copy of statutory compliance like labour license, wages payment register, EC
Policy, PF paid Challan with ECR, etc… along wage certificate pertaining to
respective bill period.
(ii) Notarized Indemnity Bond in case of Final bill.
(iii) No claim - No arbitration certificate as per Performa (Annexure-D) in Section-
F), after releasing final bill payment.
(iv) CERTIFICATE OF COMPLIANCE BY CONTRACTOR as per Annexure-K
Bill submitted without any of the above documents shall not be processed for
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
7. MEASUREMENT & DAILY REPORTS
The unit of measurement will be as specified in respective item of Schedule
The contractor shall maintain day to day item wise and location wise record of work
done duly verified by various concerned authorities pertaining to area and shall
submit the same with each RA bill for verification and passing of bill accordingly. The
bill will not be processed without submission of certified work done records.
Contractor shall be required to furnish satisfactory job completion report to
GIPCL on daily basis. The monthly bill payment shall be released based on the
certified reports of the works.
7.1 The Contractor shall be required to furnish satisfactory job completion report to
GIPCL. The submission of report should be on daily basis, the monthly bill
payment shall be released based on the certified reports of the works.
7.2 Inspection of work will be done by Engineer-in-Charge or his authorized
representative. If the work is not found satisfactory engineer in charge reserves
the right to take suitable action and shall be binding to the contractor.
Wherever any dispute regarding mode of measurement arise, the decision of the
Engineer-in-charge shall be final and binding to the contractor.
8. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 04 hours from the time
the intimation given by GIPCL.
b) Contractor shall provide sufficient nos. of supervisors who will be responsible
for supervision and execution of job in specified time. The supervisors shall
coordinate with the Engineer-in-charge of GIPCL for proper execution of the
c) The resources required for execution of above jobs will vary from time to
time, hence contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him for
the work at his own cost.
9. QUANTITY OF WORK
The quantities against various items of Package I (Section-I) & Package-II is regular
frequencies for two years. Contractor shall strictly follow these frequencies item wise
and shall ensure the same periodically. Quantities mentioned in items of in other
Section/Packages is estimated periodical quantities likely to be executed during
contract period on as & when required basis for which contractor shall arrange
required manpower & other resources separately.
However, the Quantities or frequency of work may likely to be changed during the
course of contract period based on the requirement or any other unavoidable
Contractors shall engage required nos. of labors along with required tools & tackles
as per work load and emergency situations throughout the contract period to perform
his contractual duties.
Contractor shall have no any right for any compensation on ground of such addition
or reduction in scope of work. GIPCL reserves the right to operate/increase or
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
decrease quantities in each item or omit any item included in Schedule of Quantity at
his discretion. Contractor shall have no claim, whatsoever, on grounds of loss of
anticipated profit etc. on account of the same.
If any time after commencement of the work, GIPCL shall, for any reason
whatsoever, not require the whole work thereof as specified in the tender to be
carried out, the ENGINEER shall inform the fact to the CONTRACTOR who shall
have no claim to any payment of compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in full but
which he did not derive in consequence of the full amount of the work not having
been carried out nor shall he have any claim for compensation by reason of any
change having been made in the original specifications and instructions which shall
involve any curtailment of the work as originally contemplated. The quantum of work
of individual item may be up to any extent depending upon requirement. However,
item rate remains unchanged. Under this contract, contractor has to execute all work
as per the Colony/Plant requirement.
10. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders
are advised to go through the same. Where any portion of the general conditions of
contract is repugnant to or at variance with any provisions of the special conditions
of contract, then unless a different intention appears, the provision of the special
conditions of contract shall prevail to the extent of such repugnancy of variance.
11. FACILITIES TO BE PROVIDED BY GIPCL
a. Electricity & water at nearest available one point. Further distribution to be done
by contractor at their cost.
b. Space for constructing office & store as decided by GIPCL.
Apart from the above, no other facilities shall be provided by GIPCL. The contractor
shall provide necessary facilities, including accommodation for their labour at his
12. SPECIAL CONDITION OF CONTRACT AND APPLICABLE PENALTY: FOR
PACKAGE – I (COLONY)
a) Contractor shall arrange minimum one skilled person having Mechanical and
Electrical background / experience in General shift and two unskilled persons
for two shifts on monthly basis for operating the STP plant (09 months).
Further, contractor shall deploy additional manpower (minimum one skilled
person having Mechanical and Electrical background / experience in General
shift and three unskilled persons for three shift) for round the clock working (All
three shifts) for operation of STP plant during monsoon period of three months.
Contractor shall responsible for deployment of extra manpower during weekly
off day/ absence of any of available manpower.
In case of failure by contractor to arrange manpower as specified above,
following penalty will be applicable :-
Absence of Manpower in any shift Rs.500/- per shift
Duty hours less than 04 hours Consider absent.
Rs. 500/- per shift
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Duty hours more than 04 hours but less ten 07 Rs.250/-per instant
Duty hours by deployed shift manpower :- Rs.100/-per instant
more than 07 hours but less than 08 hours
Non-deployment of Manpower in case of long Rs.700/- per day
leave of deployed manpower
b) Contractor shall arrange supply of Hypochlorite solution required for daily
chlorination (Minimum 10 Litre/day) and maintaining enough stock of this
material at site for minimum 10 days stock. The scope of work also
included supply of require quantity of GUD, UREA & DAP as directive and
requirement given by Engineer in charge.
In case of contractor failed to supply above materials without any specific
reason and if above specified materials are not available at site for more than
three days, GIPCL may enforced penalty of Rs.100/- per day to the contractor
till receipt of materials.
c) Contractor shall arrange preventive maintenance of equipment as per directive
and instruction of Engineer in charge by engaging separate skilled manpower
and required tools, tackles, equipment, consumables. The contractor shall
arrange required skill manpower (fitter, welder, Forman, workers) and required
tools, tackles, equipment, consumables for preventive maintenance (as per
specified frequency) and breakdown maintenance of all the equipment, piping,
valves, filter, filter media and other all associated works for smooth operation of
If contractor failed to carry out preventive maintenance as per given frequency
without any specific reason, GIPCL may enforced penalty of Rs.500/- per day
for delay of more than 07 days beyond given frequency.
d) Breakdown maintenance of all the equipment, piping, valves, filter, filter media
and other all associated works for smooth operation of STP.
If contractor failed to carry out breakdown maintenance and failed to take any
action beyond 07 days without any specific reason, GIPCL may enforced
penalty of Rs.500/- per day.
e) Contractor authorized representative shall visit STP at colony twice in a month
& submit visit report with status of each equipment & line of action for smooth
operation & maintenance of STP.
If contractor representative failed to carry out visit twice in each month without
any specific reason, GIPCL may enforced penalty of Rs. 1000/- per each
f) Contractor shall have to remain present during the visit of any authority from
GPCB, CPCB & MOEF for joint sampling and clarification if required.
g) The contractor shall carry out work in shift/Sunday/holiday in case of any
emergency jobs.
h) The following tests / reports are required to be submitted every 15 days for the
treated water :- (I) BOD (ii) COD (iii) PH value (IV) Suspended solids (v)
Residue chlorine (vi) Total Dissolved Solids (vii) Total nitrogen (viii) Fecal
i) Contractor has to keep attendance register @ colony gate with daily in /out
Record of his employee duly sign by GIPCL colony gate supervisor. Contractor
has to strictly ensure duty hours of your employee. Penalty amount shall be
deducted pro-rata basis from contractor’s bill.
j) All required arrangements will be in the contractor’s scope.
k) All preventive maintenance shall be carried out as per the frequency
mentioned in the schedule and break down maintenance shall be taken up as
and when required at site
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
FOR PACKAGE - II (PLANT)
a) Contractor shall have to remain present during the visit of any authority from
GPCB, CPCB & MOEF for joint sampling and clarification if required.
b) The contractor shall carry out work in shift/Sunday/holiday for any emergency
The following tests / reports are required to be submitted every 15 days for
the treated water :- (I) BOD (ii) COD (iii) PH value (IV) Suspended solids (v)
Oil & Grease (VI) Total Dissolved Solids.
c) During the month contractror’s Visit at site & Water Sample report not
submitted,in that case company shall deduct as a penalty of Rs.2000/- and
Rs.1500/- per case respectavely.
d) For monitoring purpose manpower qualification is under :-
Site in charge: AOCP (ITI) or B.Sc with Chemistry and minimum
experience of five years of effluent treatment plant monitoring.
Operator: AOCP (ITI) or B.Sc with Chemistry and minimum
experience of Two years of effluent treatment plant monitoring.
Helper: S.S.C. pass and familiar with chemical handling
All required arrangements will be in the contractor’s scope
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PRICE BID (To be quoted online only through website):
https://tender.nprocure.com
Sr. Description Estimated Value % Service Quoted Amount with
No. with 18% GST (Rs.) charge (To Service charge and
be quoted GST (Rs.)
SOR Amount (including 18%
GST) for Biennial contract for
PACKAGE-I: Monitoring &
Maintenance services for
Sewage Treatment & Recycling Above/
Plant at SLPP-Colony and 62,42,122.66 Equal/
PACKAGE-II: Monitoring Below
services for PT, ETP & Run Off
System at DM Plant in Plant
premises (Year: 2026-28).
Note: Note: The quoted percentage rate on given SoR item rates will be inclusive of all
labour cost, equipments, materials, supervision, consumables, tools, tackles,
profit & overheads, all taxes & duties (including GST), etc… Rates shall be firm
for entire duration of contract period of two years and extension up to 03 Months
My rates are as under (only to be quoted online on https://tender.nprocure.com).
At estimated value including 18% GST
OR _______ %age above the estimated value including 18% GST
OR _______%age below the estimated value including 18% GST
Note:- (1) Percentage rate offer/bid price on SoR value including GST shall be quoted through online (n)-
Procure only. Hard copy of price bid shall not be considered/accepted.
(2) Evaluation of tender will be done on gross total quoted amount with GST.
SEAL & SIGNATURE OF TENDERER : __________________________________
NAME OF AUTHORISED PERSON : __________________________________
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
SCHEDUE OF RATE
PACKAGE -I (Section-I)
MONITORING AND MAINTENANCE SERVICE FOR SEWAGE TREATMENT AND
RECYCLING PLANT AT SLPP- COLONY
Sr. ITEM DESCRIPTION QTY. UNIT RATE AMOUNT
1 Routine Monitoring of sewage treatment 24 Month 52695.20
plant with deploying minimum two persons
(one skilled & one unskilled) on monthly
basis for operating the plant. The rate shall
be also including providing extra
manpower on off day of regular manpower
during monsoon period of three months for
round the clock operation, during absence
of GIPCL manpower, overtime if any etc,
complete as per detailed scope of work
specified in Section-D and as directed by
Engineer in charge.
This Monitoring includes
1) Monitoring raw sewage pumps, aeration
tank with surface aerator clarifier with
mechanism and sludge pumps, carbon and
pressure filters with treated effluent pumps
and chlorination with treated effluent
pumps and chlorination with providing
hypochlorite solution(min10litre per day) &
required UREA,DAP & GOL and
submission of daily report thereof.
2) Testing of samples twice in a month for
PH,COD,BOD,TSS,Total
Nitrogen,Fecal Coliform, Residue
chlorine and submission of reports
thereof.Also viist twice in a month & submit
visit report with status of each equipmets &
suggestions for further improvements..
3) All required tools, tackles, and other
things required like safety gadgets
etc…will be arranged by you.
4) Monitoring the distribution of recycled
water to the connected houses by
operating respective valves and checking
the flow to houses & garden networks. You
will also monitor leakages etc…to recycling
Total quoted price for Package-I
Contractor’s applicable GST for
Package-I (Section-I)
Total Quoted Price with GST for
Package-I (Section-I)
Note: The online quoted rates/Price shall be inclusive of all labour cost, equipments,
supervision, consumables, tools, tackles, all taxes & duties (including GST),
profit & overheads etc..Item rate shall be firm for entire duration of contract
period of two years. Bidder shall quote including GST on their quoted price.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PACKAGE -I (Section-II ) (Preventive & Breakdown Maintenance)
MONITORING AND MAINTENANCE SERVICE FOR SEWAGE TREATMENT AND
RECYCLING PLANT AT SLPP- COLONY
Nature Unit Total
Name of Activity of UOM Rate Amount.
Mntc. (Rs.) (Rs.)
PM of Horizontal Pump (T.E.
Overhauling of Horizontal Pump
3 Oil seals replacement of pump. BD 4.00 No 2821.00
Mechanical seal replacement of
Replacement / Repaire of gland
follwer & its bolt at site.
Submersible pump.
Submersible pump.
Overhauling of Submersible
Pump 1.5/5 HP/7.5 HP/10 HP
Overhauling of Submersible
Pump 15 HP/20 HP/40 HP
Shifting of Submersible Pump in
premises. (5 & 1.5 HP)
Replacement of suction strainer
in submersible pump
12 Gland tightening of Pump. BD 4.00 No 341.00
13 Gland replacement of pump. BD 4.00 No 345.00
Replacement of flixible hose in
Suction strainer cleaning of
Replacement of belt in Gear box /
Greasing in pump, Blower,
Clarifier drive and Plummer block.
Love joy coupling spider / pin
bush replacement
Replacement of coupling Pump/
Oil top up in pump, Blower &
Oil replacement in pump, Gear
Replacement of Oil Cup / Oil level
22 indicator. BD 2.00 No 1028.00
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Nature Unit Total
Name of Activity of UOM Rate Amount.
Mntc. (Rs.) (Rs.)
Decoupling, Alignment and
23 Coupling of pump/ Blower/ BD 4.00 No 2738.00
Gear Box with motor.
24 Servicing of PSF vessel BD 2.00 No 8202.00
Opening and closing of Man hole
cover of tank/Vessel.
26 PM of Clarifier PM 6.00 No 2732.00
27 PM of Aerator Mechanism PM 6.00 No 2732.00
28 Overhauling of gear box BD 2.00 No 5885.00
Plumber block / Bearing
replacement in clarifier.
Replacement of Traction Wheel
Replacement of chain / sprocket
Replacement of pinion shaft /
pinion in Clarifier
Erection & Welding of MS / SS
33 pipe up to 6mm thk up to BD 20.00 M 556.00
Threading, fitting, Erection &
35 Welding of GI pipe up to BD 20.00 M 517.00
50 NB (per meter)
Welding of MS / SS joint up to
6mm (in inch dia).
Erection & welding of MS / SS
flange upto 80NB..
Erection of UPVC pipe up to
Erection of UPVC pipe up to
Erection of UPVC pipe up to
Erection/ replacement of UPVC
valve up to 50NB
Erection/ replacement of UPVC
valve up to 100NB
Attending leakage in PVC/HDPE
Attending union leakage in pipe
Attending flange leakage in pipe
line upto 80 NB
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Nature Unit Total
Name of Activity of UOM Rate Amount.
Mntc. (Rs.) (Rs.)
Dewatering of Valve Pit/drain
Pin hole leakage attending of
49 above ground pipe up to 100NB BD 6.00 No 1606.00
Pipe line chocking clearing up to
51 Gland tightening in valves BD 4.00 No 83.00
Servicing of Gate / Globe Valve
at site up to 150 NB.
Servicing of NRV at site up to
54 Servicing of Float Valve.. BD 2.00 No 1540.00
Servicing of butterfly valves up to
Replacement of gate, globe
valve, NRV and upto 150 NB.
Replacement of thraded gate,
57 globe valve, NRV and Float / Foot BD 4.00 No 1364.00
valve upto 50 NB.
Replacement of Butterfly valve up
Fabrication / Replacement of
Freeness checking of various
type & size of valves
Servicing of Manual Hoist/Chain
Pulley Box & Travelling Trolley.
Fabrication & Erection of
structrual job. (in MT)
Erection of scaffolding for
63 Miscelleneous work.3MX3M X6M BD 1.00 No 4041.00
64 Supply of Material/parts 10000.00 % 1.10
Supply & fixing of 80 NB CS
PIECE,FLANGED END in
existing line with necessary
cutting,welding,bolting etc .Basic
rate of Valve is Rs.13000 /-
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Nature Unit Total
Name of Activity of UOM Rate Amount.
Mntc. (Rs.) (Rs.)
Replacement of flexible hose in
submersible pumps supplying &
fixing of pvc hose pipe110 dia
incl. clamp, Remove damage
hose. Fix new hose.Bais rate of
hose pipe is RS.225/-M
Total quoted price for Package-
I (Section-II) Rs.
Contractor’s applicable GST
for Package-I (Section-II) Rs.
Total Quoted Price with GST
for Package-I (Section-II) Rs.
Note: The online quoted rates/Price shall be inclusive of all labour cost, equipments,
supervision, consumables, tools, tackles, all taxes & duties (including GST), profit
& overheads etc..Item rate shall be firm for entire duration of contract period of two
years. Bidder shall quote including GST on their quoted price.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
MONITORING FOR PRETREATMENT PLANT, EFFLUENT TREATMENT PLANT AND
PRICE BID FORMAT
Sr. Item Description Qty Unit Rate Amount
1 a). Routine Monitoring of water treatment plant, 24 Month 148485.757
effluent treatment plant, runoff clarifier and water
recovery pit pump,Schedule -I & II sampling
Sand , Activated carbon and resin media fillup &
removal with deploying eight person( one sight in
charge + 3 Operator +4 helpers) having chemical
background with/ experience of ETP on monthly
basis for operating the plant.
b). Your unit monitoring shall include of two water
treatment clarifier and related all auxiliaries,
Effluent treatment plant and related all auxiliaries,
all recovery pits and pumps, two numbers of
thickeners three numbers of centrifuge and
related auxillaries, Run off pond clarifier and
related auxiliaries and preparation of all process
related chemicals as well as shifting of process
related chemicals from chemical house to dosing
c). You shall carry out testing of samples on
hourly basis for ETP and runoff clarifier and
submission of reports thereof.
d) You have to do the liasioning with GPCB, Surat
and Gandhinagar for getting/applying
consent/renewal of consent {Air, Water,
Hazardous (soil) waste etc.} from time to time for
operating the plant incl. application in standard
format of GPCB at Surat and Gandhinagar for
getting the same. You shall have to remain
present during the visit of any authority from
GPCB, CPCB & MOEF for joint sampling and
clarification if required..
e)The following tests / reports are required to be
submitted every 15 days for the treated water :-
(I) BOD (ii) COD (iii) pH value (IV) Suspended
solids (v) Oil & Grease. (VI) Total Disssolved
Total quoted price for Package-II (Rs.)
Contractor’s applicable GST for Package-II
Total Quoted Price with GST for Package-II
Note: The online quoted rates/Price shall be inclusive of all labour cost, equipments,
supervision, consumables, tools, tackles, all taxes & duties (including GST),
profit & overheads etc..Item rate shall be firm for entire duration of contract
period of two years. Bidder shall quote including GST on their quoted price.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
SUMMARY OF SOR FOR PACKAGE I & II
Package Name of Work Total GST Amount (Rs.)
Amount (Rs.) Amount including
(Rs.) GST for Two
I Section-I Monitoring & Maintenance 1264684.80 227643.26
services for Sewage Treatment and
Recycling Plant at colony (Regular
Section-II Preventive & Breakdown 461591.50 83086.47
Maintenance for Sewage Treatment
and Recycling Plant at colony
II Monitoring services for PT, ETP & 3563658.16 641458.47
Run Off System at DM Plant in Plant
Total Amount of Packages (I & II) 5289934.46 952188.20
Total Amount of Packages (I & II) 5289934.46 952188.20
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
LIST OF ANNEXURES & FORMS
CHECKLIST FOR PASSING THE BILLS
For the month of :
1) Work Order / P.O. No. & :
2) Nature of work :
3) Duration of Work Order : From to
4) Maxi. No. of manpower per day : M F Total
deployed in the month.
5) Details of Labour License : Valid up to for
6) Details of E.C Policy : Valid up to for
7) Documents attached for verification : Wage & Attendance Sheets.
for the previous month. Yes/No
P.F Challan Yes/No
8) Documents attached for verification : Bonus Payment Register
(in case of Final Bill) Yes/No
: Leave wage register Yes/No
9) Security Deposit / Retention Money : Yes / No if yes, Rs.
Date : Signature of Contractor
with official stamp
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE
BY SELLER / CONTRACTOR
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having itsoffice at PO:
Ranoli, Dist. Vadodara – 391 346, Gujarat State, India (hereinafter referred to
as “The Company/Owner” w h i c h expressions shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns)
has entered into a contract with M/s. ………………………………../ has placed
a purchase order on M/s………………………….(hereinafter referred to as
“Contractor(s)/ Seller(s)” which expression shall unless repugnant to the
subject or context includes their legal representatives, successors and assigns
) for …………………………….on the terms and conditions as set out inter alia,
in the Company‟s contract No./ P.O.No.…………..date …………and various
documents forming part thereof hereinafter referred to as the“said contract”
which expression include all amendments, modifications and/ or variations
thereto and where as the Contractor(s)/ Seller(s) has agreed for due execution
of the entire contract and guarantees its performance including any parts
executed through any other agencies/ subcontractors
AND WHEREAS one of the conditions of the “said contract” is that
“contractor(s)/seller(s) shall furnish to the owner a Bank Guarantee from a
bank for….% (……….percent) of the total value of the “said contract” against
due and faithful performance of the “said contract” including performance
guarantee obligations of the contractor(s)/seller(s) for execution/ supplies
made under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do
hereby agree and undertake to pay the amount due and payable under this
guarantee without any demur merely on a demand from the Company stating
that in the opinion of the Company, which is final & binding, the amount
claimed is due by reason of default made by the Contractor(s)/ Seller(s) in
performing any of the terms & conditions of the said Contract including defect
liability obligations, in fulfilling the performance guarantee obligation or loss or
damage caused to or would be caused to or suffered by the Company by
reason of any breach by the said Contractor (s)/ Seller(s) of any of the terms
& conditions of the contract. Any such demand made on the Bank by the
owner shall be conclusive as regards the amount due and payable by the
Bank under this guarantee. However our liability under this guarantee shall
be restricted to Rs.-------------------------(Rs ……………………only)
3. We undertake to pay to the Company any money so demanded not
withstanding any dispute or disputes raised by the contractor(s)/ Seller(s) in
any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid
discharge of our liability for payment there under. Our liability to pay is not
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
dependent or conditional on the owner proceeding against the Contractor(s)/
4. The guarantee herein contained shall not be determined or affected or
suspended by the liquidation orwinding up, dissolution or change of
constitution or insolvency of the said Contractor(s)/ Seller(s) but shall in all
respect and for all purposes be binding and operative until payment of all
money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or
______________ whichever is earlier. The Bank undertakes not to revoke
this guarantee during its currency without previous consent of the
OWNER/PURCHASER and further agrees that if this guarantee is extended
for a period as mutually agreed between bidder & owner/purchaser, the
guarantee shall be valid for a period so extended provided that a written
request for such extension is received before the expiry of validity of
6. We ……………Bank further agree with the Company that the company shall
have the fullest liberty without our consent and without affecting in any
manner our obligations hereunder to vary any of the terms and conditions of
the said Contract(s)/ Order(s) or to extend the time of performance by the
said Contractor(s) Seller(s) from time to time or to postpone for any time or
from time to time any of the powers exercisable by the Company against the
said Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and
conditions relating to the said Contract(s)/ Order(s) and we shall not be
relieved from our liability by reason of any such variation, or extension being
granted to the said Contractor (s) / Seller(s) or for any forbearance, act or
omission on the part of the Company or any indulgence by the Company to
the said Contractor(s)/ Seller(s) or by any such matter or thing whatsoever
which under the law relating to sureties would, but for this provision, have
affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force
till..……..Unless a demand or claim under this Guarantee is made on us
within three months from the date of expiry we shall be discharged from all
the liabilities under this guarantee.
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized
On behalf of the Bank
With Seal & Signature code
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of appropriate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate
Office at PO: Ranoli, Dist.Vadodara – 391 346, Gujarat State, India (hereinafter
called “The Company Owner” which expression shall unless repugnant to the
subject or context includes its legal representatives, successors and assigns) has
issued tender paper vide its Tender No……………………………………………for -----
-------------------------------------- (hereinafter called “the said tender”)to
M/s.……………………………(hereinafter called the said Tenderer(s)” which
expression shall unless repugnant to the subject or context includes their legal
representatives, successors and assigns and as per terms and conditions of the said
tender, the tenderer shall submit a Bank guarantee for Rs.……….
(Rupees……………..only) towards earnest money in lieu of cash.
2. We ……………………………..Bank having its branch office at
……… do hereby undertake to pay the amount due and payable under this
guarantee without any demur, merely on a demand from the Company stating that in
the opinion of the company which is final and binding, the amount claimed is due
because of any withdrawal of the tender or any material alteration to the tender after
the opening of the tender by way of any loss or damage caused to or would be
caused or suffered by the Company by reason of any breach by the said tenderer(s)
of any of the terms and conditions contained in the said tender or failure to accept
the letter of Intent Agreement or that the amount covered under this Guarantee is
forfeited. Any such demand made on the Bank by the owner shall be conclusive as
regards the amount due and payable by the Bank under this guarantee, However,
our liability under this guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding any
dispute or disputes raised by the tenderer (s) in any suit or proceeding pending
before any office, court or tribunal relating thereto our liability under this present
guarantee being absolute and unequivocal. The payment so made by us under this
bond shall be a valid discharge of our liability for payment there under. Our liability to
pay is not dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by
the liquidation or winding up, dissolution or change of constitution or insolvency of
the said tenderer(s) but shall in all respect and for all purposes be binding and
operative until payment of all money due or liabilities under the said contract(s)/
Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
finalization of the said tender and that it shall continue to be enforceable till the said
tender is finally decided and order placed on the successful tenderer(s) and or till all
the dues of the company under or by virtue of the said tender have been fully paid
and its claims satisfied or discharged or till a duly authorized officer of the company
certifies that the terms and conditions of the said tender have been fully and properly
carried out by the said tenderer (s) and accordingly discharges the guarantee.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
6. That the Owner Company will have full liberty without reference to us and without
affecting this guarantee to postpone for any time or from time to time the exercise of
any of the power of the owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PERFORMA CERTIFICATE
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept
this, and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract
and extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will
not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the
works for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out
above referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the
statutory requirements. We hereby indemnify GIPCL from any disputes arising in future
related to payment of labours, Provident Fund, etc.. and confirm that all liabilities of
settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
List of qualifying staff to be submitted with physical documents
Sr. No. Name of Supervisor Qualification Experience
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Note: Form-A of Bid without price shall be submitted with Part-I
List of Tools & Tackles to be submitted with physical documents
Sr. No. Description Nos. Status
Contractor / Authorized Representative’s
Signature, Company’s / Organization’s Seal & Date
Note: Form-B of Bid without price shall be submitted with Part-I
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
6.1 ANNEXURE-E-1
EQUIPMENTS, TOOLS & TACKLES TO BE OWNED BY CONTRACTOR
Sr. Description Quantity
1. Spanner set 1 no.
2 Welding machine 1 no
3. Cutting machine 1 no
4. Grinder 1 no
5 Tools & tackles for preventive maintenance As required
The Contractor shall note that above list is not exhaustive and if any additional tools
& tackles or equipment, machinery etc., are required for proper performance of the
contract, the contractor shall also arrange the same immediately without any extra
cost to GIPCL. Above equipments shall be in good condition for execution of work,
equipments older more than 10 years and running not properly shall not be allowed
to work on site.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
(Performa for daily work done report/measurement sheet)
Name of Agency:
Work Order No.:
DAILY WORK DONE REPORT FOR DATE: ___________________
Name of Supervisor of Contractor: __________________________________
Sign of Engineer-in-charge (to be taken at 08:30 AM to 08:45 AM):_______________
Total nos. of trips certified by me
Sign of Contractor's site-in-charge
(Shift-in-charge, Main Control Room)
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Declaration Cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby confirm,
agree and undertake that all the Statutory and Safety Laws and Regulations of the applicable
Authority/ies shall be strictly followed for all types of works at the site during the period of the
Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Disputes/ Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
______________________ on behalf of ………Name of Party/Company………..hereby
confirm that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings
/ Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three (03) years. There are no ongoing/pending legal matter(s)
with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts. /
Authorities and Govt. of Gujarat supported companies / undertakings / organizations for the
last three( 03) years.
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in
this regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
Schedule of Deviation from Technical Specification and Commercial Terms
All the deviations from the terms & conditions of contract shall be filled by BIDDER
clause by clause in this schedule.
Sr. No SECTION CLAUSE AS PER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from
OWNER’s Tender enquiry. The bidder further confirms that in the events any other data
and information presented in the BIDDER’s proposal and accompanying documents are at
variance with specific requirements laid out in the OWNER’s Tender Document, then the
latter shall govern and will be binding on the BIDDER for quoted price.
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide
No. information here.
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
PROCEDURE FOR MAKING ONLINE PAYMENT OF EMD/SD/TENDER FEE
1. For making online payment, first go to the website: www.gipcl.com
2. Then, click on the caption/link as can see like:
“Click here for Making Online Payment of Advance for Ash, DM water etc.”
(The link is visible as horizontal highlighted below Tenders - News & Update Section)
3. After clicking the link the new page will open. On this page, No need to enter User
Name and Password. Directly click on “ Payment Form” given below the sign in option.
4. After clicking the “Payment Form”, the vendor has to enter the details asked which will
be self explanatory. It is desired that all the information may be filled correctly so that
the payment made can be tracked.
If the some required fields are not known/available, vendor may write “Not Available” and
then proceed. E.g. some information like Party code is not available to vendor or GST
No. not available with vendor.
Optional Note: Although mentioned as above can be proceeded with “Not available”,
It will be appreciated that regular vendors may obtain the party code from Materials
or Concerned Person , so that the vendor can be identified. The same party code may
be used for future transactions also After entering the details, click on SUBMIT
5. he vendor/Party will be redirected to Payment Gateway.
By selecting the desired payment mode, payment can be made:
6. After making the payment, the receipt will be generated which has to be shared with
Concerned Person of GIPCL.
Important Note: Please note that for making online payment through the above gateway,
the charges* as below will be applicable, which has to be borne by Vendor/Party making
Payment Mode Charges
Net Banking Rs.9 + GST
Credit Card 0.75% + GST
International Card 3.00% + GST
Tender for “Surat Lignite Power Plant: 4 X 125 MW, Unit # I to IV – BMC for Monitoring & Maintenance services for STP &
Recycling Plant at colony and Monitoring services for PT, ETP & Run Off System at DM Plant in Plant premises for two years
of contract period”. Bid No.: SLPP/Civil/STP & ETP/ 2026-28
CERTIFICATE OF COMPLIANCE BY CONTRACTOR
(To be submitted with each monthly bill on letter head along with labour compliance records)
of.........................to .......................... at Gujarat Industries Power Company Limited – Surat
Lignite Power Plant, Nani Naroli. I undertake to be bound by all the provisions of the
Contract Labour (Regulation & Abolition) Act 1970 and the Contract Labour (Regulation &
Abolition) Rules 1972, The Employees’ Provident Funds and Miscellaneous Provisions Act
1952, Minimum Wages Act 1948, Payment of Wages Act 1936 and Payment of Bonus Act
1965 and all other applicable labour laws in so far as the provisions are applicable to me in
respect of the employment of contract labour by me for the month of ................................
Authorized Signature with Stamp
Place: Nani Naroli
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BG Format.pdf
Tender Documents.pdf
Download all tender documents and submit your bid